1 PBN and the Cockpit Workshop
Technical Requirements FMS Operations and Aircraft Performances Don-Jacques OULD FERHAT Quovadis COO, October 18th 2012

2 Summary of Existing Technical Requirements
Flight Technical Error (FTE) Flight Operational Safety Assessment (FOSA) Engine Out SID (EOSID) Project title (Insert, Header & Footer)

3 Project title (Insert, Header & Footer)
FTE ASSESSMENT Desired Path Defined Path Estimated Position True Position Path Steering Error (PSE) or Flight Technical Error (FTE) with AP ON Position Estimation Error (PEE) or Navigation System Error (NSE) Path Definition Error (PDE) Total System Error (TSE) Project title (Insert, Header & Footer)

4 Statistical distribution
FTE Assessment Engine failure or system failures Wind FTE OEI / System failures FTE Statistical distribution Wind No failure FTE (95%) Project title (Insert, Header & Footer)

5 Project title (Insert, Header & Footer)
FOSA FOSA stands for Flight Operational Safety Assessment Eurocontrol Guidance Material released in 2010 and ICAO Working Paper few months later But what does it really mean? Project title (Insert, Header & Footer)

6 Project title (Insert, Header & Footer)
FOSA Guidelines Project title (Insert, Header & Footer)

7 Project title (Insert, Header & Footer)
EOSID The Departure Sector is defined in the EU-OPS The Obstacles are taken into account within a combination of: Cone from as defined in EU-OPS 1.495 Corridor with half-width equal to 2xRNP value Project title (Insert, Header & Footer)

8 Project title (Insert, Header & Footer)
EOSID Engine Failure at VEF and before DP (Diversion Point) => The EOSID is flown EOSID and Obstacle Clearance As per: Certification Specifications (CS/FAR & CS/FAR ) Operating Rules (EU-OPS 1.495) ICAO PANS-OPS Chap. II – Minimum Obstacle Clearance AC – 9 (Termination of Takeoff segment) Project title (Insert, Header & Footer)

9 Project title (Insert, Header & Footer)
CONCLUSION FTE assessment methodology should be made available for OEM FOSA guidelines should be endorsed by ICAO and shared EOSID with RNP provide safety enhancement and should be widely promoted Project title (Insert, Header & Footer)