Presentation is loading. Please wait.

Presentation is loading. Please wait.

Horticulture Maths Resource Mathematical resource for Horticulture

Similar presentations


Presentation on theme: "Horticulture Maths Resource Mathematical resource for Horticulture"— Presentation transcript:

1 Horticulture Maths Resource Mathematical resource for Horticulture
Kevin Albert Land Built Environment & Sustainability (02) © Wodonga TAFE 2012

2 Horticulture Maths Resource
Table of Contents Plan interpretation and Setting out Calculation basics Landscaping Turf and Parks & Gardens Water Harvesting and Irrigation Business

3 Plan interpretation & Setting out
Index Select from following links: Setting out 900 angles using 3:4:5 triangles Scale Using Scale Rulers

4 Setting out a 900 angle using “3:4:5” triangle
Task - We are going to set out an area for landscaping where we need a square corner. On small jobs we might be able to use a builders square to start us off but there are many situations where the old ‘3: 4: 5 triangle’ comes in handy Considerations So what is a 3:4:5 triangle? You may have heard of “Pythagoras theory” where the square root of the diagonal of a triangle equals the sum of the squares of the other two sides Eg a2 + b2 = c2 = 52 or =25 The 3: 4: 5 is a ratio between the sides of the triangle It can be multiplied out by 2, 10 or 100 or any number so long as all sides are multiplied the same i.e. 300mm: 400mm: 500mm. So if you refer to 300mm as 3 units in this case or in other situations you may use 3m: 4m : 5m (a)= 3 (c) = 5 (b) = 4

5 Setting out a 900 angle using “3:4:5” triangle
Guidelines 1. Determine your starting point 2. From the starting point peg out a line in the most critical direction. This will be your base line and shouldn’t change (this may be parallel to a building, path or fence line) 3. Measure 3 units along this line (a unit can be 300mm or 3m depending on the length required)and mark each end i.e. with pegs 4. Set out an approximate right angle to the base line (a right angle is 90 degrees from the base line) 5. Measure along the 2nd line a distance of 4 units from the zero end of your first line and scribe a small arc at the required distance 6. Now measure 5m across the diagonal from the 3m end and scribe another arc. Where the arcs cross should be the final corner and you can set out the right angle

6 Setting out a 900 angle using “3:4:5” triangle
Sample Step 1. Determine your starting point , i.e. the back corner of the house. Place a peg (note: if using timber pegs you will need to place a nail in the centre of the top once hammered in) Step 2. From the starting point peg out a line in the most critical direction this will be your base line and shouldn’t change  In this case use the back of the house as the base line Step3. Measure 3 units along this line in this case use 3 metres and install a peg with the nail at exactly 3m from the first peg house Start point (a)= 3 units 3

7 Setting out a 900 angle using “3:4:5” triangle
Sample Step 4. Set out an approximate right angle to the base line (a right angle is 90 degrees from the base line) Step 5. Measure along the 2nd line 4 units In this case use 4 metres and install a peg with the nail at exactly 4m from the first peg house (a)= 3 units 3 (b) = 4 units 4

8 Setting out a 900 angle using “3:4:5” triangle
Sample Step 6. Now check across the diagonal from the peg at the end of the 3m line to the peg at the end of the 4m line. This should measure 5 units – if not, adjust the 2nd line until the 4 units out is 5 units exactly on the diagonal In this case the measurement should be exactly 5 metres from the nail in each peg house (a)= 3 units (b) = 4 units (c) = 5 units

9 Scale Task - You have been asked to set out some landscape works and need to use a scaled plan Considerations Scale means to reduce or increase something in its size in equal proportions. eg 1 a matchbox cars are often models of real cars but 33 x smaller i.e. made to a scale of 1 : 33 eg 2 House plans are usually drawn 100 times smaller than the real size i.e the plan is drawn at 1:100 scales The bigger the number, the smaller the scale and the more surface area of the ground can be shown, i.e. A large scale covers a small area or close up item i.e. A detail drawing of a planter box may have a scale of 1:10 A plan of an oval may be at 1:500 or 1:1000 scale A small scale covers a large area of land i.e The topographic map of a district may have a scale of 1:55 000 A map of a town may be a scale of 1: A scale of 1:1 means that the item is in real size To read scale you can use a scale ruler. To draw to scale you can also use graph paper where each square represents a given measurement i.e. 1 m

10 A small scale covers a large area of land i.e 1:55000
Sample A small scale covers a large area of land i.e 1:55000

11 A large scale covers a small area or close up item i.e. 1: 10
Sample Source: A large scale covers a small area or close up item i.e. 1: 10

12 Using a Scale ruler Task - You have been asked to set out an area of a landscape plan and need to use a scale rule Considerations To read scale you can use a scale rule. A scale rule has a range of different scales that you can select from to suit the plan you are working with. i.e. If you were trying to find the length of say a wall of a house, select the appropriate scale (look in the title block of the plan or under the particular drawing) 1:100 or 1:200 are common 1:100 means 1 cm on the plan is 100cm or 1 m on the ground. place the 0 end of the scale on one end of the wall on the plan and then read off the number that is lining up with the other end of the wall. You should notice that the numbers will be in metres not millimeters

13 Using a Scale ruler Sample Here is an example using a house plan
The bottom scale Is 1:100, numbers read as 1m, 2m etc Length of the wall is 5.2m

14 Using a Scale ruler Sample 1. Select the appropriate scale
2. Place the 0 end of the scale on one end 3. Read off the number that is lining up with the other end

15 Calculation Basics Index Select from following links: Surface area
Surface area – squares & rectangles Surface area – triangles Surface area – circles Circumference of a circle Volume of materials Linear Measurements Gradients Terminology and Conversions © Wodonga TAFE 2012 15

16 Surface area Considerations
Task - You are to work out the amount of materials such as pavers asphalt or turf for the area you are working in which needs to be covered. Considerations There are four things which you will need to find out The length of the area to be covered (which is written as L). The width of the area to be covered (which is written as W) You will need to multiply the length x the width to get the total area to be covered i.e. by calculating the length (L) x width (W) of a square or rectangle or for more involved shapes, refer to the following formulas The total area to be covered is written as square metres or (m2) this tells you that it is has 2 dimensions.

17 Surface area Formulas Finding the area
Area of a rectangle = length  width Area of a triangle = ½ base  perpendicular height Area of a trapezium = ½ (a + b)  perpendicular height Area of a circle = 3.14  r2 (or   r2)

18 Surface area – square / rectangle
Sample How do you work out the area to be covered in your work area? You need to carry out a number of steps Find out the width of your area by measuring from A- B This will give you 1 metre Find out the length by measuring from B-C You then use the formula of Length Lx Width W = Area m2 Which will be 1mx1m= 1 m2 This means the material to be ordered must cover 1 m2 1.000 1.000

19 Surface area – square / rectangle
Task - You are about work out the amount of materials such as pavers asphalt or turf for a triangular area you are working in which needs to be covered. Finding the area Area of a triangle = ½ base  perpendicular height Area triangle = B X H ÷ 2 There are three (3) things which you will need to find out The length of the base of the triangular area to be covered (which is written as B). The perpendicular height of the triangular area to be covered (which is written as H) You will need to (multiply the base x the height) and then divide the answer by 2 to get the total area to be covered Note: The total area to be covered is written as square metres or (m2) this tells you that it has 2 dimensions to the calculation. H (the height is the distance from tip to base ) B(base)

20 Surface area – Circle Finding the area Formulae
Task - You are about work out the amount of materials such as pavers asphalt or turf for a circular area you are working in which needs to be covered. Finding the area Formulae Area of a circle =3.14  r2 (or   r2) There are three (3) things which you will need to find out 1. The radius of the circular area to be covered (which is written as r). The radius is the measurement from the center of the circle to the outside edge 2. The “square” of the radius. (to find the square you multiply the radius by itself : r x r = r2) i.e. if the radius was 2, multiply 2 x 2 = 4 r = centre to outer edge

21 Guidelines Surface area – Circle
3. You will need to multiply the answer to r2 x “Pi” () to get the total area to be covered (Pi or  is a give figure which is a relationship between the circumference of a circle and its diameter – it is expressed as 22 divided by 7 or in decimal as 3.14) Area of a circle = 3.14 x r2 = m2 using above example Area = 3.14 x 22 = m2 = 3.14 x 2 x 2 = 12.56m2 Note: The total area to be covered is written as square metres or (m2) this tells you that it has 2 dimensions.

