NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2005

Similar presentations


Presentation on theme: "NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2005"— Presentation transcript:

1 NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2005

2 Structure of the Presentation
NREGA Coverage NREGA Process Paradigm Shift: From SGRY to NREGA

3 National Rural Employment Guarantee Act,2005
For the enhancement of livelihood security of rural households by providing at least one hundred days of guaranteed wage employment in every financial year to every household whose adult members volunteer to do unskilled manual work

4 NREGA COVERAGE Backward Districts(150) (Most backward
Ranked by Planning Commission) Phase I NREGA(200) (commenced ) Phase II NREGA(130) (extended on ) Phase III NREGA(266) (notified on )

5 NREGA Process

6 Application for Registration
Step 1: Application for Registration Unit of Entitlement is the Household. Registration application made to local Gram Panchayat. Application may be in a form prescribed or a plain paper Prescribed form is free of cost and easily available at GP Oral applications may also be submitted

7 Verification of the Registration Application
Step 2: Verification of the Registration Application The Gram Panchayat will verify the application on the basis of: (i) local domicile (ii) All household members applying for registration are adult - No discrimination is made in registration in terms of caste, creed, gender - Single Women living alone may register independently - NREGA is not confined to BPL families

8 Registration for Job Card
Step 3: After verification, the house hold will be registered Unit of Registration: Household (HH) The names of adult members applying will be noted Registration Register

9 Issue of Job Card Step 4: Issue of Job Card
Basic legal document valid for five years. Enables registered household to demand guaranteed employment Issued to a registered household as a whole Household Job Card will have photograph & name of each registered adult member of the household on it Cost of Job Card including photograph will be borne by the programme Should be issued within 15 days of application.

10 Format of Job Card Must have space for entering vital data that must be regularly entered that includes: - Unique registration number Days of employment demanded Days worked Amount paid Job Cards issued will be entered in a Job Card register in the Gram Panchayat

11 Demand Process: Application for Employment
Step 5. Application for Employment Household with Job Card has the right to submit a written application for employment to the Gram Panchayat Any member may apply: More than one member of a family may apply at the same time (subject to 100 day family entitlement) Applicant may chose the time and duration when employment is sought Application must state day from which employment is sought and duration Application must be for a minimum of 15 days of employment

12 Guarantee Process : Acknowledgement of Application for Employment
Step 6: Issue of Dated Receipt Employment application will be entered in an Employment Register in the Gram Panchayat The Gram Panchayat has to issue a Dated Receipt of the written application for employment

13 Guarantee Process :Allocation of Employment
Step 7: Allocation of Employment Employment within 15 days of work application or date from which employment is sought, which ever is later If applicant does not report for work no unemployment allowance payable Can reapply Employment within 5 km radius of village. 10% of the wage rate as extra wages paid if distance more than 5 km Intimation of work provided has to be sent in writing & through public notice at the Village Panchayat office

14 Payment of Unemployment Allowance
If Employment is not provided within 15 days, daily unemployment allowance, in cash has to be paid. States will pay the Unemployment Allowance at their own cost

15 Planning of Works Planning of works to allocate employment within guaranteed time Works selected from the list of permissible works under Schedule I of the Act Permissible works are as follows: -Water Conservation -Drought Proofing( including plantation and afforestation) -Flood Protection -Land Development -Minor Irrigation, horticulture and land development on the land of SC/ST/ -BPL/IAY and Land reform beneficiaries -Rural connectivity 60:40 ratio of wages and materials to be maintained May be maintained at the district level.

