Presentation is loading. Please wait.

Presentation is loading. Please wait.

Retro-Commissioning June 21, 2010 Ed Tinsley, PE TME, Inc.

Similar presentations


Presentation on theme: "Retro-Commissioning June 21, 2010 Ed Tinsley, PE TME, Inc."— Presentation transcript:

1 Retro-Commissioning June 21, 2010 Ed Tinsley, PE TME, Inc

2 Agenda Today’s Problem Today’s Opportunity Retro-Commissioning Process Retro-Commissioning Case Studies Recommendations

3 Today’s Problem A Legislator’s Quandary LEED is not Enough Performance Contracting is not the Answer Act 1494 and Executive Order 09-07 are a Good Start

4 A Legislator’s Quandary Moral Obligation as a Human Being to Conserve Natural Resources Fiduciary Responsible as a Legislator to Conserve Taxpayer Funds Is there a Conflict?

5 25% of LEED Certified Buildings do not Achieve their Predicted Energy Savings In the Real World, LEED Certified Buildings are not more Energy Efficient than other Buildings 53% of LEED Certified Buildings do not Qualify for the Energy Star Label 15% of LEED Certified Buildings have Energy Star Ratings less than 30 “Some Buildings Not Living Up to Green Label” August 31, 2009 LEED is not Enough

6 Performance Contracting is not the Answer Complex Legal Issues 35 to 70% Cost Premium “Fuzzy” Guarantees –Weather –Rates –Utilization Not a Good Track Record May be Better than Doing Nothing At least this is better than my last job managing Performance Contracts

7 Act 1494 and Executive Order 09-07 are a Good Start Act 1494 –Mandates Energy Efficient Design, Energy Modeling, Commissioning, and M&V –20% Reduction by 2014 and 30% Reduction by 2017 Executive Order 09-07 –Strategic Energy Plans –Promotes Operational Changes to Reduce Environmental Impact

8 Today’s Opportunity Natural Gas Rates Electricity Rates Projected 2010/2011 Surplus Spending our Gift Wisely

9 Natural Gas Rates

10 Entergy Rate Increase (Docket 090-084-U) UA System Intervened Other Participants (AEEC, FEA, Kroger, Hino, Audubon, Attorney General and Staff) 12.86% Increase in Base Rates (Large Commercial Class) Loss of CA Rider Indemnification Language Issue Referred to ATU Complaint Pilot Real Time Pricing (“RTP”) Program Securitization of Storm Damage Costs Referred to Separate Docket Formula Rate Plan Referred to Separate Docket

11 Electricity Rates ItemChange (%) % of Total Cost Net Change (%) Base Rates12.8640.505.21 PCA Rider (System Agreement)(84.82)29.20(24.77) ECR Rider (Fuel and Purchased Power) (26.78)18.55(4.97) Capacity Acquisition Rider (Ouachita Plant) (100.00)1.09(1.09) Total Change(25.62)

12 Projected 2010/2011 Utility Budget Surplus Electricity - $9.75 Million Natural Gas - $4.50 Million Total - $14.25 Million

13 Spending the Gift Wisely Largely Due to Lower Natural Gas Costs The Surplus is Short Term Surplus can be Absorbed into General Funds or Surplus can be Converted to Recurring Savings by Investing in Energy Conservation

14 Retro-Commissioning Retro-commissioning (RCx) is a systematic, documented process that identifies and implements low-cost operational and maintenance improvements in existing buildings intended to improve energy efficiency, indoor air quality, and thermal comfort. RCx focuses on the major energy consuming systems (HVAC and lighting) and optimizes existing system performance, rather than relying on major equipment replacement or other items requiring large capital expenditures.

15 Retro-Commissioning Process Obtaining Data Benchmarking Supply-Side Audit Develop the Plan Execute the Plan Measure and Verify Results

16 Obtaining Data Utility Bills Record Drawings Site Inspections Equipment Testing Equipment Submittals Control Diagrams EMS Review TAB Report Maintenance Staff Data Harvesting Tool

17 Utility Bills Alternative Service Arrangements –Master Metering –Combined Billing Alternative Rates –Time of Use –Real Time Pricing (RTP) Rates –Interruptible Rates Alternative Riders –Transformation Credit Demand Side Management Programs –Grants –Rebates

18 Review Energy Management System Graphic Displays Trend Data Alarm Log Control Programs Setpoints Schedules

19 Maintenance Staff Chronic Operating and Maintenance Problems Actual Equipment Operation Actual Setpoints Desired Outcome/Goals Potential Energy Cost Reduction Measures The Maintenance Staff must be Stakeholders in the Process

20 Using a Commissioning Tool to Harvest Data and Find Opportunities Find all Air Terminals with Air Flow 90% −Air Terminals with Defective Air Flow Measurement Devices

21 Benchmarking Energy Consumption and Costs IFMA Handbooks ASHRAE Standard 90.1 Leadership in Energy and Environmental Design (LEED) Performance Metrics EPA Energy Star ASHE E 2 C ASHE Benchmarking Program

22 Supply-Side Utility Audit Locate all Utility Meters (electricity, gas, & water) on a Site Plan Identify the Buildings Served by each Meter Check for Billing Errors Identify and Evaluate all Potential Metering Arrangements, Utility Rates, and Riders Implement the Procurement Strategy (Metering Arrangements, Rates, and Riders) that Yields the Lowest Unit Cost Update the Supply-Side Audit on an Annual Basis

23 Electricity Rate Analysis Alternative Rates and Riders Ratchet Clauses Delivery Voltage Meter Location Power Factor Penalties Combined Billing Master Metering