22 Surface area – Circle Sample
How do you work out the area to be covered in your work area? You are going to pave a circular area with a diameter of 8 metres. How many pavers would you need to order Step 1 Radius is radius is the length from the center out. Diameter is the total length from one side of the circle to the other. Radius is half the diameter Half of 8 = 4m Step 2 The square of the radius is the radius multiplied by itself i.e. 42 = 16 or 4m x 4m = 16m2 8m

23 Sample Surface area – Circle Step 3 Using r2 , where  = 3.14, r = 4
therefore and r2 is 4 x 4 = 16 3.14 x 16 = m2 Note: Normally we would allow 5 to 10 percent for wastage and broken pavers- We will allow 10 % for easier calculation in this exercise 10% of = m2 = We will round this off and order 55m2 of pavers

24 Circumference of a circle
Task - You need to find out how many pavers will be needed to go as a border around a circular paving area Consideration The circumference is the distance around the outside of a circle The formula for the circumference is d x π where: π = 22 divided by 7 (or in decimal, 3.14) d = the diameter of the circle Once you have the circumference of the circle, divide it by the width of the pavers you will be using

25 Circumference of a circle
Sample If the circle of paving was to be 4m diameter Using the formulae dπ (diameter x pi ) [or you may also have learnt it as 2 x pi x radius (2πr] = 4m x 3.14 = 12.56m In other words, it is 12.56metres around the outside of the circle How many pavers are required? The paver is 110mm or 0.11m and the gap is 5mm or 0.05 Circumference ÷ width of the paver + gap = ÷ ( ) =12.56 ÷ 0.115 =109.2 pavers Round up to the number of whole pavers = 110 pavers Add 10% for wastage = % = =121 pavers

26 Volume of material Considerations The quantities are worked out by
Task - The quantities of many landscape materials such as soil, roadbase, sand, concrete and mulch are worked out by calculating the volume of space that the material takes up. Considerations The quantities are worked out by calculating the surface area of where the material is to cover (m2) Then multiplying by the required depth (D) or thickness Some of the simple shapes that we normally have to deal with in landscape construction are The answer will be expressed in m3. The 3 represents the 3 dimensions that have been used in the calculation Area Area Area Depth Depth

27 Volume of material – rectangle / square
Sample Example 1 Problem: To find the volume of concrete in the simple rectangular driveway 100 mm thick. Figure 1: Volume of a slab Volume = length x width x thickness = 7.850m x 2.500m x 0.100m Convert all dimensions to metres. 7850 mm length = 7.85 m 2500 mm width = 2.5 100 mm depth = m = 1.96 m3 2500 7850 100

28 Volume of material Sample Example 1 continued
Next we should add an allowance of say 10% to make sure that we have enough concrete for the job. 10% of 1.96 (0.10  1.96 m3) = m3 Round to 0.2m3 Now add 1.96 m m3 = 2.16 m3 You could round this off to 2.2 m3. If you are ordering ready-mix concrete you will need to round it off to 0.2 of a cubic metre as ready-mix concrete suppliers will not accept orders in smaller fractions of a cubic metre.

29 Volume of material – trapezium
Sample Example 2 Problem: To calculate the volume of concrete required for the pedestrian pavement 75 mm thick shown below. There are two different ways you could do this one. (a)    Treat it as a trapezium: Volume = Area x thickness = ½ (a + b) x perpendicular height x thickness = ½ ( ) x x 0.075 = ½ x x 2.1x 0.075 =1.06 m3 6750 3340 75 2100 3340

30 Volume of material – triangle / square
Sample Example 2 cont…. (b) Alternatively you could break the area up into a triangle and a rectangle as shaded: Volume = ( Area of triangle + area of rectangle ) x thickness = [ (½ base x height) + (length x breadth) ] x thickness = [ (½ x x 2.100) + (3.340 x 2.100) ] x 0.075 = [ ] x 0.075 = 1.06 m3 6750 3340 75 2100 3340 © Wodonga TAFE 2012 30

31 Volume of material – triangle / square
Sample Example 2 continued With both methods of calculation it is important to remember to complete calculations inside the brackets first, starting with the inner brackets. Again add 10%, 1.06 x 10% = 0.16 = 1.22 m3 So order 1.2 or 1.4 m3

32 Volume of material – circle
Sample Example 3 Problem: To calculate the volume of concrete required for a circular pavement slab shown below Volume = Area x thickness = ( x r2 ) x thickness ( where  is roughly 3.14 and the radius is half the diameter) = (3.142 x x ) x 0.125 = 0.72 m3 Add 10% for error (which = 0.10 m3) Answer = 0.80m3 Order at least 0.8m3 if not 1 m3. 2700 diameter 125

33 Lineal Measurements Considerations
Task - You need to order materials for a project that has single line to measure, i.e. border of pavers , irrigation or drainage pipes, fencing etc Considerations The linear measurement is simply a measurement along a line, so weather on the site, or scaling off a plan, measure the distance along the line where the material is to go, i.e. each edge of the area to be paved or each line of irrigation ( you may mark out with paint on the ground first so you know where to measure Lineal measurements don’t need other dimensions of width or depth total up all the measurements

34 Lineal Measurements Sample
Example 1 - Calculating for garden borders border Set out and mark where gardens are to go using either or a string line for straight edges or a garden hose for curved edges and a can of marking paint Measure along each edge of each garden and record them in some systematic way. Total up all measurements

35 Lineal Measurements Sample
Example 2 - How much drainage line for a job Set out and mark where drainage or lines are to be installed. Measure along each line with a tape measure or measuring wheel and write the measurement for each line down on a piece of paper or in a notebook (if you only need a rough idea, you could even step it out. to do this more accurately you can measure out the distance of your each step in your stride.) Total up all measurements making sure you have a measurement for all lines

36 Lineal Measurements Sample
Example 3 - How much pipe for an irrigation job as above, set out and mark where irrigation lines will be installed ( you may use different colours for if you are to use different sized pipe i.e. mains and laterals Measure up each line and record the different colours separately Total up all measurements for each coloured line so you geta total length of pipe required for both mains and laterals

37 Lineal Measurements Sample
Example 4 how much wire and how many posts for a fence Set out and mark where fence lines are to run Measure the line or each line if more than one Total up all measurements This is where it gets a little different depending on what type of fence you are installing i.e. for a rural post and wire fence, for the wire multiply the total length by the number of strands required of each type of wire eg. if 100lm of fence x 4 strands of plain wire would = 400lm of plain wire or 100lm of fence with 2 strands of plain and 3 of barbed wire would be 200lm of plain wire and 300lm of barbed wire

38 Lineal Measurements Sample Example 4 continued
(allow extra for slack before straining and to wrap around stays) For posts divide the total length of fence by the required distance between each post to find the number of posts Eg for our 100lm of fence if using star steel posts at 4lm apart, 100 / 4 = 25 posts plus a strainer and stay at each end For a colorbond fence which come in a panels 2.36lm long (each panel has 2 end posts+ top and bottom rail + 3 sheets of tin), divide the total length by the length of a standard panel eg 30lm of fence / 2.36m per panel = panels. (so you would order 13 panels and cut the last one to fit)