16 Planning Process Decentralised, Participatory Process. PRIs principal role Gram Sabhas Initiate Planning process and recommend works Gram Panchayat consolidate recommendations of Gram Sabha into Village Development Plans and forward to intermediate Panchayat level Intermediate Panchayat: Programme Officer will consolidate Gram Panchayat Plans into Block Plans with addition of works that cut across gram panchayats for approval of Intermediate Panchayat District Panchayat: District Programme Coordinator will consolidate Block Proposals and proposals received from other implementing agencies for inclusion in the shelf of projects to be approved by the District Panchayat

17 Execution of Work Implementing Agencies
No fixed percentage allocation of works as in SGRY:50-GP/30 –IP/20-ZP At least 50 % of the works has to be allotted to Gram Panchayats Other Implementing Agencies: -Other Panchayati Raj Institutions (PRIs) -Line departments (PWD, Forest Dept.) -NGOs -SHGs Private contractors are banned

18 Payment of Wages Statutory minimum wage for agricultural labourers in the state, unless the Central Government “notifies” a minimum wage not less than Rs. 60/day Wages paid weekly, or in any case not later than a fortnight Only Cash

19 Mandatory Worksite Facilities
Drinking water Shade Medical aid Creche if more than five children below age 6 are present Note: These facilities are to be provided by the implementing agency

20 Public Accountability
GS will conduct social audits of all works taken up within GP All accounts and records relating to the Scheme are to be made available for public scrutiny and any person desirous of obtaining a copy of such records may be provided such copies on demand and after paying specified fee A copy of muster rolls of each work has to be made available at Gram Panchayat & to Programme Officer [at the Block level] for inspection by any person interested after paying specified fee DPCs, Pos and GPs to Prepare Annual Report

21 EGS: Cost sharing Central Government to pay for:
wage costs, 75% of material costs, and some administrative costs. State governments to pay for: 25% of material costs other administrative costs, unemployment allowance.

22 Paradigm Shift: From SGRY to NREGA

23 Other Wage Employment Programmes(SGRY)
Issue Other Wage Employment Programmes(SGRY) NREGA Status Programme Statute Focus Infrastructure Employment generation Process Supply led. Works opened by implementing agencies & then labour is engaged Demand-based. Application by Wage seekers for employment and then works are opened Labour Any one can be engaged as labour Only Job Cards holders that apply for employment Time frames None Employment within 15 days of demand, Payment within 15 days of work Duration of Employment Dependent on duration of work by implementing agency Legal Guarantee of as many days of employment as a job card holder applies for, subject to maximum 100 days

24 Other Wage Employment Programmes(SGRY) NREGA
Issue Other Wage Employment Programmes(SGRY) NREGA Nature of works Any work No 60:40 ratio of wage -material 60:40 ratio of wages and material Permissible works: Financial Support -25% State share -75% Centre share -Fixed Allocation to State -Fixed share to each PRI tier: 20%-ZP 30%-IP 50%-GP -Demand Based. -No fixed allocation to State -No fixed allocation to PRI. Incentive structure in the release of Central share Central Funds are released on the basis of Demand for employment received in a district and the districts provision of guaranteed employment within 15 days. 90% assistance from Centre if employment is provided within 15 days of demand. If not, then State will pay unemployment allowance at its own cost.

25 Thematic Discussion

26 Roles, functions and responsibilities of key agencies

27 Agencies with Critical Functions
Gram Sabha: Panchayats: Principal agencies for planning and implementation Gram Panchayat : basic unit of implementation. In each Block, a Programme Officer is to coordinate the implementation of EGS District Programme Coordinator at district level:Collector /CEO State Employment Guarantee Council

28 Functions related to Demand for Employment GP
DPC ZP PO IP GP Building Awareness among community *** **** Receiving applications for registration Verifying applications for registration Issue of Job Card Receipt of employment application Issue of dated receipt Allocation of employment within 15 days of demand Unemployment allowance

29 Functions related to Planning of Works
DPC ZP PO IP GP Other implementing agencies Gram Sabha Convening Gram Sabha for Planning works **** Recommending works(Village) Consolidating Gram Sabha recommendations into Village Plan Forwarding Village Plan to Block Consolidating GP recommendations into Block Plan ***

