Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group V ICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K.

Similar presentations


Presentation on theme: "Group V ICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K."— Presentation transcript:

1 Group V ICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K

2 ERO Level Hardware Desktop Computers, Laser Printers, Scanners UPS, DG Set (for problematic areas) Digital Camera, Android Phone Connectivity Leased Line (NICNET/ SWAN) / VPNoBB Router / Switch/ Cables/ IO Boxes Manpower Office Asstt./ Data Entry Operators (data entry/ reports/ EPIC/ Complaint handling) Software Office Automation Suite (MS Office 2010 pro) AVS

3 DEO Level Hardware Desktop Computers, Laser Printers, Scanners UPS, DG Set (for problematic areas) Android based Phone Connectivity Leased Line (NICNET/ SWAN)/ VSAT Router / Switch/ Cables/ IO Boxes Video-Conferencing setup Manpower Assistant Programmers Data Entry Operators (data entry/ reports/ EPIC) Software Office Automation Suite (MS Office 2010 pro) AVS

4 CEO Level Hardware Desktop Computers, Multifunctional Devices UPS, DG Set (for problematic areas) Android based Phone Connectivity Leased Line (NICNET/ SWAN)/ VSAT Router / Switch/ Cables/ IO Boxes Video-Conferencing setup Manpower IT Manager Systems Analyst Programmers Data Entry Operators (data entry/ reports/ EPIC) Software Office Automation Suite (MS Office 2010 pro) AVS

5 State Level Setting up of Computer / IT centre Design and Development Team Reporting Team Testing/ debugging/ Staging / Deployment Team Hardware and Networking Team Documentation Team Benchmarking and Standardization of all activities Applications Development Activities Hardware and Networking Infrastructure Software Maintenance Activities Hardware High-end Blade Servers with Blade enclosure and FC-FC pass- through (Application /DB/ Replication/ Web/ Staging/ FTP) Multifunctional Device High rating online UPS DG Set (for problematic areas) SAN Storage (depending upon size of database)

6 State level Disaster Recovery Site (in a different city/state) Connectivity Leased Line (NICNET/ SWAN)/ VSAT ManpowerDBA Network Admin HW expert Documentation in charge/ technical writer Analysts/ programmers Software Licensed OS (say Windows 2008) Licensed RDBMS (say SQL Server 2008 or above) Office Automation Suite (MS Office 2010 pro) AVS

7 Capacity Building E-Governance Lifecycle training Training on BPR Training on OB and Change Management Training on Contract Management NISG may be roped in At least 2-3 training programs/ seminars/ workshop every year at various levels

8 Some more Suggestions Strengthening of Election Machinery at all levels with dedicated officers/ officials: Addl./ Jt. /Dy. CEO Section Officer Assistants (UDC/ LDC) Peons Dedicated BLOs (other than teachers) Mobile Phone SIM to be provided to BLOs GPS hand-held devices for PSL mapping CUG network for CEO/DEO/ERO/AERO Online Discussion Forum (using Collaboration Tools)

9 Thanks


Download ppt "Group V ICT Infrastructure Requirements Saleem Khan Additional SIO, NIC J&K."

Similar presentations


Ads by Google