39 Gradients Considerations
Task – you need to run a storm water pipe drain so that water runs in the right direction to the outlet or you need to construct a disabled ramp Considerations Gradient is a ratio between the vertical height and the horizontal distance Determine the required gradient for the task Determine the horizontal distance to be travelled i.e. The length of a ramp or pipe line Determine the vertical height available or required i.e. The difference between the top of a deck and the surrounding ground or the depth of an available pipe inlet to connect into and the minimum depth you can start your drain pipe You will need the formula F = L x G F = fall in metres L = length G = gradient G F L

40 Gradients Sample - known length and gradient
Eg 1 – you have a pipe to lay at 1 : 100 gradient over 12m distance Apply the formula H = L x G H = 12.0 x 1/100 = 12/100 = 0.120m or 120mm G = 1: 100 H = ? L =12.0 H = 120mm

41 Gradients Sample - known height and gradient
Eg 1 – you have a ramp to install for disabled access which needs to conform to Australian standards of a minimum 1:14 with a difference in levels of 600mm (or 0.6m) L = F / G L = 0.6 / (1/14) L = 0.6 / 0.07 L = 8.57m Therefore the ramp would need to be at least 8.6 m long to have the required minimum gradient G = 1: 14 H = 0.6 L =? L =8.6m

42 Terminology and conversions
Task - You are working out the hydraulics for an irrigation system or water feature and need to know some of the important terminology as different catalogues talk in different terms Some Typical Terminology and abbreviations psi = pounds per square inch Head = downward pressure of gravity on water ft = foot m = metre kPa = kilopascals Hp = horse power Gpm = gallons per minute Gph = gallons per hour Ltr = litre L/s = litres per second L/min = litres per minute L/hr = litres per hour

43 Terminology and conversions
Useful Conversions - Fluids 2.3 ft head = 1 psi 10 m head = 14.5 psi = 1 bar = 100kPa 1 m head = 1.45 psi = 0.1 bar = 10 kPa 1 imperial Gpm = L/m (1 L/m = Gpm) 1 USA Gpm = L/m (1 L/m = Gpm) Useful Facts 1 litre = 100mm3 (100mm x 100mm x 100mm) = 1kg 1000 litres = 1m3 (1m x 1m x 1m) = 1000kg = 1 tonne Some pump sizes are rated by the Gph at 1 foot of height 1m)

44 Landscaping Index Select from following links: Calculating steps Sizes
Excavating for paving Calculating pavers for a border / coping How many bricks for a wall Quantities of ingredients for mortar How to calculate a timber order Selecting a suitable pump for a water feature

45 Step sizes Considerations
Task - You have been asked to construct a set of steps as part of landscaping a back yard. The steps need to be a safe and comfortable size for the client, as well as their family and friends Considerations The building codes and Australian standards set out standard dimensions that must be used for step construction so as to ensure safety of users The formula used is 2r + t = between 590 and 700. In other words the height of 2 individual risers (r) plus the distance of one tread (t) added together should give a total dimension (=) between the accepted range of 590 to 700 mm. The ideal total dimension is 650mm

46 Step sizes Guidelines The accepted range of individual risers is between 110 and 190mm, with 150 being optimum The accepted range of individual treads is between 250 and 450, with 350 being optimum As you can see there is room for flexible design. There is also a relationship to notice: On gentle slopes, riser heights will be smaller (<150) and tread dimension larger (>350) On steeper slopes, riser heights will be larger (>150) and tread dimension smaller (<350)

47 Step sizes The process is as follows: 1. Find dimensions of flight
(For simple staircase without landing/s) 2. Find how many steps fit the flight 3. Calculate sizes of individual risers and treads 4. Check that the sizes fit into the allowed range by using the basic formula 2r + t =590 to 700

48 Step sizes Sample 1. Find dimensions of flight (For simple staircase without landing/s) Take levels to work out the height of the rise of flight ( R)  Measure the horizontal distance of the embankment, or desired route to find the going of the flight (T) Example R= 1200 T = 2500

49 Step sizes Sample 2. Find how many steps fit the flight
To find the number of steps, use the formula and divide by the ideal total dimensions by 650 i.e. 2R+T ÷ 650 this will give us an answer of approximately how many steps will fit our flight     eg 2 x ÷ 650      = ÷ 650     = 4900÷ 650      = 7.53 The answer will rarely  have a complete number, so remembering that there is always one more riser than treads, so there would be 7 treads and 8 risers in the above flight

50 Step sizes Sample 3. Calculate sizes of individual risers and treads
1st Divide the rise of the flight (R) by the number of risers  =  the size of each riser     eg  1200 (R) / 8 = 158mm (r) 2nd Divide the going of the flight (T) by the number of treads = the size of each tread eg  2500 (T) / 7 = mm (t)

51 Step sizes Sample 4. Check that the sizes fit into the allowed range by using the basic formula 2r + t =590 to 700 - if yes then you can proceed to construction phase, - if no, then you would need to select the next number of steps , for both treads and risers in the flight either  up or down until dimensions do fit the formula eg  2 x   or    = 673 (this fits within the range)

52 Excavation for Paving - calculation
Task - Before excavating an area to be paved, we need to get an idea of how much material will be dug out.   Considerations How much area is to be excavated? (Area m2) How deep will you need to excavate to.(Volume m3) How much soil will you need to remove from the work site? (Bulking Factor) How much will the soil weigh? Convert volume (m3) to mass I.e. tonnes (t) This is important so we can decide whether to use a machine or dig by hand and also so we know if we need to organise a truck - if so how big a truck

53 Excavation for Paving - calculation
Guidelines How much surface area is to be excavated? (Area) You will need to measure the area you want to excavate. You will need to know the length (L) and the width(W) of the area You then workout the Total Area to be excavated by multiplying the length (L) by the width (W) Length (l) multiplied by the width (w) = Total Area m2 l x w = A (m2) This is referred to in square metres and is written as m2 L W

54 Excavation for Paving - calculation
Guidelines How deep will you need to excavate to and what will be the Volume To work this out you will need to know How thick your paver is How thick you want to have the bedding sand How thick your base material needs to be This will be the depth of the excavation Depth of the excavation = paver thickness + Bedding Sand thickness + Base Material thickness Paver Bedding Sand Base Material Natural Ground

55 Excavation for Paving - calculation
Guidelines 3. How much soil will you need to remove from the work site? (including Bulking Factor) So what is a bulking factor? - Different types of soil become larger in size once they are dug up, as they get loosened up, they generally fluff up or become aerated. If you then try to put them back there is usually a mound of ‘excess’ To work out how much soil you will need to remove from the site, you will need to know what the soil type is. You will then need to use the following bulking factor chart to help you work out the total amount of soil to be removed. Material Bulking factor   Clay   1.4   Clay + gravel   1.18   Clay loam   1.3 Loam   1.25   Sandy loam   1.2   Sand   1.12   Gravel (6 – 50mm)   i.e. Total Volume of soil = Total area x Total Depth x Bulking Factor.

