Presentation is loading. Please wait.

Presentation is loading. Please wait.

#1: Primary line deployment & placement “No other action taken on the fire ground saves more lives than the proper size attack line, stretched to the.

Similar presentations


Presentation on theme: "#1: Primary line deployment & placement “No other action taken on the fire ground saves more lives than the proper size attack line, stretched to the."— Presentation transcript:

1

2 #1: Primary line deployment & placement “No other action taken on the fire ground saves more lives than the proper size attack line, stretched to the correct location, and placed into service at the proper time.”

3 The 3 “R”s of line deployment  Right size (fire power)  Right location  Right time

4 Who is this guy and what is his function?

5 The Ideal Hoseline Nozzle Back up Officer Corner

6 Reality Nozzle Back up/Corners/Officer

7 “One + Plus + One” Rule of thumb example: Attack Line Engine Company Facilitating Company

8 “One + Plus + One” What is involved for this stretch ? 360 size up Line deployment Forcible entry Locating fire Forcible egress

9 Effective? 2 Wrongs don’t equal a right Nozzle Back up/Corners/Officer Nozzle Back up/Corners/Officer

10 “One + Plus + One” Nozzle Officer


Download ppt "#1: Primary line deployment & placement “No other action taken on the fire ground saves more lives than the proper size attack line, stretched to the."

Similar presentations


Ads by Google