0 ANITA Work Breakdown Structure and Schedule
K. Liewer

1 Proposal Work Breakdown Structure
Project Management UH/JPL Mission System Eng. UH/JPL/Bartol/Penn Science Instrument Development UH/Bartol/Penn Gondola Development UCI/Penn/UM Payload Integration UCI Calibration UCLA/UH Operations UCLA/UH/JPL NOTE: box size proportional to budget

2 WBS item description Project management Mission system engineering
PI and project manager support Mission system engineering EMI survey environmental testing system engineering mission assurance Science algorithm/software development science data analysis Instrument development antennas, front end (RF/IF), digitizers flight computer and storage, flight software LOS telemetry refurbishment

3 WBS description (cont’d)
Gondola development engineering workforce materials and services power system development payload integration engineering workforce, materials integration and test support Calibration antenna calibration Antarctic calibration system calibrate system and deploy Operations ground data system development data acquisition and archiving instrument packaging and delivery operations support

4 Task flow diagram

5 ANITA schedule from proposal

6 Concerns We are roughly 1/2 year behind schedule
scheduled requirements review is one (short) month away originally planned two quarters of work preparing requirements ‘03 money will probably not arrive until beginning of third quarter may not cause a big slip; but it can’t help Schedule is just a strawman fidelity should improve as we progress through the review cycle work does not tend to shrink need to find realistic ways to shorten up the schedule if we are to make the ‘06/’07 launch window

7 Needs Preliminary requirements ASAP
List of receivables and deliverables make sure nothing gets left undone (or done twice) make sure everyone knows their responsibilities Estimates from the doing organizations on cost and schedule