56 Excavation for Paving - calculation
Guidelines 4. How much will the soil weigh? To find out we need to Convert volume (m3) to mass I.e. tonnes (t) Once we know how many cubic metres of material we need, it is sometimes useful to have an estimate of the weight of the material so that you know how how many trucks will be needed and how big, and so that they are not overloaded. If this is the case, we need to do another calculation to convert our volume to a mass.  This calculation is based on some given facts We are told that: 1m3  = 1.4 Tonne     or in reverse;       1 tonne   =  0.73m3  i.e. multiply the quantity of m3 to be excavated by 1.4 to find the weight in tonnes

57 Excavation for Paving - calculation
Sample Step 1 - How much area is to be excavated? (Area M2) You are to excavate a driveway 6 metres x 4 metres   m x 4m = 24m2 Step 2 - How deep will you need to excavate to.(Volume m3) The drive is to be excavated to 200mm (0.2 of a metre) So multiply the area that you calculated by 0.2 24m2 x 0.2 = 4.8m3

58 Excavation for Paving - calculation
Sample Step 3 - How much soil will you need to remove from the work site? (Bulking Factor) Example If you worked out that a drive to be excavated had a volume of 24m3, and the soil type was clay, then you would multiply the volume by the bulking factor of the chart (1.4) i.e.  m3 x 1.4 =6.72 m3 Therefore you would need to be prepared to remove 6.8m3 of material

59 Sample Excavation for Paving - calculation
Step 4 - How much will the soil weigh? Convert volume (m3) to mass I.e. tonnes (t) Simply multiply the bulked volume 6.8m3 by the given conversion rate of 1.4t / m3 6.8 x 1.4 = 9.52 tonne which is equivalent to approximately 1.5 loads in a 8 tonne single axle truck loads 1 loads in a 12 tonne dual axle truck loads 5 loads in a mini landscapers truck loads (2 tonne each)

60 Calculating pavers required for a border / coping
Task - You need to find out how many pavers to order for the border of a paving project with contrasting colour, coping pavers for around a pool or to cap a set of steps Considerations The linear measurement is simply a measurement along a line, so weather on the site, or scaling off a plan, measure the distance along each edge of the area to be paved total up all the measurements divide the total length by the width of the pavers that you are using (remembering to convert all measurements to either mm or metres to make them work out properly) Note We use the symbol lm to represent lineal metres

61 Calculating pavers required for a border / coping
Sample Example 1 1. If the area you were to pave was 6m x 5m then you would measure each side 2. the total of all the measurements =22 lineal metres (22lm) 3. 22lm divided by the width of each paver (i.e. a brick paver as a header would be approximately 110mm or 0.110m therefore =22lm / 0.110 =200 pavers or Allowing that there would be approximately 38 pavers per m2 200/ 38 = 5.263m2 Note these would be ordered with the contrasting coloured paver. 4. Normally for the main colour, work out the area for the whole section of pavers then subtract the borders quantity off the quantity of main pavers required

62 Calculating pavers required for a border / coping
Sample Example 2 1. Measure the perimeter of the pool i.e. measure around the edge of the pool 2. Total up all measurements 3. Divide the total length by the width of each paver i.e. if using 400 x 400 pavers would be 0.4m Eg if the pool was 28lm around the edge divided by 0.4 28lm / 0.4 = 70 coping pavers. 4. You usually allow10% extra for these as to get around the corners, there is significant wastage due to only having one rounded edge So we would need to order % = 77 coping pavers

63 Calculating footings Consideration – Situation 1
Task - You are going to build a small brick wall and need to put a concrete footing to build it on so you will need to work out how big a footing will be required to be strong enough Consideration – Situation 1 For brick walls up to 5 courses high, use this formulae 1. Determine the total length of the footing - the length of the footing should be 0.25 x the width of the wall, longer than the wall on either end - i.e. for a single skin wall = 110 so it should be 27.5mm longer at either end or for a double skin wall which is 230mm wide, it should be 57.5mm longer either end 2. Determine the total width of the footing - The width of the footing should be 1.5 x the width of the wall i.e. 165mm for a single skin or 345mm for a double brick wall 3. Determine the total Depth of the footing - The depth of the footing should be the same as the width of the wall i.e. 110mm for a single skin wall or 230mm for a double brick wall 4. multiply L x W x D

64 Calculating footings Sample – 1 to 5 course
You are going to build a single skin wall 10m long 4 courses high 1. Determine the total length of the footing (L) 10m + [ (0.25 x the width) x2] =10m +[ (0.25 x 110mm) x2] =10m + [27.2mm x 2] =10m mm convert so both are the same unit i.e. metres 10.0m m =10.054m 2. Determine the total width of the footing (W) 1.5 x 110mm =165mm converted to metres (x 1000) = 0.165m Footing extends past the wall at each end for a length of half the wall width Width of footing 1.5 x the width of the wall

65 Calculating footings Sample – 1 to 5 course
3. Determine the total Depth of the footing (D) 110mm for single skin converted to metres (x 1000) = 0.110m 4. L x W x D x x 0.110 = 1.659m2 x 0.110 = 0.183m3 allow 10% extra Order or mix up 0.2m3 of concrete The depth of the footing is same as the width of the wall L W D

66 Calculating footings Consideration - Situation2
Task - You are going to build a small brick wall and need to put a concrete footing to build it on so you will need to work out how big a footing will be required to be strong enough Consideration - Situation2 For brick walls 6 – 10 courses high use this formulae Insert a diagram showing a small wall, footing & formulae 1. Determine the total length of the footing - the length of the footing should be 0.5 x the width of the wall longer than the wall on either end i.e. for a single skin wall = 110 so it should be 55mm longer at either end or for a double skin wall which is 230mm wide, it should be 115mm longer either end 2. Determine the total width of the footing - The width of the footing should be 2 x the width of the wall i.e. 220mm for a single skin or 460mm for a double brick wall 3. Determine the total Depth of the footing – The depth of the footing should be 1.33 x the width of the wall i.e. 147mm for a single skin wall or 306mm for a double brick wall 4. multiply L x W x D

67 Calculating footings Sample – 6 to 10 course
For a double skinned wall 12m long: 1.Determine the total length of the footing 12m + [ (0.5 x the width) x2] =12m +[ (0.5 x 230mm) x2] =12m + [110mm x 2] =12m + 230mm convert so both are the same unit i.e. metres 12.0m m =12.23m 2.Determine the total width of the footing 2 x 230mm =460mm converted to metres (x 1000) =0.460m Footing extends past the wall at each end for a length of half the wall width Width of footing twice the width of the wall

68 Sample – 6 to 10 course Calculating footings
3. Determine the total Depth of the footing 1.33 x 230mm =306mm converted to metres (x 1000) =0.306m 4. Calculate volume L x W x D 12.23 x x 0.306 =5.62m2 x 0.306 =1.719m3 add 10% extra (0.17) = 1.892m3 you need to order to next 0.2 of a metre3 so order 2m3 of concrete The depth of the footing is 1.33 x the width of the wall L W D

69 Calculating stepped footings
Task - You are going to build a small brick wall on sloping ground. You need to put a concrete footing to build it on this time, the footing will need to have steps in it Considerations 1. use a levelling instrument to help Calculate the difference in height of the ground from one end to the other. 2. Divide the difference by the height of a course of bricks (86mm). This will tell you how many steps in the footing 3. calculate the brick footing as if no steps 4. Add to the total amount of concrete required, add two brick lengths x the width of the footing x the height of a brick - for each step required i.e. 460 x W x 86 2 brick length overlap

70 Sample Calculating stepped footings 1. Measure up and find levels
If the difference in height was 222mm 222 / 86 = 2.58 steps therefore round up to 3 steps 1.83m3 Using example 1- where: L = m W = 0.165m D = m Total concrete = 1.83m3 m3 + 3 steps of overlap = 3 x [0.460 x x ] = x [ x 0.086] = x [ ] = = m3 Which in this case does not probably need to change concrete order Now try using example 2 in brick footings for practice

71 How many bricks for a wall
Task - To estimate the quantity of bricks required to construct a brick wall from a plan so that we can order enough bricks to do the job Considerations There are two alternative methods of working this out. Before we start, assume that the wall is to be constructed in stretcher bond. There will be no difference in the quantity of bricks required if another bond is used and this method is easier if we think of stretcher bond.

