Presentation is loading. Please wait.

Presentation is loading. Please wait.

IBM HARDWARE AND VMWARE

Similar presentations


Presentation on theme: "IBM HARDWARE AND VMWARE"— Presentation transcript:

1 IBM HARDWARE AND VMWARE
SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE Tony Kenny, IT Manager, Beaumont Hospital

2 RED HAT ADVANCED SERVER 45
HISTORICAL BACKGROUND LIST OF SERVERS RED HAT ADVANCED SERVER 45 WINDOWS SERVERS (NT/2000) 20 NOVELLE SOLARIS HP-UX HP

3 S E R V

4 HISTORICAL BACKGROUND
GROWING DEMANDS LEGACY INHERITANCE ONE BOX / ONE APPLICATION MAZE OF BOXES DIFFERENT O/S VERSIONS WINDOWS NT 2000 2003 LINUX REDHAT 8 REDHAT 9 REDHAT A/S RED HAT E/S

5 HISTORICAL BACKGROUND
AGE PROFILE OF SERVERS < 7 yrs 8 5 - 7 yrs 10 3 - 5 yrs 37 1 - 2 yrs 11 0 - 1 yr 4 70 RELIABILITY SUPPORT CONTRACTS MANAGABILITY DIY ENGINEERING CULTURE

6 AND NO DISASTER RECOVERY
HISTORICAL BACKGROUND MANAGEMENT HIGHLY COMPLEX ENVIRONMENT HIGHLY VOLATILE HIGHLY CONFUSING GENIUS SYNDROME DYNAMIC SOFTWARE ENVIRONMENT WINDOWS LINUX MANY NEW PRODUCTS AND NO DISASTER RECOVERY

7 SO WHAT DID WE DO THEN X445 ESS PRODUCTION (6TB) DISASTER RECOVERY
Applications Oracle Database X445 ESS (6TB) PRODUCTION DS 4100 (9 TB) DISASTER RECOVERY Applications Test Environment

8 IT ALIGNMENT Clinical Notes PIPE NDS Epilepsy LAB RAD Theatre Billing
BHIS Billing HR Finance

9 LITTLE ENOUGH APPARENT DIFFERENCE
CONSOLIDATION OPTIONS NEW X86 SERVERS BLADES MULTI-CPU NUMA SERVERS SOPHISTICATED MEMORY SHARING REDUNDANCY LITTLE ENOUGH APPARENT DIFFERENCE …. BUT…. MAINFRAME FOCUS RELIABILITY DISCIPLINE MANAGEMENT

10 DISASTER RECOVERY ESS 1 ESS 2 STORAGE BASED PPRC COMPLEX SET UP
INVISIBLE TO OPS TEAM STILL IN SETUP/TEST MODE

11 DISASTER RECOVERY Redundancy in network CICSO Infrastructure
Network Star Topology CISCO 2900 Redundancy in network CICSO Infrastructure edge core DVE - June 2006

12 POSSIBILITIES DISASTER RECOVERY BH MATER AMNCH SJH SVH
FAILOVER SCRIPTING STRESS TESTING IP ADDRESS SWITCHOVER STILL IN DEVELOPMENT TARGET Q3 2006 POSSIBILITIES BH MATER AMNCH SJH SVH

13 VM WARE CONFIGURATION SET UP 3 X445 / 8 CPU / 50GB RAM
30 VIRTUAL SERVERS DYNAMIC RESOURCE ALLOCATION MIXED O/S ENVIRONMENT BALANCED NETWORK CONNECTIONS DUAL HBA SAN LINKS

14 VM WARE SET UP NEW CONCEPT FOR US EAGER TO GET TO GRIPS SELF TEACHING
FORMAL TRAINING SOME REWORK REQUIRED RELATIVELY STRAIGHT FORWARD TO SET UP

15 VM WARE SET UP GOOD SUPPORT CENTRE (24X7)
VERSION UPGRADES DONE (2.1 -> 2.5) LITTLE USE MADE OF ADVANCED FEATURES VMOTION ? VSAN ?

16 VM WARE ISSUES SOME APPLICATION VENDOR PUSH BACK
DIFFICULT TO DIRECTLY MEASURE PERFORMANCE/ RESOURCE LODING NEED FOR ADDITIONAL SKILLS TO IMPROVE SYSTEM MANAGEMENT RESOURCE POOLING OVER DIFFERENT MACHINES

17 SO DR PLANNING IS CRUCIAL
VM WARE ISSUES DISASTER RECOVERY ONE BIG DRAWBACK - MACHINE FAILURE (31/12) NO SHARED CONFIGURATION 12 HOURS DOWNTIME CAUGHT NAPPING SO DR PLANNING IS CRUCIAL

18 VM WARE ISSUES SYSTEM MANAGEMENT - BIG CHANGE CONFIGURATION CONTROL
CHANGE CONTROL PROCESS DYNAMIC RESOURCE ALLOCATION DISTINCT TEST ENVIRONMENT

19 VM WARE ISSUES DR NOW IN PLACE MULTI BOX MANAGEMENT
ADDITIONAL TUNING / PERFORMANCE TRAINING INTEGRATE WITH VSAN MANAGEMENT

20 VM WARE ISSUES SERVER ROOM SPACE SERVER ARCHEOLOGY
CONVOLUTED PATCH UP PATHS DISPARATE O/S RELEASES LACK OF SOP REBOOT “CURE ALL”

21 WHAT WE GOT UPGRADED HOSPITAL NETWORK FAST …. SEGMENTED …. SECURE ….

22 STRATEGIC INTENT Need for reliability Response time HP 3000 CURRENT
LIFE SUPPORT CARE DELIVERY CLINICAL ADMINISTRATIVE Need for reliability Response time CURRENT STATUS HP 3000

23 SERVER INFRASTRUCTURE
STRATEGIC INTENT SERVER INFRASTRUCTURE VIRTUALISE  MODULARISE  POWER MANAGE x SYSTEMATISE 

24 WHAT I WANT DATA CENTRE MANAGEMENT RESOURCE BALANCING
SKILL SET TRANSFER CREDIBLE ROLL OUT SCHEDULE RELIABILITY - SERVICE DELIVERY - SUPPORT - COMMNICATION LITE PROJECT MANAGEMENT

25 PAYBACK BUT ROI of Infrastructure SLA (?) Uptime (?)
Once Off Recurring PA Investment Premium 50,000 Training Cost 39,000 Server Maintenance (48,000) Saving Staff Redeployment (1) (39,000) Additional Storage 50,000 _______ 139, ,000 Payback 19 months BUT ROI of Infrastructure SLA (?) Uptime (?) Load balancing (?) Future Expansion (?)


Download ppt "IBM HARDWARE AND VMWARE"