30 ** *** **** Functions related to Record, Report, Review, Redressal
DPC ZP PO IP GP Other Implementing agencies Gram Sabha Village Registers ** MPR *** Data consolidation computerisation, reporting Annual Report Quality monitoring &Control **** Social audit Grievance redressal

31 Functions related to Planning of Works
DPC ZP PO IP GP Other implementing agencies Gram Sabha Recommending works(Inter GP) ** Approving Block Plan Forwarding Block Plan to District Including works proposals from other implementing agencies *** Consolidating IP recommendations into District Plan

32 Functions related to Planning& execution of Works
DPC ZP PO IP GP Other implementing agencies Gram Sabha Approving District Plan **** Getting Technical estimates made for approved works ** *** Muster roll issue Muster roll maintenance Measurement Wage Payment Job Card entries

33 Functions related to Capacity development &Fund Management
State Govt DPC ZP PO IP GP Other implementing agencies Training *** ***** Personnel Placement **** Fund management Provision & release of State Share Release of funds to PO/IA Accounts Fund Release to implementing agencies/Accounts Payments/

34 Deployment and Training of Personnel

35 Positioning key personnel
District Programme Coordinator( DPC ) Programme Officer (P.O.) A Gram Rozgar Sewak at the GP level (local, 12th pass) - Registration -Verification of registration applications - Issue of Job Cards - Receiving applications for employment - Issue of dated receipts for employment applications -Reporting Demand to the Programme Officer so that work may be allotted to the implementing agency - Informing the applicants to report for work - Ensuring payments are made on time to the workers. - Reporting work progress and all other matters to the Programme Officer on a regular weekly basis.

36 Key Functional Areas for deployment of additional full time dedicated personnel
Level Key Functional Areas Personnel to be deployed GP 1 Gram Rozgar Sewak for each GP Block Programme management 1 Programme Officer for each Block Works Technical assistants pooled to service GPs IT , MIS Computer Assistants Finance Accountant. Distt Manager, Technical assistants Manager, Computer Assistants

37 Full time & dedicated to NREGS Contract/Deputation No permanent posts
Level Key Functional Areas Personnel to be deployed Distt Finance Accounts Manager with Accounts assistants Training Training Coordinator Social Audit, Grievance redresssal Coordinator All personnel to be: Full time & dedicated to NREGS Contract/Deputation No permanent posts

38 Administrative expenses permissible under the 4% financial limit
Information Education Communication (IEC) Training MIS Quality supervision: This includes monitoring and verification (specially muster roll verification) evaluation, Social Audit. Quality Monitors at the State, District and Block levels. Setting up grievance redressal systems Engaging professional services Operational Expenses: Office expenses related to the implementation of NREGS Stationery related to computational processes/MIS. Additional Staffing dedicated to NREGS in key functional areas of the Scheme at the Gram Panchayat/Block/District levels

39 Expenditure not permissible under the 4% administrative limit
Salaries/ remunerations/honoraria of functionaries already engaged by the Government/ PRIs / any other implementing agency. Personnel, other than indicated by the Ministry. Purchase of new vehicles and repair of old vehicles. Civil works

40 Administrative expenses apart from 4% limit
Expenditure on workers engaged to look after crèche on site/carry water - To be separately charged to unskilled wage cost -Not to be included as part of the work – measurement. One time expenses: Separate from the 4% permissible limit. -Preparation of Perspective Plan - Printing of job cards, photography -Augmentation of computational facilities at the Block and district level. -Almirahs for record-keeping and functional furniture at GP, Block and District-levels

41 Administrative expense as function of total expenditure
4% administrative expense: a function of the total expenditure under NREGA resulting into creation of person days in a financial year Need for a Management Plan to monitor total programme expenditure and outcomes to leverage appropriate management support to it

42 Training Key Functionaries for their Roles and Responsibilities
GP Block District GP members IP members ZP members Panchayat Secy Programme Officer Line Depts Gram Rozgar Sewak Engineers Mate Computer personnel Accounts personnel.