72 How many bricks for a wall
Method 1 Brick quantity = Number of bricks long  number of bricks high  number of bricks thick. To find the number of bricks long the wall is (how many bricks end to end along the wall), take the required length of the wall and divide it by the length of a brick plus its mortar joint ( = 240 mm) To find the number of bricks high the wall is (how many courses of bricks stacked on top of each other) take the required height of the wall and divide it by the thickness of a brick plus a mortar joint ( = 86) To find how many bricks thick the wall is, remember that a single (1) brick wall is 110 mm thick; a double (2) brick wall is 230 mm thick ( = 230 mm); and a wall three bricks thick measures 350 mm ( = 350mm).

73 How many bricks for a wall
Method 2 This method also works whatever bond is to be used. Allowing that there are approximately 50 bricks per m2 of each skin of a wall. 1.      Find the area (m2) of the wall off the plan by multiplying the height (H) by the length (L). 2.      Multiply the area by 50 bricks / m2 to get the number of bricks per skin required. 3.      Multiply by the number of skins to the wall. 4.      Add 10% for wastage etc

74 How many bricks for a wall
Sample 3590 Method 1 We will look at a wall that is to be 3590 long, 850 high and double skinned. 1.      To find the number of bricks long the wall is (how many bricks end to end along the wall), take the required length of the wall and divide it by the length of a brick plus its mortar joint ( = 240 mm) i.e. Number of bricks long = 3590 / 240 = bricks 2.      Round this up i.e. to 15 bricks 3.      To find the number of bricks high the wall is (how many courses of bricks stacked on top of each other) take the required height of the wall and divide it by the thickness of a brick plus a mortar joint ( = 86) i.e. Number of bricks high = 850 / 86 = 9.88 bricks 4.      Round this up i.e. to 10 bricks 230 850

75 How many bricks for a wall
Sample 5.      To find how many bricks thick the wall is, 230mm = 2 bricks remember that a single (1) brick wall is 110 mm thick; a double (2) brick wall is 230 mm thick ( = 230 mm); and a wall three bricks thick measures 350 mm ( = 350mm). 6.      To find how many bricks are required for the example: Brick quantity = 15  10  2  = 300 bricks 7.      Add an allowance of 10% for wastage 10% of 300  = 30 bricks 8.      Total quantity of bricks required: = = 330 bricks

76 How many bricks for a wall
Sample 3590 Method 2 Eg. Using the same wall as in the example for method 1 1.      0.850(H) x 3590 (L) = 3.05m2 of wall face 2.      3.05m2 x 50 =152 bricks per skin 3.      152 x 2 skins (for a double brick wall) = 304 bricks 4.      % = =334 Therefore the total number of bricks required is 334 which is only 4 bricks different to our first example, so use which ever method suites you best 230 850

77 Quantities of ingredients for Mortar
Task - You have a small wall to construct and need to work out the how much sand, lime and cement you will need Considerations You will need to know : how many bricks are in the wall (click to link to separate slide) The class of mortar / for ratio of sand : lime : cement That 1 cubic metre of sand has a mass of 1.36 tonnes 1m3 of cement = 60 x 20kg bags 1m3 lime = 32 x 20kg bags You will also need to use 2 tables 1 - The mortar required per 1000 bricks / per m2 table 2 – mix proportions by volume (from AS 3700)table cement lime Sand

78 Quantities of ingredients for Mortar
Sample Step 1 – Determine the number and type of bricks needed for the wall Eg you are told the wall has 2500 standard metric bricks Step 2 find the amount of mortar – using the mortar required table The chart indicates you will need 0.7 m3 of mortar for every 1000 bricks The wall will have 2500 bricks, so multiply above volume by 2.5 2.5 x 0.7 m3 = 1.75 m3 Mortar required per 1000 masonry units and per m2 Masonry units Mortar per 100 units M2 of wall per 1000 units Mortar per m2 of wall Standard metric brick laid on edge 0.4m3 28.57m2 0.014m3 Standard metric bricks 0.7m3 20m2 0.035m3 Blocks 1. 25m3 80m2 0.015m3

79 Sample Quantities of ingredients for Mortar
Step 3 - determine the mortar mix and proportions Refer to the following table for ingredient ratio for the mix to suit your project Eg, we have been told we will be using M3 class mortar as it is a low garden wall Required mix 6 part sand 1 part lime 1 part cement Class Mix proportions by volume Sand Lime Cement Water thickener practice 3 1 optional M2 9 2 No M3 6 5 yes M4

80 Sample Quantities of ingredients for Mortar
Step 4 – Find the volume of sand you’ll need As sand is coarse and cement and lime fine, the smaller particles fit in the poor spaces between sand grains so the quantity of mortar is the same as the volume of sand used eg we need 1.75m3 of mortar so will need 1.75m3 Step 5 – Find the volume of cement required The mix requires 6 : 1 : 1 Volume of Cement = 1 part cement 1.35m3 of sand parts sand (Make volume of cement the subject) Volume of cement = 1.75m3 of sand x 1 part cement 6 parts of sand = 0.291m3 Step 6 – Find the volume of Lime required (in this case the same as cement = 0.291m3 other wise substitute the mix part for lime into the equation as above)

81 Quantities of ingredients for Mortar
Sample Step 7 – Convert the volumes to units to order For the sand, it will depend on your supplier, with some 1.75m3 will suffice (Or others will sell by the tonne so you may need to convert as stated - 1 cubic metre of sand has a mass of 1.36 tonnes so 1.75m3 x 1.36t/ m3 = 2.39tonne) For cement Convert m3 to 20kg bags There is one cubic metre of cement in 60 bags so multiply volume by 60 20kg bags of cement = x 60 = bags (round up to 18bags) For Lime Convert m3 to 20kg bags There is one cubic metre of lime in 32 bags so multiply by 32 20kg bags of lime = x 32 = 9.31 bags (round up to 10 bags)

82 How to calculate a Timber order
Task - You need to find out how much timber to order to construct a project. You have a plan to work off. You need to calculate how many pieces, what sizes and then compile an order in a manner that the timber yard or hardware will understand Considerations 1. Study the plan and count all the pieces of each type of component i.e. for a deck or pergola, count how many posts, then count how many bearers / beams; joists / rafters; batons; fascias and any other trimmings. 2. List them in groups according to size i.e. all the 100x 100mm pieces and all the 150 x 50mm pieces together 3. Look at what lengths are required for the different components as they are specified and organize into groups as well, i.e. list the size and how many pieces at each length 4. Make note of what type and grade of timber is required 5. Then compile your order For decking or timber retaining walls, you may need to calculate by working out the area of coverage.

83 How to calculate a Timber order
Plan This is a plan of a small deck that we will use for the example

84 How to calculate a Timber order
Sample 1. Try and work out how many posts, bearers and joists needed for the deck plan on the previous slide. The plan indicates that: the posts are 100 x 100 x 1500 long, the bearers are 150 x 75 x 4000 long, the joists are 150 x 50 x 3000 long, and the fascia are 150 x 25 2. As you may have worked out by now, There are 12 “posts”. These are the little squares on the inside of the frame There are 3 ”bearers” These are the 3 pieces running across the screen There are 9 “joists”. These are the pieces running up and down the page at approximately  450 spacings There is fascia boards all the way around the deck so there would be 2 short lengths for each end and 2 longer lengths for the sides

85 How to calculate a Timber order
Sample 3a. The sizes then grouped by size and length 100 x / 3.0 lengths (i.e. 12 / with 2/ 1500 pieces out of each 3000 length) 150 x / 4.2 lengths (timber is only available in increments of 300mm or the old imperial “foot”) 150 x / 3.0 lengths 150 x / 4.0 lengths 3b. For a deck 4000 x 3000, you would determine which direction the decking was to run, then calculate how many pieces of the decking you are to use will fit across the width.  So if the deck were to run the 4200 using 90 x 22 treated pine decking boards, then you would divide 3000 by 90 which will give you an answer of 33.3 boards Even though in reality you will install the decking with a small gap between them, I would order: Kiln dried CCA treated pine decking  90 x / 4.2m

86 How to calculate a Timber order
Sample 4. The timber specified is F7 grade copper chromium arsenate Treated timber (CCA) 5. You would order F7 CCA timber 100 x / 3.0 150 x / 4.2 150 x / 3.0 150 x / 4.0 The process is similar for other timber projects it just takes a bit of careful practice. Short cuts may come with experience, but it is best to know the correct way first.

