1 Facilities Update Site Improvements Encinitas Union School District September 5, 2006

2 Capri New HVAC system New campus entrance w/ student drop-off / pick-up Playground asphalt replacement and regrade. Moved in one relocatable to house Media Center during construction Next steps –Landscaping and irrigation at front of site –New marquee –Parking area –Media Center –Outdoor patio –Elevator –New stucco and painting

3 El Camino Creek Completed three cottage-style classrooms Next steps –Sandblast and repaint stairways –Replant slopes

4 Flora Vista Preschool addition –Added two offices and one classroom –Replaced carpet with VCT –Replaced existing toilets Remodeled main office Remodeled principal’s office Replaced school roof Replaced lunch shade shelter Sandblast and repaint windows Next steps –Remodel existing storage –Add tack board to interior hallways –Replace asphalt (06-07) –Paint exterior of school (06-07)

5 La Costa Heights Completing two new bathrooms Added relocatable classroom Next steps –Replace old playground equipment –Replace safety surfacing on playgrounds –Convert relocatables at back of site to cottage-style classrooms –Add modular cottage at front of site

6 Mission Estancia Remodeled new computer room Next steps –Replace tiles on outside walls –Move relocatables to south side of site and convert to cottage-style classrooms –Replace school roof (solar?) (06-07)

7 Ocean Knoll Remodel auditorium Remodel office entry Conversion of HVAC plant to storage room New ball wall Playground asphalt recycled and replaced Next steps –Add school sign –Asphalt striping

8 Ocean Knoll

9 Olivenhain Pioneer Added nine cottage-style classrooms on east side of site Added three bathrooms Replaced carpet, tile, and painted throughout site Next steps –Complete sink in existing art room –Replace school roof (solar?) (06-07) –Replace HVAC (07-08)

10 Olivenhain Pioneer

11 Park Dale Lane Office renovation Next steps –Add modular cottage at east side of site

12 Paul Ecke Central Renovate teacher’s lounge into kitchen and workroom New computer lab Replaced old portable classroom w/ cottage-style classroom Next steps –Remodel auditorium –Add three classrooms adjacent to auditorium –Improve perimeter along Vulcan –Add student drop-off/pick-up on Vulcan –Renovate parking on west side of site

13 Next Steps… Adoption of standardized classroom Renovate playgrounds at all sites Review facility priorities from 2004 Site visits to determine current and future facility needs and priorities