Presentation is loading. Please wait.

Presentation is loading. Please wait.

Green Roads Certification Processes 04/10/2015. Green Roads Certification is aligned with the values of Imagine Austin Todd Lane project will: – Implement.

Similar presentations


Presentation on theme: "Green Roads Certification Processes 04/10/2015. Green Roads Certification is aligned with the values of Imagine Austin Todd Lane project will: – Implement."— Presentation transcript:

1 Green Roads Certification Processes 04/10/2015

2 Green Roads Certification is aligned with the values of Imagine Austin Todd Lane project will: – Implement the Complete Streets Policy – Invest a Compact and Connected Austin by providing a vibrant corridor that accommodates traffic needs while improving pedestrian and bicycling accessibility via an alternative geometric design. (IA Priority Program #1) – Sustainably manage our water resources by integrating green infrastructure and sustainable development through innovative water quality features (IA Priority Program #2) – Use Green infrastructure to protect environmentally sensitive areas and integrate nature into the City by defining what roadway project features contribute to sustainability & provide an accounting tool for sustainability benchmarking. (IA Priority Program #4) – Support the Imagine Austin Growth Concept Overall goal: improve roadway sustainability T

3 Imagine Austin Growth Concept Map: Vision for where the City should invest and redevelop in order to become more “Compact and Connected” Todd Lane Designated as: Activity Corridor Neighborhood Center Jobs Center T Imagine Austin Growth Concept Map

4 What are the benefits of greening our roads? Greenroads do good things: Lower lifecycle costs Lower user cost Healthier communities and people Reduced environmental impacts 4

5 What’s inside? Each Project Requirement or Voluntary Credit has these: – Goal – Requirements to meet the credit intent – Documentation to submit – Supporting information Suggested approaches and strategies Examples Potential issues Research Glossary References – Relationships to related credits, sustainability components and measureable benefits 5

6 Certification Levels 6 32-42 points43-53 points54-63 points 64+ points PR + 30% VCPR + 40% VCPR + 50% VCPR + 60% VC Version 1.5: 108 Voluntary Credit Points

7 RequirementDescription PR-1Environmental Review ProcessComplete and environmental review process PR-2Life Cycle Cost AnalysisPerform LCCA for pavement section PR-3Life Cycle InventoryPerform LCI of pavement section using a tool PR-4Quality Control PlanHave a formal contractor quality control plan PR-5Noise Mitigation PlanHave a construction noise mitigation plan PR-6Waste Management PlanHave a formal plan to divert C&D waste from landfill PR-7Pollution Prevention PlanHave a TESC/SWPPP PR-8Low-Impact DevelopmentFeasibility study for LID stormwater management PR-9Pavement Mgmt. SystemHave a pavement management system PR-10Site Maintenance PlanHave a site maintenance plan PR-11Educational OutreachPublicize sustainability information for project 7 Project Requirements

8 Voluntary CreditPts.Description EW-1Environmental Mgmt. Sys.0ISO 14001 or eq. cert. for general contractor EW-2 Runoff Flow Control 3 Capture stormwater/reduce runoff quantity EW-3 Runoff Quality 3 Treat stormwater to a higher level of quality EW-4 Stormwater Cost Analysis 1 Conduct an LCCA for stormwater BMP/LID EW-5 Site Vegetation 3 Use native low/no water vegetation EW-6 Habitat Restoration 0 Create new habitat beyond what is required EW-7 Ecological Connectivity 0 Connect habitat across roadways EW-8 Light Pollution 3 Discourage light pollution Total13 Environment & Water 8

9 Voluntary CreditPts.Description AE-1Safety Audit2Perform roadway safety audit AE-2Intelligent Transp. Sys. (ITS)0Implement ITS solutions AE-3Context Sensitive Design5Plan for context sensitive solutions AE-4Traffic Emissions Reduction5Reduce VMT or SOV travelers AE-5Pedestrian Access2Provide/improve pedestrian accessibility AE-6Bicycle Access2Provide/improve bicycle accessibility AE-7Transit/HOV Access2Provide/improve transit/HOV accessibility AE-8Scenic Views0Provide views of scenery or vistas AE-9Cultural Outreach0Promote art/culture/community values Total18 Access & Equity 9

10 Voluntary CreditPts.Description CA-1Quality Management Sys.0 ISO 9001 cert. or eq. for general contractor CA-2Environmental Training0Provide environmental training CA-3Site Recycling Plan1On-site recycling and trash collection CA-4Fossil Fuel Use Reduction0Use alt. fuels in construction equipment CA-5Eqpt. Emission Reduction0Meet EPA Tier 4 stds. for nonroad equipment CA-6Paver Emission Reduction1Use pavers that meet NIOSH requirements CA-7Water Use Tracking2Develop data on water use in construction CA-8Contractor Warranty0Warranty on the constructed pavement Total4 Construction Activities 10

11 Voluntary CreditPts.Description MR-1Life Cycle Assessment (LCA) 2 Conduct a detailed LCA of the entire project MR-2Pavement Reuse 5 Reuse existing pavement sections MR-3Earthwork Balance 0 Balance cut/fill quantities MR-4 Recycled Materials4 Use recycled materials for new pavement MR-5Regional Materials 5 Use regional materials MR-6Energy Efficiency 5 Improve energy eff. of operational systems Total19 Materials & Resources 11

12 Voluntary CreditPts.Description PT-1Long-Life Pavement5Design pavements for long-life PT-2Permeable Pavement0Use permeable pavement as a LID technique PT-3Warm Mix Asphalt (WMA)0Use WMA in place of HMA PT-4Cool Pavement0Contribute less to urban heat island effect PT-5Quiet Pavement0Use a quiet pavement to reduce noise PT-6Pvmt. Performance Tracking0Relate construction to performance data Total5 Pavement Technologies 12

13 Custom CreditsPts.Description CC-XYour Title Here2Write your own credit CC-1Alternative Energy0Use renewable energy in operations CC-2Low Emitting Materials0Use materials with low VOCs CC-3Freight Access2Improve mobility for freight CC-4Design for Disassembly0Plan for deconstruction at end-of-life CC-5Aesthetics & Visual Quality1Use aesthetic treatments or enhancements CC-6Workzone Safety1Improve safety of the construction site CC-7Electric Vehicle Infrastructure0Encourage development of EV infrastructure CC-8Pavement Smoothness0Extend roadway life and improve ride quality CC-9Native Revegetation0Restore local areas habitat disturbed by roads CC-10Educated Professionals0Have a team of credentialed STPs Total6Max Custom Credits 13

14 14 CategoryDescription Est. Points Max Points Project RequirementsMinimum requirements for a Greenroad Req. Voluntary Credits Environment & WaterStormwater, habitat, vegetation13 21 Access & EquityModal access, culture, aesthetics, safety18 30 Construction Activities Construction equipment, processes, quality 4 14 Materials & ResourcesMaterial extraction, processing, transport1923 Pavement TechnologyPavement design, material use, function5 20 Total Voluntary Credit Points108 Custom CreditsWrite your own credit for approval610 Total Points 65 118 Greenroads Categories: Version 1.5

15 Certification Process Apply Determine eligibility Register project online Agree Sign Review Agreement Pay fees Assess Upload documents Get feedback Award Report performance periodically Display logo 15


Download ppt "Green Roads Certification Processes 04/10/2015. Green Roads Certification is aligned with the values of Imagine Austin Todd Lane project will: – Implement."

Similar presentations


Ads by Google