FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.

Similar presentations


Presentation on theme: "FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design."— Presentation transcript:

1 FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design reviews will build to an ARR

2 FAC 4/20/06 D. Schultz 2 DOE order 420.2b, Safety of Accelerator Facilities Requirements for Commissioning: A SAD must: (abridged version) Identify and describe hazards Document engineering and administrative controls to control/mitigate those hazards An ASE (Accelerator Safety Envelope) Defines safe operations based on the safety analysis in the SAD. An ARR (prior to commissioning) Verifies that hardware, personnel, and procedures associated with commissioning or routine operation are ready to permit the activity to be undertaken safely. Personnel training, Written Procedures, Commissioning plan, SAD, ASE, and ARR

3 FAC 4/20/06 D. Schultz 3 Status of the SAD LCLS is being integrated into the SLAC Linear Accelerator Facility SAD, which is being updated & revised. The Lab (S. Williams) is coordinating the revision of the SAD. Writers from AD and LCLS. The LCLS Injector sections will be incorporated by June 2006.

4 FAC 4/20/06 D. Schultz 4

5 FAC 4/20/06 D. Schultz 5 Table of Contents Chapter 1. Introduction Purpose Scope Hazard Classification Chapter 2. Summary/Conclusions Chapter 3. Description of Site, Facility, and Operations Site Description Geology Seismicity Hydrology Climate Facility Description Linear Accelerator LCLS Sector-20 to Sector-30 North and South Damping Rings Positron Source LCLS Source Beam Switchyard South Arc End Station A LCLS Beam Lines, Undulators Research Organization Proposal Review System EPAC Operating Organization Operations Safety Training Maintenance Ionizing Radiation Radiation Safety Systems Overview Personnel Protection System Beam Containment System Beam Shut-off Ion Chamber System Shielding Design Chapter 4. Safety Analysis Methodology Ionizing Radiation Fire Safety Hazardous Materials Electrical Hazards Non-ionizing Radiation Flammable Gases or Fluids Earthquake Hazards Chapter 5. Accelerator Safety Envelope Ionizing Radiation Discussion of Maximum Power Chapter 6. Quality Assurance Chapter 7. Decommissioning Chapter 8. References Site-Wide Documentation Safety Assessment Documents Accelerator Systems Division Documents SAD TOC (based on the old SLAC SAD)

6 FAC 4/20/06 D. Schultz 6 Status of the ARR Design Reviews Component and System PDRs and FDRs are being conducted following LCLS guidelines. Safety aspects are a normal part of the technical requirements. Working to report safety analyses in a uniform way to facilitate future assessments. SLAC Citizen’s Committees will participate in the review process, following normal SLAC practice. Citizen’s Committees involvement specified through the SLAC Safety Oversight Committee. Need to ensure that all aspects of the project are reviewed, and that the completeness is presentable in a coherent way.

7 FAC 4/20/06 D. Schultz 7 Status of the ARR Accelerator Readiness Review LCLS ARR for Injector Commissioning will take place Sept.- Nov. 2006, once Citizen Committees’ reviews are complete and the SOC is satisfied. Working with the DOE SSO to ensure that the review process outlined here will be appropriate.

8 FAC 4/20/06 D. Schultz 8 The SAD is being written as a part of the SLAC LINAC SAD. This work is underway, there is a lot to do, and the effort needs to pick up momentum. Design reviews and documentation, including SLAC Citizen's Committee reviews, will serve as a vital base for the ARR. The ARR itself will be made less traumatic through the preparation of these reviews. Conclusion