GroundMed DAQ/DMS Training Coimbra 6-12-2011 Andre Quintino Duarte Anibal T. de Almeida Joao Fong.

Similar presentations


Presentation on theme: "GroundMed DAQ/DMS Training Coimbra 6-12-2011 Andre Quintino Duarte Anibal T. de Almeida Joao Fong."— Presentation transcript:

1 GroundMed DAQ/DMS Training Coimbra 6-12-2011 Andre Quintino Duarte Anibal T. de Almeida Joao Fong

2 Summary 1. DAQ - Data Acquisition System 1.1. Hardware Installation 1.1.1. Devices’ Assemblage 1.1.2. Power Connections 1.1.3. Communication Connections 1.1.4. Sensors Connections 1.2. Software Installation 1.2.1. Software Configuration 1.2.2. Measuring Utility 2. DMS - Data Management System (NEW) 3. Further Development in Coimbra 4. Questions and Answers 5. Coimbra GroundMed facility visit

3 Info All information available at: www.isr.uc.pt/~groundmed

4 Info All information available at: www.isr.uc.pt/~groundmed

5 1. DAQ - Data Acquisition System

6 National Instruments cRIO 9074

7 1. DAQ - Data Acquisition System National Instruments cRIO 9074 NI 9217 NI 9219 NI 9871

8 1. DAQ - Data Acquisition System DAQ

9 1. DAQ - Data Acquisition System DAQ Brunata Thermal Meters Pyranometer Indoor/Outdoor Temperature Sensors Humidity Sensor Carlo Gavazzi Meters

10 1. DAQ - Data Acquisition System DAQDAQ DAQDAQ DAQ System DAQ System

11 1. DAQ - Data Acquisition System Septemes les Vallons, France DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System DAQ System Oradea, Romenia Coimbra, Portugal Benedikt, Slovenia Valencia, Spain Barcelona, Spain Padova, Italy Athens, Greece Internet DMS Serve r Ground Med WebSit e Ground Med WebSit e

12 1.1. Hardware Installation 1.1.1. Device’s Assemblage

13 1.1. Hardware Installation 1.1.1. Device’s Assemblage Coimbra

14 1.1. Hardware Installation 1.1.1. Device’s Assemblage Barcelona

15 1.1. Hardware Installation 1.1.2. Power Connections

16 1.1. Hardware Installation 1.1.3. Communication Connections

17 1.1. Hardware Installation 1.1.3. Communication Connections Important: - Create an RS-485 network; - Use shield cable with 2 twisted pairs; - Connect shield to ground; - Connect a 120Ω resistor on the edges of the network; - All the devices on the network must have different addresses; - The order is not important.

18 1.1. Hardware Installation 1.1.3. Communication Connections

19 1.1. Hardware Installation 1.1.4. Sensors Connections

20 1.1. Hardware Installation 1.1.4. Sensors Connections Sensors: - Indoor Temperature Sensor; - Outdoor Temperature Sensor; - Pyranometer; - 2x Brunata (Flow Sensor and 2 Temperature Sensors each); - Current Transformers; - Humidity Sensor (Optional).

21 1.1. Hardware Installation 1.1.4. Sensors Connections

22 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Don’t mix Brunata Temperature Sensors; Temperature Probes Brunata Display Unit

23 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Don’t mix Brunata flow sensors; Flow sensor Brunata Volume Meter

24 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Each Brunata Display Unit has one and only one Volume Meter. Brunata Volume Meter Brunata Display Unit

25 1.1. Hardware Installation 1.1.4. Sensors Connections

26 1.2. Software Installation

27 Download and Install in this order: 1. NI cRIO Drivers (about 1600MB)http://joule.ni.com:80/nidu/cds/view/p/id/2411/lang/e n; 2. RTAD Application Installer (about 10MB) http://zone.ni.com/devzone/cda/epd/p/id/5986;3. Asynchronous Message Communication (AMC) reference library (about 6MB) (Not required anymore) http://zone.ni.com/devzone/cda/epd/p/id/6091;4. Reference Library for Reading cRIO System Configuration Information (about 6MB) (Not required anymore)http://zone.ni.com/devzone/cda/epd/p/id/1717;5. GroundMed software from ISR available at: www.isr.uc.pt/~groundmed;6. GroundMed Configuration Utility;7. GroundMed Measurement Utility.

28 1.2.1. Software Configuration

29 1.2. Software Installation 1.2.1. Software Configuration Set cRIO Time Zone, Time & Date: 1. Load MAX (Measurement & Automation) on the computer;2. Click on Remote Systems, then the cRIO module available;3. On the right size, click below on Time Settings;4. Set your Time Zone, Date and Time;5. Click above on Save.

30 1.2. Software Installation 1.2.1. Software Configuration Demonstration

31 1.2. Software Installation 1.2.1. Software Configuration Run RT Application Deployment: Your cRIO Software to install 1) Press Settings under “Application Images”; 2) Browse to load the GroundMed downloaded image; 3) Press “Deploy”.

32 1.2. Software Installation 1.2.1. Software Configuration Demonstration

33 1.2. Software Installation 1.2.1. Software Configuration - 8 different demonstration sites Does this means 8 different software versions?

34 1.2. Software Installation 1.2.1. Software Configuration

35 1.2. Software Installation 1.2.1. Software Configuration

36 1.2. Software Installation 1.2.1. Software Configuration

37 1.2. Software Installation 1.2.2. Measuring Utility

38 1.2. Software Installation 1.2.2. Measuring Utility

39 1.2. Software Installation Demonstration

40 3. Further Development in Coimbra

41

42 NI 9472 - 8 Sourcing Digital Outputs; - 6 to 30V range. Finder Relay 20.21.9.024.4000 - 24V Coil Voltage; - 250V AC Rated Voltage.

43 3. Further Development in Coimbra

44 5. Coimbra GroundMed facility visit 4. Questions and Answers

45 5. Coimbra GroundMed facility visit Thank You Andre Quintino Duarte Anibal T. de Almeida Joao Fong


Download ppt "GroundMed DAQ/DMS Training Coimbra 6-12-2011 Andre Quintino Duarte Anibal T. de Almeida Joao Fong."