43 Activities under Training
Training calendar to be drawn up: Training load/Time Training modules to be calibrated in content and process according to different stakeholders Training materials: - Act & National NREGA Guidelines in local language - Manuals/ Hand books with FAQs * on different components *for different target groups -Films Osmosis Process for Training. -District Resource Group -Block Resource Group -Village resource group Integrated Groups of different stake holders for core components( Programme Processes) Separate Groups for specific skill sets(IT/Works/Accnts)

44 Components of Training
Enabling Local Communities to know their Rights under the Act Procedures for registration and issue of Job Card Procedures for employment application Procedures for Planning and Executing Works Maintenance of Muster rolls Norms of Measurement Wage Payment Update of Job Cards Maintenance of Records, data, Reports Maintenance of Accounts Unemployment Allowance Social Audit RTI

45 Impact Assessment of training
Concurrent assessment of the impact of the training programme to ensure that all key responsible agencies - Understand the provisions of the Act, - Their respective roles in it - Have the skills to implement it. Reiterative Cycles of training using the feedback

46 Social Mobilization Building Awareness and Involving Stakeholders

47 Building Awareness:Information, Education and Communication ( IEC)
Key Target Groups: Local work force engaged in manual labour Poor rural households SC/ST/women/ minorities Remote habitations Drawing up an IEC Plan Preparation of Communication material on NREGA processes in simple local language

48 Information Dissemination
An intensive One day orientation of all Sarpanches at the Block level A Gram Sabha in every village to acquaint local people with the key provisions of the Act. Participation of beneficiaries be ensured One day be fixed & publicised as Rozgar Diwas Use of multi media; TV and radio where ever possible. Print media –local vernacular newspapers. Pamphlets and brochures in simple local language with Graphics. Local cultural forms, like puppetry, folk theatre and music may be used at the village level

49 Information Dissemination
District personnel teams mobilised to camp and night halt in villages Information counters in the local Market days using audio-video material Village Information Wall NGOs to facilitate awareness generation Help Line - Telephone numbers of key officials publicized

50 Important aspects of NREGA for Communication
Guarantee of 100 days of employment upon Demand Application Process for registration and Job Card. Written application for demanding employment Dated receipt of the application for employment by the Gram Panchayat. Unskilled manual Work to be provided within 15 days of demand. If employment is not provided within fifteen days of application, unemployment allowance will be paid by the State Government Minimum wages for agricultural labour to be paid within 15 days of work completion Workers have the right to check their muster rolls. .

51 Feed back on IEC Every Gram Panchayat must give a certificate that it has convened a Gram Sabha in each village and acquainted the local community with NREGA provisions Concurrent assessment of the effectiveness of IEC activities must be done and any deficiencies that come to light, must be removed

52 Outcome Indicators of effective IEC
Local community aware of NREGA and its key processes: How and where to apply for registration Use of job card for demanding employment and recording entitlements, job card with photographs are free of cost. After receipt of job card, local community has chosen to apply for employment according to its own choice of time & days Dated receipt for application for employment is issued Authentic Muster rolls

53 Planning and Execution

54 Perspective Plan A 5 Year District Perspective Pan that must
-be village based -Map Physical Resources available: -Map social infrastructure available -Identify Gaps -Identify works that can be taken up as per NREGA permissible list -Identify resources available for them under existing programmes -Identify works and resources proposed to be budgeted under NREGA -Assess labour demand -Estimate employment likely to be generated from these works

55 Perspective Plan Need to match: -What local people want & -What will build their livelihood base -Participation of local communities and PRIs Professional expertise Districts may engage professional agencies Separate Guidelines for Perspective Plans will be issued Separate funds for making Perspective Plan will be given to districts

