1 Who We Are Where We Are Giandolfo Group Our Partners Installations & Stats Our Works Business Model Together… We design the future…

2 Who We Are GIANDOLFO GROUP Giandolfo Contracting S.p.A. manages all the group contracts, plans, works and designs projects on all the industrial field. M.I.B. Main Power S.r.l. realizes all the production in navy fiels, industrial field and alternative energy (root, fiels, architectonical buildings) Giandolfo O.& M. S.r.l. works to preserve the efficiency of the structures and left them “as new”. The experience built on the construction of MIB applied to the maintenance and operation.

3 Giandolfo Group GIANDOLFO GROUP Structure composition www.giandolfocontractingspa.com www.giandolfoem.com www.mibmainpower.com C.E.O.: GIANDOLFO Maria Administrative Quotes: -50% Giandolfo Maria -50% Giandolfo Giovanna C.E.O.: GIANDOLFO Giovanna Administrative Quotes: -50% MIB Main Power -50% Giandolfo Contracting C.E.O.: GIANDOLFO Domenico Administrative Quotes: -70% Giandolfo -30% Giandolfo Contracting “All in one and one for all” Your sodisfaction is our main work

4 Where We Are www.mibmainpower.com www.giandolfocontractingspa.com www.giandolfoem.com www.mibmainpower.com www.giandolfocontractingspa.com www.giandolfoem.com Tel. +39(0) 0994533688 Fax +39 (0) 0994533705 Tel. +39(0) 0994533688 Fax +39 (0) 0994533705 Taranto Messina In the beautiful city of Taranto, the city of the two seas, in the city center, laies the the technical and administrative offices of GIANDOLFO GROUP where it is developed all the projects and organizes all the technical and logistic activites. With the great experience of GIANDOLFO GROUP You will find the best solution to Your dreams. Via Cavour n° 24 - 74123 TARANTO Near the little and historical Messina, on the Sicily corner, nearest Italy peninsula, laies the legal office of GIANDOLFO CONTRACTING S.p.A. In the legal offices we follow all economical and finalcial issues, finding all the best legal and economical solutions for constumers and suppliers. Via Timpa n° 6 - 98040 Gualtieri Sicaminò (ME) Italia

5 Business Model Surface Rights Surface purchasing Green Energy suppliesGiandolfo Group Activities for Investors Asset Structuring Finance Construction Management Operations Management EPC Contracts O&M Contracts Senior Debt Project Financing Leasing

6 Our Partners The Natural Resources is Our Passion - Natuzzi Production Sites – 5 roufs total 6 MW - BA - Stornara 5,9MWp - TA - Palo del Colle 4 Sites 1MWp each - BA - Bologna 1 MWp - BO - Torricella Piacenza - PC - San Giorgio Pizzo Calabro 1,6MW - Enim 1 & 2 2MWp - Linda 1 & 2 1 MWp each – BP Solar Project - Crea 05 & 06 1 MWp each – BP Solar Project - Basciano 1 MWp – BP Solar Project - Cupello 1 MWp – BP Solar Project - Brindisi 4 MWp – BP Solar Project - Sciacca “Salinella” – AG – 2010 - Sciacca “Cozzo Pavone” – AG - 2010 - Scunchipani – AG - 2010 - Gamascia 4,9 MWp – BP Solar Project - Mesagne 5 fields 1 megawatt each – Bester Generacia Project

7 Installations & Stats

8 Our Works Site Name: STORNARA - TA Total kW: 5,9MWp Main Contractor: BP SOLAR Duration: 45 DAYS Structures Installation: PV Installation: Poles: 3624 Pannels n.: 25740 Inverters n.:1000 Type: ReneSola Type: 230kWp Year: 2010 TEAMS: Main contractor logo

9 Our Works Site Name: PALO DEL COLE Total kW: 4X1MWp Main Contractor: SCHEUTEN SOLAR Duration: 45 Structures Installation: PV Installation: Poles: 2688 Pannels n.: 18292 Inverters n.:708 Type: - - Year: 2010 TEAMS: Main contractor logo

10 Site Name: LINDA 1 & 2 - BR Total kW: 2x1MWp Main Contractor: Kuhling Duration: 40 Structures Installation: PV Installation: Poles: 614 Pannels n.: 4362 Inverters n.:169 Type: - - Year: 2010 TEAMS: Main contractor logo Our Works

11 Site Name: ENIM1 & 2 - BR Total kW: 2x1MWp Main Contractor: BP Solar Duration: 35 Structures Installation: PV Installation: Poles: 614 Pannels n.: 4362 Inverters n.:169 Type: - - Year: 2010 TEAMS: Main contractor logo Our Works

12 Site Name: GAMASCIA - LE Total kW: 4,9MWp Main Contractor: Kuhling Duration: 60 days Structures Installation: PV Installation: Poles: 3008 Pannels n.: 21373 Inverters n.:828 Type: - - Year: 2010 TEAMS: Main contractor logo Our Works

13 Site Name: NATUZZI SPA Total kW: 4X1MWp Main Contractor: SCHEUTEN SOLAR Duration: 60 DAYS Structures Installation: PV Installation: Poles: - Pannels n.: 4362 Inverters n.:169 Type: - - Year: 2010 TEAMS: Main contractor logo Our Works

14 Site Name: BOLOGNA Total kW: 0.980 MWp Main Contractor: SCHEUTEN SOLAR Duration: 20 DAYS Structures Installation: PV Installation: TEAMS: Poles: 602 Pannels n.: 4274 Inverters n.: 166 Type: - 220kWp Prod: 220kWp Year: 2010 Main contractor logo Our Works

15 Site Name: SCIACCA Total kW: 7,2 MW Main Contractor: IBERDROLA Duration: 93 DAYS Structures Installation: PV Installation: TEAMS: Poles: 4334 Pannels n.: 30772 Inverters n.: 1196 Type: - 220kWp Prod: 220kWp Year: 2010 Main contractor logo Our Works

16 Site Name: MESAGNE - BR Total kW: 5X1MWp Main Contractor: SAMSUNG – BESTER GENERACION Duration: 45 DAYS Structures Installation: PV Installation: Poles: 3600 Pannels n.: 10560Inverters n.:10 Type: - SOLON Year: 2010-11 Electrical Part: Main contractor logo Our Works 240 BLACK – 240 BLUE – 210 BLU – 235 BLACK – 213 BLUE


Download ppt "Who We Are Where We Are Giandolfo Group Our Partners Installations & Stats Our Works Business Model Together… We design the future…"