87 How to calculate a Timber order
Sample - fixings To calculate fixings, as with the timber, count up the attachment points for the joining of each lot of components Bolts to join Bearers to 2 per post 12 posts = 24 / 125mm M10gal coach bolts + nut and washer for each Nails to join joists to 2 per contact point and scew nailing technique 9 joists x 3 bearers = 54 contact points 54contacts x 2 nails per contact = 108 /100mm gal nails Determine best way to buy i.e. buy the qty or by the weight (see below for example)

88 How to calculate a Timber order
Sample - fixings Decking nails (or screws if specified) @500 centres, with 2 nails in each joist, on each of the 34 boards, you would need  (9 x 2) x 33 nails = 612 / 50mm galvanized deck head, twist nails Weigh out say 100 grams and count how many nails (i.e. 40.) Then multiply by 10 to get how many nails per kilo –( in this case 400) So you would need over 1.5 k nails It would be best to buy a 2 k box. Bulk nails work out cheaper, but you also get them in handy boxes. Bugle headed Screws for 2 on each end and approximately 800 to 900 centres - using 100mm screws 3750 /900 = add start end = 5 contact points and 2500 / 800 = add start end = 4 contact points Add all sides = 2 x x 4 = 18 contact points Multiply total contact points by 2 screws per contact = 36 screws

89 Selecting a Water Feature Pump
Task - You have been asked to select an appropriate pump for a waterfall feature in a new landscape. Considerations Work out your required output at spillway height Measure the length of pipe required to reach from the pump to the outlet Estimate the vertical height or required head of lift Work out the required head of pressure that the pump should provide to lift the required height Add 1 and 4 together 1 is how much water pressure you need at the top 4 is how much water pressure you need to get up to the top Select a suitable pump from catalogue charts

90 Process Selecting a Water Feature Pump
1. Work out your required output at spillway height Allow 568L /hr for every 25 mm of spillway width on the feature (150 Gph per inch) 2. Measure the length of pipe required to reach from the pump to the outlet Allow extra 3m of head / for every 30m of pipe or 300mmH / 3m pipe 3. Estimate the vertical height or required head of lift For a submersible pump situation – measure from the pump outlet to the top of the spillway (include the depth in the water) For a suction inlet set up – measure from the base of the pond to the top of the spillway

91 Process Selecting a Water Feature Pump
4. Work out the required head of pressure that the pump should provide to lift the required height Add the extra head from step 2 to the height of step 3 Using the given constant of 15L /min - per metre of head you need to lift multiply by 60 to convert to L/hr output required    5. Add 1 and 4 together as 1 is how much water pressure you need at the top and 4 is how much water pressure you need to get up to the top 6. Select a suitable pump from catalogue charts

92 Sample Selecting a Water Feature Pump Example 1
you are selecting a pump for a water feature with a 200mm wide weir, a 5m lift 15 m pipe 1. weir width is 200mm, therefore if 568l/hr per 25mm 200 / 25 = 10 10 x 568L/hr = 5680L/hr 2. if 30m of pipe needs extra 3m head 15m of pipe needs extra 1.5m head 3. 5m lift + 1.5m extra head = 6.5m head required

93 Sample Selecting a Water Feature Pump Example 1 continued
m of 15L/min per metre of head 6.5 x 15 =97.5L/min multiply by 60 mins to get L/hr 97.5 x 60 = 5850L/hr required head of lift 5. Add step 1 to step 4 = 11,530 L/hr required output of pump minimum Select suitable pump that will suit the situation and deliver more than the minimum requirement. Remember you can install flow control valves to reduce flow, but you can’t get more once its at maximum

94 Index Turf / Parks & Gardens Select from following links:
Calculating Fertiliser rates Calculating chemical rates Calculating seed rates Calculating perched water table Excavation calculations

95 Calculating fertilizers rates
Task - You are required to fertilise a garden or lawn area and are required to calculate how much fertiliser and the best product to use for both nutrients required and cost efficiency Considerations look up the percentage of the required nutrient in a couple of recommended fertilisers divide 100 by the percentage of nutrient in the fertiliser Then Multiply by the recommended application rate (g / m2 ) for the time of year Multiply this figure by the area to be fertilised (m2) Divide the cost of a bag of selected fertiliser by the weight of the bag and then multiply by the desired application rate kg / 100 m2 x $ cost of a the application for this product Repeat steps 2,3 & 4 with another product Compare cost of each product

96 Calculating fertilizers rates
Sample Example 1 – comparison of best value / most efficient product 1. If you were to use nitrogen at a rate of 8 gram per m2 and you were covering 100m2. To decide between sulphate of ammonium (21% nitrogen) or ammonium nitrate (34% nitrogen) The nitrogen rates (N) are in units of ‘actual N per 100 square metres’. The actual nitrogen rates are scheduled per month The % of each fertilizer is displayed on the fertilizing product. E.g., Actual N rate x 100 ÷ N% = Fertilizer product Rate required 2a. First we will look at sulphate of ammonium (21%) 100 / 21 % = 4.76 3a x 8 g / m2 =38.08 g / m2 4a m2 x 38g = 3800g or 3.8 kg / 100 m2 5a. Check the current cost of Sulphate of ammonium per kg Divide the cost of a bag of Sulphate of Amonium by the weight of the bag to get a $ per kg and then multiply by the required 3.8kg = $ cost of a the application

97 Calculating fertilizers rates
Sample Example 1 Continues 6. Now to compare ammonium nitrate (34%) Repeat steps 2,3 & 4 and 5 with a different fertiliser 2b / 34 = 2.9 3b x 8 g / m2 = 23.2g / m2 4b m2 x 23.2g = 2300 or 2.3kg 5b check the current cost of ammonium nitrate per kg Divide the cost of a bag of Ammonium Nitrate by the weight of the bag to get a $ per kg and then multiply by the required 2.3kg = $ cost of a the application Now you could compare cost of each more accurately as you no how much of each you would need to use

98 Calculating fertilizers rates
Sample Example 2 Fertilizer Rate kg per 100m2 x N% ÷ 100 = Actual N rate 6 kg fertilizer per 1000 square metres is therefore equivalent to 0.6 kg fertilizer per 100 square metres (m2). always work in units of per 100 square metres (m2) 0.6kg urea x 46% = kg Actual N per 100 m2

99 Chemical application Rates
Task - You have been asked to spray a small area, and need to work out how much chemical to mix into the sprayer Considerations - liquid 1litre = 1000ml 1litre weighs 1kg So a 15litre knapsack will weigh 15kg plus the weight of the actual sprayer when full 1000kg = 1 tonne So a 1000L tank weighs 1 tonne plus the weight of the tank when full Keep in mind a part full tank allows the water to move transferring the weight from side to side at each bump and can be dangerous to transport due to risk of rolling the vehicle and spilling the chemical mix