56 Preparing a Shelf of Projects
The Perspective Plan will take some time to prepare. In order to start work upon Demand, the District administration will ensure that each village has a shelf of projects. NREGA is open to all households in a village. But experience has shown that mainly the poor households come for employment under NREGA. Therefore, the number of works in a year in a village may be estimated by taking the village average of BPL families and deriving the total person days that will be generated by providing 100 days of employment to all these families. Shelf of projects in a village must be adequate to meet twice the times of estimated demand for employment for a year

57 Preparing a Shelf of Projects
Each village must have a shelf of projects of at least five works with technical and administrative approvals, ready to be drawn upon when demand for employment comes The plot numbers of the sites where works are to be executed should be mentioned, so that each work has a unique location code. The shelf of projects at the village level will comprise small projects that can be quickly executed within one working season Priority will be given to works that can be executed by the Gram Panchayat. Only such works that involve more than one GP may be taken up at the Intermediate Panchayat level. Outcomes expected from the works should indicate : -Estimated benefits in terms of person days - Physical improvement envisaged ( land/water conservation etc) - Benefits to the community

58 Executing Works List of approved works to be displayed at the GP.
Technical estimates to be displayed at all work-sites in simple local language. Mate for managing works: from among the Job Card holders. Progress report by Implementing Agency to local vigilance committee. Pre-Mid-Post Project condition to be recorded Asset register at GP with unique number to each work to prevent duplication

59 Muster Rolls Numbered Muster rolls will be issued for each sanctioned work by Programme Officer (this is a check on false muster rolls). Muster rolls will be maintained on the work site by the executing agency. Muster roll must mention Job Card numbers of workers (this is a check on false names and contractors). Muster roll will mention: days worked, quantum of work done, amount paid Muster rolls should be read out on the work site during measurement and wage payment to prevent bogus records Entries of the muster roll must be correspondingly recorded in the job cards of the workers If Line departments are identified as implementing agencies, they will have to be trained in undertaking labour intensive works and the maintenance of muster rolls for each work.

60 Measurement and Payment of wages
Schedule of rural rates based on work time and motion studies for labour intensive works should be formulated for measurement of work out turn. Regular measurement and supervision of works to be done by qualified technical personnel on time. Measurement to be recorded in authenticated measurement books. Measurement details should be read out to workers Wages may be paid in cash. Wages must be paid in front of the community. Wages may also be paid through Post/ Bank accounts of wage earners. Wages paid must be entered in the Job Cards.

61 Tracking number of days of employment
The number of days worked by all the members of a household whose names are on the job card person should have been entered on the muster rolls and the job card The total number of days actually worked by all the members of the household and recorded in muster rolls and the household Job Card is counted as Person days Do not divide total expenditure by wage rate to derive persondays Total number of person days of a household cannot exceed 100

62 Key Document, Records and Reports

63 Key Documents and Records
Principal Documents: Application forms for registration Job Cards Application Form for employment Muster Rolls with unique number Key Registers Registration Issue of Job Cards Demand and provision of employment Assets Finance Complaints. Printed documents must be distributed to the GP, Block and District levels All printed documents under NREGA will have the words National Rural Employment Guarantee Scheme, on top, followed by the name of the state These documents are the basis of NREGA Data Base and Reports Their Formats are compatible with electronic processing

64 Review & Reports Regular Review Once a Fortnight on a fixed day at Block by PO with Gram Rozgar sewaks Once a month on a fixed day at District by DPC with POs Once a month on a fixed day at State with DPCs Collect and discuss information on NREGA. Problem solving Monthly Progress Reports: Employment demanded and provided Persondays Financial status Works Reports: on line MIS

65 Management Information System

66 Operationalising MIS Priority to operationalising Web-based MIS to place all data in public domain Workers’ entitlements: Registration, job cards, muster rolls, Employment demanded and provided Work data: sanctioned shelf of works, work estimates, work in progress, measurement. Financial indicators: funds available/spent, amount paid as wages, materials and administrative expenses. Data software engineered, for cross verification of records and report generation. Data Analysis for consistency and Alerts for District/Stats Computerisation of Blocks: .computers& connectivity cost is additional to 4% limit Personnel Training Computers Connectivity:

67 Transparency Social Audit, Monitoring and Grievance Redressal Systems

68 Transparency Three Pronged -Proactive Disclosure
-Information upon Payment (RTI) - -Social Audit Proactive Disclosure All NREGA-related documents to be available for public scrutiny: *Key information in local language at GP level *Muster rolls to be read out & pro-actively displayed at Gram Panchayat Office. * Web-enabled MIS Documents to be made avaialable to public on payment of prescribed fee.

