 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.

Similar presentations


Presentation on theme: " Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting."— Presentation transcript:

1  Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting

2 Lots done since March meeting Fiber splitting is working for all paths  still need active splitter for RECES (see Chris’talk) RECES/Cluster inputs working with beam, PulsarMon design in place (see Vadim’s talk) LVDS splitting is working for all paths  no blue wire on Fanout boards! Most firmware in places for all paths (Tx & Rx)  fine tuning starts (see Sakari’s talk) Pulsar production/testing success !  all hardware in place (see Burkard’s talk) TS  L1A  Pulsar Merger Tx  CPU  L2TS Pulsar  TS  L2R/A loop closed! (see Cheng-Ju and Kristian’s talk) Control CPU and Algorithm CPU communication software in place (see Daniel and Kristian’s talk) New VME DAQ readout code in place (see Jane and Burkard’s talk) Pulsar crate almost FULL  platform for integration in place (see Burkard’s talk) …

3 Pulsar Crate in Trigger Room B0L2PU00 Muon XTRP L2 Muons Run IIa Level 2 Decision Crate  - Processor 1/3 RECES Reces Cluster SVT Connections: Fibers LVDS Slink Pulsar Test pattern CList Master CList ISOList Merger Slink Rx Pulsar Tx B0L2PU00 Level2_Pulsar_00

4 081 L2 Pulsar Muon/XTRP Rx IIa 083 L2 Pulsar SVT Road Warrior 085 L2 Pulsar Muon/XTRP/L1 Tx or SVT XTRP-emu 086 L2 Pulsar Muon/XTRP/L1 Rx IIb 087 L2 Pulsar RECES Tx 088 L2 Pulsar RECES Rx 089 L2 Pulsar Cluster/PreFred Tx 090 L2 Pulsar Cluster/PreFred Rx 091 L2 Pulsar SVT Tx 092 L2 Pulsar SVT Rx 093 L2 Pulsar Merger Tx 094 L2 Pulsar Merger Rx 095 L2 Pulsar L2TS “Tx” 096 L2 Pulsar L2TS 097 L2 Pulsar L1 Scaler 098 L2 Pulsar SVT TF 099 L2 Pulsar test Tx 100 L2 Pulsar test Rx 101 L2 Pulsar Stereo Tx 102 L2 Pulsar Stereo Rx One Hardware -- many Firmwares Board type Description Firmware Sakari Franco Tomi Sakari Tomi Sakari Tomi Vadim + Sakari Tomi Sakari Tomi Sakari What’s needed for phase I

5 Using Pulsar SVT Rx to measure SVT/SVX timing (lemo inputs: flexibility of Pulsar AUX card) SVT in From modified VTM: signal to indicate SVX data activity Lemo cable New Pulsar SVT Rx firmware/AUX card can measure the leading and trailing edge times for both SVT input (SVX data) and SVT output… Beam tests on going….. Important for SVT upgrade and overall L2 performance SVT pipelineSVX/SRC Can also measure timing @ intermediate stages

6 Are you ready for the summer integration? These two are ! head shaved & cabled up

7 PC SLINK Pulsar pre-processors L1 muon L1 XTRP L1 trigger TS ShowMax (RECES) SVT Muon Cluster Electron Merger SVT L2toTS System Integration: two main efforts  one between the two: SLINK fibers L2 CAL (CLIST/Iso) PreFred Trigger Room with beam Teststand Room Standalone

8 SLINK Pulsar pre-processors L1 muon L1 XTRP L1 trigger ShowMax (RECES) SVT Muon Cluster Electron Merger SVT L2toTS System Integration: Part I in trigger room L2 CAL (CLIST/Iso) PreFred Trigger Room with beam Room Standalone Pulsar Rx Beam Tests Pulsar Monitoring Firmware Fine tune

9 Key to success: coherent team effort ! Beam Tests MonitoringFirmware Coordinator: Burkard “In God we trust, everything else we test with beam” Coordinator: Vadim “In God we trust, everything else we monitor” -- FBI Coordinator: Ted “In God we trust, everything else we simulate” Weekly plan will be made at Tuesday weekly meetings (Trailer 171 E, 3-4:30pm) Progress reports at Friday bi-weekly trigger hardware meetings