100 Chemical application Rates
Considerations continued Surface area / space to cover 1 Hectare = m2 or 100m x 100m 1000m2 = 100m x 10m or 50m x 20m etc 100m2 = 100m x 1m or 10m x 10m etc 10m2 = 10m x 1m or 5m x 2m etc An average front yard would be approximately 15m wide by 6m which would = 90 m2 An average house block would be somewhere around 800 to 100 m2 1 Hectare = 2.47acres

101 Chemical application Rates
Process Step 1- Calculate the application rate per litre. This is how much chemical to be mixed with how much water, (the rate is not always given as ml of chemical per L of water). The rate is sometimes given as a range. The smaller quantity in the range is for seedling weeds up to 15cm high the higher qty is for larger more established weeds Rate off Label divide rate by number of litres given to get a per Litre rate (a) =

102 Chemical application Rates
Process Step 2 - Now you will also need to calculate the quantity of chemical needed for size of the job at hand. You will need to measure the surface area of the area to be sprayed (length by width of which could be averaged if irregular shaped) Check to see if there is a recommended coverage given for hand spraying otherwise you will need to scale down the hectare rate as follows (i)Litres per hectare ( m2) = (ii)Divide by 100 to get a rate in litres per 100 m2 (iii)Convert to millilitres (i.e. multiply by 1000) (iv)Multiply by how many m2 to be covered to give total qty of chemical in ml to use (b) =

103 Chemical application Rates
Process Step 3 - Now you just need to put the two figures together to calculate how much mix to make up for the job Divide the total qty of chemical required (b) by the per litre rate (a) (b) / (a) =total quantity of mix required

104 Chemical application Rates
Sample Step 1-

105 Chemical application Rates
Sample

106 Calculating for a Perched Water Table
Task - To calculate the materials required for a perched water table. These include soil for the root zone, and pea gravel to allow drainage. There is sometimes an intermediate layer as well. Considerations The volume of material required is calculated for each section Steps to calculate a perched water table Calculate the area of the turf required Length x width Calculate the volume of each layer Area x depth Compaction must be included For the pea gravel section, there is a 1% fall. Calculate the volume as a triangle Height x area ÷2

107 Calculating for a Perched Water Table
Sample - Golf To calculate a perched water table Use the following example to understand the steps. Area = length by width. 20m X 10m =200m2 300mm root zone 50mm intermediate layer Pea gravel – 50mm top layer and 1% fall     Change all measurements to metres i.e. 300mm = 0.3m; 50mm = 0.05m 300mm root zone Brimmin Sand 50mm intermediate layer Pea gravel – top layer and 1% fall

108 Calculating for a Perched Water Table
Sample - Golf Pea Gravel Layer Top section Multiply the depth by area 0.05 X 200m2 =10 m3 Triangle – 1% fall 1% of the length 20m X 1 % = 0.2m Height X area ÷2 0.2m X 200m2 ÷2 = 20 m3 Add top and triangle sections together 10 m3+ 20 m3 = 30m3 Add the compaction factor 20% compaction 30m3+20% = 36 m3 Root Zone Multiply the depth by area 0.300m X 200m2=60m3 Add the compaction factor 40% compaction 60m3+ 40% = 84 m3 Intermediate Layer 0.05 X 200m2 =10 m3 20% compaction 10m3+20% = 12 m3

109 Calculating for a Perched Water Table
Sample – Bowling Green To calculate a perched water table for a bowling green with a ‘roof top’ design in the water table. Use the following example to understand the steps. Area = length by width. 40m X 40m =1600m2 Change all measurements to metres i.e. 300mm = 0.3m; 50mm = 0.05m 300mm root zone – Brimmin Sand Pea gravel – top layer and 1% fall

110 Calculating for a Perched Water Table
Sample – Bowling Green Root Zone – Brimmin Sand Multiply the depth by area 0.300m X 1600m2=480m3 Add the compaction factor 20% compaction 480m3+ 20% = 576 m3 Pea Gravel Layer Top section Multiply the depth by area 0.05 X 1600m2 =80 m3 Triangle – 1% fall Bowling green is divided into 4 sections. 40m ÷ 4 = 10m 1% of the length 10m X 1 % = 0.1m Height X area ÷2 0.1m X 1600m2 ÷2 = 80 m3 Add top and triangle sections together 80 m3+ 80 m3 = 160m3 Add the compaction factor 5% compaction 160m3+5% = 168 m3

111 Excavation calculation
Task - Before excavating an area for a project, we need to get an idea of how much material will be dug out so we can work out where to put it and what trucks and machinery may be needed.   Considerations How much area is to be excavated? (Area m2) How deep will you need to excavate to.(Volume m3) How much soil will you need to remove from the work site? (Bulking Factor) How much will the soil weigh? Convert volume (m3) to mass I.e. tonnes (t) This is important so we can decide whether to use a machine or dig by hand and also so we know if we need to organise a truck - if so how big a truck This calculation could be for a a garden bed, a new green, a drain, a concrete slab or footings or any number of other projects

112 Guidelines Volume calculation - Excavation L W
How much surface area is to be excavated? (Area) You will need to measure the area you want to excavate. You will need to know the length (L) and the width(W) of the area     You then workout the Total Area to be excavated by multiplying the length (L) by the width (W) Length (l) multiplied by the width (w) = Total Area m2 l x w = A (m2) This is referred to in square metres and is written as m2 2. How deep (D) do you need to excavate You will need the Volume formula V = L x W x D L W L W D

113 Volume calculation - Excavation
Guidelines 3. How much soil will you need to remove from the work site? (including Bulking Factor)  So what is a bulking factor? Different types of soil become larger in size once they are dug up, as they get loosened up, they generally fluff up or become aerated. If you then try to put them back there is usually a mound of ‘excess’. To work out how much soil you will need to remove from the site, you will need to know what the soil type is. You will then need to use the following bulking factor chart to help you work out the total amount of soil to be removed Material Bulking factor   Clay   1.4   Clay + gravel   1.18   Clay loam   1.3 Loam   1.25   Sandy loam   1.2   Sand   1.12   Gravel (6 – 50mm)   i.e. Total Volume of soil = Total area x Total Depth x Bulking Factor.

114 Volume calculation - Excavation
Guidelines 4. How much will the soil weigh? To find out we need to Convert volume (m3) to mass I.e. tonnes (t) Once we know how many cubic metres of material we need, it is sometimes useful to have an estimate of the weight of the material so that you know how how many trucks will be needed and how big, and so that they are not overloaded. If this is the case, we need to do another calculation to convert our volume to a mass.  This calculation is based on some given facts We are told that: 1m3  = 1.4 Tonne     or in reverse;       1 tonne   =  0.73m3  i.e. multiply the quantity of m3 to be excavated by 1.4 to find the weight in tonnes

115 Volume calculation - Excavation
Sample Step 1 - How much area is to be excavated? (Area M2) You are to excavate a garden 12 metres x 2 metres 12m x 2m = 24m2 Step 2 - How deep will you need to excavate to.(Volume m3) The drive is to be excavated to 200mm (0.2 of a metre) So multiply the area that you calculated by 0.2 24m2 x 0.2 = 4.8m3

116 Volume calculation - Excavation
Sample Step 3 - How much soil will you need to remove from the work site? (Bulking Factor) Example If you worked out that a garden to be excavated had a volume of 24m3, and the soil type was clay, then you would multiply the volume by the bulking factor of the chart (1.4) i.e.  m3 x 1.4 =6.72 m3 Therefore you would need to be prepared to remove 6.8m3 of material

117 Volume calculation - Excavation
Sample Step 4 - How much will the soil weigh? Convert volume (m3) to mass I.e. tonnes (t) Simply multiply the bulked volume 6.8m3 by the given conversion rate of 1.4t / m3 6.8 x 1.4 = 9.52 tonne which is equivalent to approximately 1.5 loads in a 8 tonne single axle truck loads 1 loads in a 12 tonne dual axle truck loads 5 loads in a mini landscapers truck loads (2 tonne each)