69 Social Audit System where local Community scrutinises all records and procedures of a programme, verifies its authenticity and whether the expenditure incurred has delivered its objective . The Implementing agency is bound to provide all necessary documents Social audit is in addition to the CAG audit Should be both concurrent ( of live works) and Post completion Social Audit by Gram Sabha of all works in a Gram Panchayat GP to provide records PO and DPC to facilitate through resource support: planning, training, ensuring access to records, follow -up

70 Steps for a Social audit
1). Setting up a Village Resource Group for social audit at to facilitate it -Village monitoring and vigilance committee(5 members may be selected) 2) Training the resource group: Initial training should be atleast a week: thorough understanding of -Act -Guidelines -Social Audit Hand book and how to use it for collecting, verifying and recording information 3). Plan for social audit: To be drawn up by DPC Conduct social audit twice a year: corresponding to working seasons

71 Steps for a Social audit
4) Prior Intimation: GPs to be informed three months in advance by PO 5) Records to be made available atleast one month before to the village social audit team 6) Scrutiny of records: internal cross checking & external verification with persons/works 7) Public Hearing and evidence Reading out the findings of social audit on a specified day in the social audit forum Concerned Officials to attend from district administration: engineers/accountants 8) Record of proceedings 9) Follow up by District administration. Action taken to be reported in the next social audit forum

72 Monitoring Output and Outcomes
Function Activity Output Outcome IEC Block Level Convention for sensitising Sarpanches Gram Sabha to acquaint local community with the Act No of conventions held No of Sarpanches oriented No of Gram Sabhas held Sarpanches well aware of the Act Implementation in Conformity to legal processes Wage seekers aware of their Rights and able to exercise them

73 Monitoring Mechanisms
Monitors for internal and external monitoring must be identified and trained at the State/ District and Block levels 100% verification of works at the Block level, 10 % at the District and 2% at the State level has to be ensured. Local vigilance and monitoring committees to be set up and trained Data Analysis and timely remedial measures Follow up on feed back

74 Grievance redressal system
Complaints book at GP level PO responsible for disposing complaints within 15 days DPC must review on Monthly basis Toll free Help Line

75 Fund Management

76 Fund Management Dedicated NREGA accounts in a PSU Bank at district/Block/GP levels DPC/PO and GP Secretary/Gram Rogar Sewak to be authorised to operate the account. Demand Based release of Funds. No fixed allocation and installments No allocations on a pattern to GP-IP-ZP as in SGRY Estimation of fund requirement by implementing agency based on demand for employment Cash Flow Management: to maintain 15 day payment cycle Funds released by Centre : -Initial installment on Labour Budget :Annual estimate of labour -Incremental installments on specific proposals of districts based on physical and financial progress - Financial claims to be moved when 60% of available funds used Proposal must be signed by District Programme Coordinator

77 Fund Management Documents needed for release of next installment:
Proposal on prescribed form UCs Audit report for the last year(due on 30th September), in the original form Bank reconciliation statement, in the original form. Requirement of funds to be indicated in the covering letter. Recommendations of State Government about specific amount required MPRs on prescribed proforma should have been sent for all months in the year. Non-diversion and non-embezzlement certificate. Compliance report of any condition imposed earlier Outcomes and output are mentioned in UC. Conformity to NREGA Processes

78


Download ppt "NATIONAL RURAL EMPLOYMENT GUARANTEE ACT 2005"