Presentation is loading. Please wait.

Presentation is loading. Please wait.

10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s.

Similar presentations


Presentation on theme: "10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s."— Presentation transcript:

1 10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s

2 10/08/20152 Agenda Ensuring a continuous process – introducing the ’Plan-Do-Check- Act’ Cycle Working with action plans as a continuous process Communicating about action plan achievements

3 10/08/20153 The ’Plan-Do-Check-Act’ Cycle (www.dartmouth.edu)

4 10/08/20154 The ’Plan-Do-Check-Act’ Cycle – cont.  The model provides a framework for the improvement of a process or system  It can be used to guide the entire improvement project, or to develop specific projects once target improvement areas have been identified  The PDCA cycle is a dynamic model  The completion of one turn of the cycle flows into the beginning of the next

5 10/08/20155 The ’Plan-Do-Check-Act’ Cycle – cont.  Plan: You analyse what you intend to improve, looking for areas that hold opportunities for change  Do: You implement the change you decided on in the plan phase  Check: After you have implemented the change, you check whether you have achieved the desired results, and assess what was learned and what went wrong  Act: After planning, implementing and monitoring a change, you must decide whether to continue that particular change. If it consumed too much time, led to no improvement etc., you may abort the change and plan a new one. However, if the change has led to a desirable improvement or outcome, you may consider expanding the trial to a different area. This sends you back into the plan phase of the cycle

6 10/08/20156 The PDCA Cycle and action plans Needs assessment Needs assessment report Action plan (implementation process outline, indicators, responsible person(s), deadline) Implementation of activities, training and assistance Measurement of results against indicators in action plan Corrective actions Expansion of action plan

7 10/08/20157 ‘Plan’ phase Needs assessment Needs assessment report Action plan (implementation process outline, indicators, responsible person(s), deadline)

8 10/08/20158 Needs assessment report IssueFindings Emergency managementEmergency management system is not in place in the production area. There is a risk of fire for which the company has already been advised to introduce safety mechanism.

9 10/08/20159  Labour Standards (wages, working time, social security, worker involvement, communication and training)  Management and Production Planning (supply chain management, lean management)  Health and Safety (ergonomics, ventilation/ heat, dust, emergency preparedness, handling of chemicals)  External Environment (energy savings, pollution prevention, waste water, solid waste) Action plan - Content

10 10/08/201510 Action plan

11 10/08/201511 Action plan – cont.

12 10/08/201512 ‘Do’ phase Implementation of activities Training and assistance

13 10/08/201513 Implementation of activities

14 10/08/201514 ‘Check’ phase Measurement of results against indicators in action plan

15 10/08/201515 Measurement of results against indicators in action plan Measurement of results

16 10/08/201516 ‘Act’ phase Corrective actions Expansion of action plan

17 10/08/201517 Modified activities Expansion of action plan Corrective actions

18 10/08/201518 Action Plan follow-up visit

19 10/08/201519 CSR communication Communication


Download ppt "10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s."

Similar presentations


Ads by Google