118 Water Harvesting and irrigation
Index Select from the following links Roof Catchment Tank Storage Water pressure town / pump Water pressure gravity feed

119 Roof Catchment Considerations
Task - You’ve been asked to work out the roof catchment of a building to see how much water can be collected in a tank Considerations To work out the catchment area you will need to know The length of the roof area that will drain into the tank (in this case 10m) The width of the roof area that will drain into the tank (in this case 5m) You will also need the area formula L x W 10m Shed 5m Tank

120 Roof Catchment Sample Step 1 – find the area of the roof catchment
Apply the formulae of the rectangle – L x W 10m x 5m = 50m2 An area of 50m2 will be draining into the tank Each 1m2 of roof will catch 1Ltr of water per mm of rainfall 10m Shed 5m Tank

121 Tank Storage Task - You have been asked to work out the size of a tank to see how much water it will store Considerations To find the volume of a round tank, you will need the formulae for the volume of a cylinder : π r2 x h Where π = 3.143 r = the radius of the tank (half the diameter) h = the height of the tank Note 1 m3 of space in the tank holds 1000Ltr of water r = 1.8m h = 2.5m

122 Tank Storage Sample Step 1- find the volume of the tank
Apply the formula : π r2 x h If the diameter = 3.6, then the radius = half or 3.6 /2 = 1.8 3.143 x 1.82 x 2.5 3.143 x 1.8 x1.8 x 2.5 25.45m3 Each m3 = 1000Ltr of water so m3 x 1000 Therefore the tank holds 25,450Ltr 3.6m 2.5m

123 Water pressure – town / pump
Task - You have been asked to install a small irrigation system so you will need to measure the water pressure and volume available from the supply Considerations To work out the if the water pressure available for an irrigation system is adequate, you will need to know: The water pressure and volume available at the water source (tap / valve) you can use one of 2 methods: a. Using a bucket – time the time it takes to fill a 9 ltr bucket and then x Add calc / chart b. Using a pressure gauge – attach to tap and turn tap on to get a static reading then turn gauge valve on to get a flow reading The minimum recommended pressure for the system emitters Divide available pressure by emitter output to calculate quantity of emitters that can be used at one time

124 Water pressure – town / pump
Sample – Bucket test At the source of the irrigation system take off i.e. Household tap close to the water meter, Turn the tap on full Move a 9ltr bucket under the tap, holding securely under the tap and using your watch, time the time it takes to fill the bucket i.e. A typical house pressure may take between 9 and 15 seconds Divide 9 ltr by the fill time and then multiply by 60 will give ltr/min Eg 9 litres divided by 12 sec = 0.75 ltr/sec 0.75ltr/sec x 60sec = 45 ltr/min If needing to convert to ltr/hr, multiply by 60min Eg 45ltr/min x 60 min = 2700 ltr/hr

125 Water pressure – Gravity feed
Task - You have been asked to install a small drip irrigation system so you will need to measure the water pressure and volume available from the supply Considerations To work out if you have sufficient pressure available and or how many emitters you can put on each line you will need to know: The height of the header tank above the emitters (which can be measured on site or off a plan) The height of the water in the header tank The minimum recommended pressure for the emitters (Which can be obtained from your irrigation supplier) That gravity applies a constant force of 9.8m/sec2 You will need the formula Pressure (kPa) = height x gravity Water level ? tank Number of emitters and output ?

126 Water pressure – Gravity feed
Sample Step 1 - find the head of water Find on the plan or measure on site : a. The height of the tank outlet above the irrigation system i.e. 1m b. The height of the water level at say half full i.e. 1.2m head of water = a + b eg = 1m + 1.2m = 2.2m Step 2 – Apply the formula (substitute values in) Pressure = head x gravity Eg = 2.2m x 9.8m/sec2 = 21.56kpa tank Water level 1.2m Tank height above system 1.0m Number of emitters and output

127 Water pressure – Gravity feed
Sample Step 3 – find the output of the emitters eg. Typical drippers range from 2 to 8ltr / hr We will use 4ltr/hr Step 4 – calculate how many emitters can be used off the system at one time Eg we have 21.56kpa of pressure If given 15ltr/min per metre of head (10kpa /m head) 21.56 divided by 10kpa = 2.156 2.156 x 15ltr/min = 32.34ltr / min multiply by 60min = 1940ltr/hr 1940 ltr/ hr divided by 4ltr/hr = 485 emitters To allow for friction loss in pipes, subtract say 10% 485 – 10% 485 – 48.5 = 436.5 Therefore in theory up to 436 emitters could be used at one time while the tank is half full Note - pipe diametre and length of each line also needs to be considered

128 Business Administration
Index Select from following links: Quoting Invoicing

129 Quote Task - You have been asked to quote on a small landscape project
Considerations Calculate your costs using prices that represent the cost of materials plus the cost of labour plus a profit margin plus GST. You will need to measure up the site accurately beforehand Measure up the site and or measure off a plan Get up to date prices on materials for each component of the job Estimate how many hours for how many workers (man hours) for each component of the job Multiply man hours by your hourly rate ( it is suggested to use an average hourly rate worked out off all workers in your team i.e. an apprentice and a tradesperson. (don’t forget to allow for on costs) Add ‘mark up’ to materials price (this is your cut for organising and purchasing goods) Add profit margin Add GST Calculate total cost Divide the total quantity of the component by the total cost to come up with a unit rate Prepare the quote

130 Quote Sample An example of how to set your workings out can be seen below Item number Part of job measurement x cost per unit Rear boundary 30.5 lineal metres (lm) of fence with each metre costing $55.00 can be shown as 30.5 lm @ $55.00 / lm = $ x single gate kit = $235.00 2.3 Western boundary 25 $55.00 / lm = $ 2.4 Eastern boundary 32.5 $55.00 / lm = $

131 Quote Sample quote presentation Business letterhead Client details:
Date: RE: Colorbond Fence and Concreting I am pleased to forward this quote for works as requested Being for: To remove old fences $380.00 To supply and install new 1500 high colorbond fences 2.1 Rear boundary 30.5 lm $ x single gate kit $ 2.3 Western boundary 25 lm $ 2.4 Eastern boundary 32.5 lm $ Fence total $

132 Quote Sample quote presentation continued
Concrete slab to rear of building As per specification but reduced in size as discussed Price includes: to supply and install 1.8 m3 of concrete as required including -excavation, set levels, fill where required, -form up, supply and place steel, chairs and jointex, -pour screed and finish concrete, -supply and install top soil and turf along edge $ Thank you for the opportunity to quote. I look forward to your reply.  Yours faithfully  This price may vary if we encounter rock or tree roots during excavation  This Quote is valid for 60 days

133 Invoicing Task - You have just finished a small landscape job.
You need to give your client an invoice Considerations 1. List items as per quote that have been completed 2. Add any extra items that were not quoted (variations to the contract) 3. Total up costs 4. Add GST 10% Show how much if already included (divided your total by 11) 5. Show total amount due

134 Invoice Sample Letter head / logo with company name and details
ABN Number Tax Invoice Client details Date Total Amount Due $ Due date and payment details Item Description Qty Unit Cost 1 Supply and install Colorbond fence plus 1 gate 88 lm $ 2 Supply & install Concrete slab 18 M2 $ variations SubTotal $ (Incl GST) $

135 List names and roles Kev, Jeni H, Phone, Email
Well Funded Project List names and roles Kev, Jeni H, Phone, Kevin Albert Land Built Environment & Sustainability (02)


Download ppt "Horticulture Maths Resource Mathematical resource for Horticulture"

Similar presentations


Ads by Google