1 MICE Project Report Paul Drumm ~ Sunday August 1 st 2004

2 Absorber Tests @ FNAL – MuCool RF-Cavity & Coupling Coil – MuCool RF Power Source Design Safety Review - Responses Cryo cooler implementation –Sign off on this? Work in MICE hall – Completed plan WBS – Schedule & Costs –Involves few people – but needs review… Progress since CERN CM8

3 Technical ISSUES for Now Cryo coolers –Appropriate for MICE? –Appropriate for a NF –Consequence to use of Liquid Helium Shielding Downstream of MICE –Larger gap; reduced forces; bigger detectors –Can we sign off on this? Shielding of MICE tracker –Positive moves – benefits to optics, coupling & forces (although forces are larger)

4 Technical ISSUES for Next CM Layout in hall –Alignment & Fixation – compatible with… Force Distribution & Control Staging of MICE Opened up the understanding of the optics –Does MICE do what we want? proposal; MICE notes 49, 83…

5 ISIS Schedule Significant issue since March has been a change in the ISIS shutdown schedule ISIS normal “long” shutdown is a few weeks 6 month shutdown in ’04 current –300  Amp upgrade –Installation of ISIS RFQ Next long shutdown moved into ’06 –Beam line to TSII Mid 2005 -

6

7 2004 Shutdown

8 Engineering Schedule - Funding Driven Factors not yet Known/applied

9 Cost Estimates From WBS in round numbers £2.3M £3.2 £5.0 £6.5 £7.3 £9.6 £11… “with additional costs ~£24M ”

10 NOTES WBS –At some point will need to be reviewed –At that time, we will need to look at the provenance of the information & the assumptions behind the contingency TRD –Available on web since CM8 –Not polished to the point of publication but is as complete as can be; useful reference; –Review/Revise for October CM10 GW2 in mind - INFN… - NSF&DOE

11 And Finally Cryo coolers Shielding Downstream of MICE Shielding of MICE tracker MICE Beam Optics Force Distribution