10 Key to success: coherent team effort ! Beam Tests MonitoringFirmware all beam test requests coordinated with trigger SPLs Train system experts now pager carrier, rotate weekly setup web page with instructions … see Burkard’s talk Have all monitoring code ready for all subsystems next month setup web page with details filled by experts set goals for the coming months … see Vadim’s talk We are moving from the age of firmware into the age of monitoring software … firmware is not a place to show how smart one is, rather how many mistakes one can make and how fast one can fix them !

11 PC SLINK Pulsar pre-processors L1 muon L1 XTRP L1 trigger TS L2 CAL (CLIST/Iso) PreFred ShowMax (RECES) SVT Muon Cluster Electron Merger SVT L2toTS System Integration this summer To make the commissioning and long term maintenance MUCH easier, we need to split all fibers for RECES  active splitters Design and production: Chris Started one month ago Engineer support from Upenn

12 PC TS SVT Cluster Electron Merger Tx SVT L2toTS System Integration: Part II Trigger Room with beam Teststand Room Standalone SVT Tx Adjust SVT latency and data size Standalone first before move to trigger room develop&test all software here study initial performance with sparky triggers Hardware coordinator: Cheng-Ju PC/Software coordinator: Daniel Algorithm/PCI expert: Kristian

13 Mini-DAQ with L2 trigger in test stand room RXPT TXPTTS Pulsar (L2TS) FRED (GL1) preFRED L2 Trigger Decision + TL2D Bank (Phase I) L2 Trigger Data TS L1A L2TS Pulsar Pulsar Merger Tx (SLINK fiber) PCPC TS handshaking (sending L2A/R, ROL, Buffer #) Can also use L2TS Pulsar +TS to deliver Sparky trigger to 8 teststand crates Details see Kristian/Daniel/Cheng-Ju’s talk

14 PC SLINK Pulsar pre-processors L1 muon L1 XTRP L1 trigger TS ShowMax (RECES) SVT Muon Cluster Electron Merger SVT L2toTS System Integration: 2  1 aim at late July 04 L2 CAL (CLIST/Iso) PreFred Trigger Room with beam

15 Goals before Aug. shutdown put system together take enough beam data in parasitic mode a few runs in decision making mode have enough system data to chew on during the shutdown (or long beam abort gap)

16 Challenges in system integration So far we have done the simple part, the part we know for sure that needs to be done and how to get it done we may encounter some unknowns during commissioning: either we don’t know about them yet but they are out there waiting for us (like fiber splitting problems back in March), or problems created by us along the way… More often than not, those are the toughest ones and you will have most of the fun solving them… Be prepared !

17 A few comments Everyone in the group is proud of the Pulsar board … What I am really proud of are the young people on this project … We have the best young people I have seen, EVERYONE of them Even though some could only work on Pulsar part time so far, Productivity / hour spent : VERY high for everyone Talent  Great performance Can we have a working system running in parasitic mode before shutdown in Fall 2004 ? Our young people have the answer ! Note that the youngest Pulsar soldier will arrive next Monday ! Her name is Angie Little, our summer student

18 2003 PCB Technology Leadership Award I have saved this bottle for all of you, for a party later this year …

19 Pulsar Party tonight @ my house 30 -- 40 KHz? Tonight we will open this bottle instead… Chinese “Vodka” Happy B-day, Burkard! Daniel has designed Pulsar L2 to only have 2 states: Thirsty or Drunk

20 SLINK Pulsar pre-processors L1 muon L1 XTRP L1 trigger TS L2 CAL (CLIST/Iso) PreFred ShowMax (RECES) Muon Cluster Electron Merger L2toTS Phase II: Four CPU System configuration PC 0 PC 3 PC 1 PC 2 PCI  SLINK SLINK  PCI 01230123 01230123 To CPU 0/3 1/2 0/3 1/2 0/3 1/2 Merger SVT


Download ppt " Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting."