1 The Overall Classification of this Briefing is:
UNCLASSIFIED Global Theater Security Cooperation Management Information System (G-TSCMIS) COI WG / RMIPT / TWG 11 July 2013 The Overall Classification of this Briefing is: UNCLASSIFIED

2 Agenda Roll Call DSCA COI WG RMIPT TWG Welcome & DSCA Update DSCA
Program Office Update PMW 150 J5 Update Joint Staff J5 OSD (Policy) Update OSD (PSO) Master Schedule DSCA Open Forum All RMIPT Requirements Update Joint Staff J6 TWG Training Working Group PMW 150 UNCLASSIFIED 2

3 DSCA UNCLASSIFIED 3

4 Welcome & DSCA Update C/S/A Reach back COI Collaboration Site
Event Planning Process Meeting UNCLASSIFIED

5 C/S/A Reach Back C/S/A G-TSCMIS POCs must be speak on behalf
of all G-TSCMIS-related issues for the C/S/A Current and upcoming discussions require a comprehensive understanding of how different aspects of G-TSCMIS will be used/needed by different communities at C/S/As It’s the responsibility of the C/S/A G-TSCMIS POCs to reach back to those different communities with the C/S/A UNCLASSIFIED

6 C/S/A Reach Back Example 1
Information needs – what do C/S/As need from DSAMS/SAN or OHASIS? C/S/A G-TSCMIS POC C/S/A FMS POC(s) The G-TSCMIS POC must reach back within his/her organization to the FMS and HA POC(s) to understand the information needed. Reach Back This requirement needs to be articulated to J6 NLT July 30. UNCLASSIFIED

7 C/S/A Reach Back Example 2
Event Planning Process Discussion C/S/A G-TSCMIS POC C/S/A Planning POC(s) The G-TSCMIS POC must reach back within his/her organization to the Planning POC(s) to understand the need. Then they need to articulate that need to J6. The planning discussion will take place August 1. Reach Back UNCLASSIFIED

8 COI Collaboration Site
The COI collaboration site will be a one-stop-shop for the G-TSCMIS COI. Provides a secure location to store, manage and collaborate internal working material (meeting slides, minutes) Master calendar with notification capabilities News/updates section with notifications Collaboration site selection in work Target date for usage – September 2013 UNCLASSIFIED

9 Event Planning Process Meeting
Objective: Develop a common event planning process for G-TSCMIS Implemented as a business process Automated by Release 2 Request for input regarding each C/S/A’s process milestones NLT July 19. Using the input submitted, we will compile and present at the meeting. Will discuss the commonalities and differences in processes and determine the best common process for the system. Meeting details: August 1st from at DSCA (VTC will be available for non-NCR organizations) Two representatives per C/S/A. It is imperative that whomever represents your C/S/A be able to fully represent your C/S/A’s planning processes. UNCLASSIFIED

10 PMW 150 UNCLASSIFIED 10

11 Program Office Update TEM Update: XWG Update:
Last meeting held 18 June Need to develop way to showcase how community feedback is incorporated Next Meeting: 15 October XWG Update: Last meeting held 26 June Transition procedure validation, with C/S/A testing, will occur with subset of operational data from each C/S/A after OT Next Meeting: 10 July UNCLASSIFIED

12 Joint Staff (J5) UNCLASSIFIED 12

13 G-TSCMIS Business Rules
Request C/S/As begin thinking about next version of Business Rules (i.e. v1.1) Issues identified during the G-TSCMIS transition (January 2014) may add to, or modify, Release 1 Business Rules Please forward change recommendations for existing Business Rules, or addition of new Business Rules to Col Bill Whittenberger Change recommendations per Release 1 Business Rules (Section 2) processes UNCLASSIFIED 13

14 OSD (PSO) UNCLASSIFIED 12

15 G-TSCMIS Policy Drafting USD (P) G-TSCMIS implementation directive
Engaging with OSD (Strategy) Office on Security Cooperation taxonomy UNCLASSIFIED 13

16 COI Events/Activities
Master Schedule WG Meetings DATE DESCRIPTION Lead Notes July 10 Transition WG (XWG) PMW 150 July 11 COI/RIPT/TWG DSCA/J6/PMW 150 July 24 October 15 Technical Exchange Meeting (TEM) COI Events/Activities DATE DESCRIPTION Lead Notes July 8-22 Integration Testing (IT) PMW 150 - Extended from 19 to 22 July due to Furlough COTF ing RE: COI Testing July 31 XWG Concurrence on Transition Schedule goal date in order to have schedule ready for prebriefs August 1 Face-to-Face Mtg (Event Planning) DSCA - Replaces Aug 1 COI/RIPT/TWG September TBD Governance Council Meeting - GO/FO representation November Operational Testing (OT) - COTF ing RE: COI Testing January 15 G-TSCMIS R1 Field Decision Review UNCLASSIFIED 14

17 Requirements Management IPT (RMIPT)
Joint Staff J6 UNCLASSIFIED 15

18 JS J6 Admin Note: For planning purposes – the furlough day for JS J6 CCD is Fridays UNCLASSIFIED 16

19 NRID Item 1072 NGB requested their own instance of I-TSCMIS so they can move NG SPP records out of ARGOS and into their own instance of I-TSCMIS. No non-concurs received Next Step: HPT discussion/decision UNCLASSIFIED 17

20 R2 Requirements Assistance
On 5 June, we requested your input on three requirements (71, 72, 49) Format for a “Fact Sheet” Reports that have required formatting format for standard visual presentation documents (e.g., Power Point) On 27 June we requested a final review of example formats received and submitted to PMO. Also, requested additional input on ADS data requirements for R2 (OHASIS, DSAMS, JCRM, GFM-DI, JTIMS). Next step: Working with PMO/DSCA/SE Team to work through the details and provide updated OV-7 and additional sample reports per recommendations received beyond requirements 71, 72, 49. UNCLASSIFIED 18

21 G-TSCMIS Release 3 CP Projected start date: September 2013
1st Draft: November 2013 Staffing: January 2014 Release 4-5 CP Development Projected start: April 2014 UNCLASSIFIED 19

22 Training Working Group (TWG)
PMW 150 UNCLASSIFIED 20

23 Agenda R1 Interactive Courseware (ICW) Prototype
R1 Integrated Test (IT) Training Events R1 IT Participant List UNCLASSIFIED 21

24 R1 ICW Prototype Purpose Review was conducted 14 – 28 June 2013
To achieve TWG “buy-in” for the proposed conceptual design; If the TWG disagrees with the proposed conceptual design, it is better to find out and make adjustments early in the process Review was conducted 14 – 28 June 2013 Responses received from: USMC NORTHCOM CENTCOM Joint Staff Army UNCLASSIFIED 22

25 R1 IT Training Events Training events scheduled IT Participants
8 Jul: View Only and Event Owner EDT 9 Jul: View Only and Event Owner EDT 10 Jul: Org Data Manager EDT 11 Jul: Org Data Manager EDT IT Participants IT participants have been identified by the C/S/As and roles have been assigned by the PMO UNCLASSIFIED 23

26 R1 IT Participant List UNCLASSIFIED 24

27 R1 IT Participant List UNCLASSIFIED 25