24 Natural Gas Rate Analysis Unbundled or Transportation Service Purchasing Groups MDQ vs. Contract Demand Physical Hedging Strategy LDC, Pipeline, and Commodity Rate Structures Index plus Basis plus Margin Fuel and LUFG Cost Recovery Nominations, Imbalance Penalties, and Cash-In/Out Requirements

25 Developing the Retro-Cx Plan Set a Primary Objective Identifying Available Resources Identifying and Evaluating Potential Energy Cost Reduction Measures Prioritize and Select Potential Energy Cost Reduction Measures Obtain Capital Funding Set Intermediate Goals

26 Developing the Retro- Commissioning Plan (continued) Establish a Timetable Implement Energy Cost Reduction Measures Measure and Verify Progress Mid-Course Corrections Acknowledge and Celebrate Success Update and Extend the Plan

27

28 Identifying and Evaluating Potential Energy Cost Reduction Measures Comprehensive Review of Entire Facility Consider all Available Data Consider New and Proven Technology Computer Simulation Programs Conceptual Designs Conceptual Cost Estimates ECRM Interdependencies Simple Payback (cost to benefit ratio)

29 ECRM Summary ECRM Number ECRM Name ECRM Values Savings ($/year) Cost ($) Payback (years) 1Lighting Retrofit390,6631,537,8363.9 2SRC Boiler Replacement30,000277,0009.2 3Vacuum Pump Replacement14,00035,0002.5 4CVOR Chiller Bypass191,1141,000,0005.2 5NW AHU Modification122,810982,4838.0 6HVAC Modifications542,757225,0000.4 7Electricity Tiime Of Use Rate Change446,77900.0 8Power Factor Correction19,996118,7985.9 9 Natural Gas Negotiated Distribution Rate 425,00000.0 10 Eliminate Steam Take or Pay Contract Provision 350,00000.0 11SWT AHU-1 & 2 Modification46,732600,00012.8 12SWT VAV Retrofit182,969800,0004.4 13JT & SW VAV Retrofit44,733222,5935.0

30 Obtain Capital Funding Promote Energy Conservation within Department and Organization Capture Savings from Gas Hedging Activities and Electricity Rate Savings in Same Budget Year Participate in Utility Energy Efficiency Programs Participate in Revolving Loan Fund Capture Savings from Prior Energy Conservation Projects and Reinvest in new Projects

31 Set Intermediate Goals E2CE2C E2CE2C E2CE2C Baseline Current Energy Star

32 Reinvesting Energy Savings

33 Lighting Air Terminals Fan Coil Units Chilled Water System Heating Water System Steam System Operating Rooms Cath Labs AII Rooms Exhaust Fans Kitchen Hoods DHW System Air Handling Units Executing the Retro- Commissioning Plan

34 Air Terminals Occupied Air Flow Setpoints –Cooling Minimum and Maximum –Heating Minimum and Maximum Unoccupied Air Flow Setpoints –Cooling Minimum and Maximum –Heating Minimum and Maximum Temperature Setpoints –Occupied Minimum and Maximum (68 to 75 deg. F) –Unoccupied Cooling and Heating Setpoints Occupancy Sensors and/or Weekly Schedule Reheat Valve opens before Air Flow is Increased Most Significant Energy Conservation Opportunity in a Healthcare Facility!

35 VAV Air Terminal with Minimal Reheat Best Practice: Modulate HW Valve to a Discharge Setpoint and Reset the Setpoint from Minimum up to Maximum before Increasing Air Flow.

36 Measuring and Verifying Retro-Commissioning Results

37 Case Study Results ItemBeforeAfterSavings (%) Electricity Consumption (kWh)7,808,8005,249,80032.8 Average Peak Demand (kW)1,23092924.5 Electricity Consumption (kWh/SF/year)44.029.632.8 Average Peak Demand (watts/SF)6.935.2324.5 Natural Gas Consumption (MMBtu)43,11423,52345.4 Natural Gas Consumption (Therms/SF/year) 2.431.3345.4 Total Energy Consumption (MMBTU)70,13741,45740.9 Energy Utilization Index (kBTU per SF)39323340.6 Total Energy Cost ($/year)916,182540,05841.1 Energy Cost Index ($/SF/year)5.163.0441.1

38 Case Study Retro-Cx Costs Preliminary Energy Audit$8,350 Phase 1A and 1B$199,439 Total Cost ($)$207,789

39 Case Study Pump Balancing Triple Duty Valves at Pump Discharge Nearly Closed VFD’s Operating at Full Speed Bulk of Motor Energy Wasted at Balancing Valve Triple Duty Valve VFD 100 %

40 Recommendations Do not Stop with LEED Performance Contracting should be a Last Resort Develop an Act 1494 Compliance Handbook for State Agencies (stress LCC based decision making) Spend Your Gift Wisely Develop a State Facility Energy Consumption and Cost Reporting System Benchmark all State Facilities

41 Recommendations Open the Revolving Loan Fund to Higher Education Increase Participation in Utility Energy Efficiency Programs Implement Supply-Side Audits Increase Participation in Utility Purchasing Group Implement Lighting Audits and Lighting Retrofits Implement Retro-Commissioning

42 Recommendations Reinvest Energy Savings Increase State Facility Participation in the Utility Rate Making Process –Entergy System Agreement –Real Time Pricing Program –Indemnification Clauses –Combined Billing and Master Metering –Cost of Service Based Cost Allocation and Rate Designs


Download ppt "Retro-Commissioning June 21, 2010 Ed Tinsley, PE TME, Inc."

Similar presentations


Ads by Google