FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version.

Similar presentations


Presentation on theme: "FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version."— Presentation transcript:

1 FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version o Item Status: Version 2.02 final as of 30 September 2010 Decision Brief to FAC leading to ASRG signature o POC: Dave McDaniel 2) Configuration Management Plan for DM 2 o Opened: April 2010 o Process step: Get FAC approval for forwarding to ASRG o Item Status: Comments have been incorporated Decision Brief to FAC leading to ASRG signature o POC: Dave McDaniel 1

2 DoDAF-DM2 v2.02 VDD Comments Summary No action New DoDAF- DM2 actions

3 Next Steps Make corrections to VDD Request ASRG approval of 2.02

4 CM Plan Comments Summary Similar to VDD

5 Next Steps Revise CM Plan 1.IAW agreed comments 2.To be consistent with ASRG CONOPS: –ASRG/FAC is the CM body for DoDAF and DM2 –Work group in an advisory role 3.Detail how FAC WG reps participate in WG recommendations –During WG meetings –Revisiting WG recommendations –Formulating alternate recommendations –Advising FAC reps to redirect or non-concur with WG recommendations Present at January FAC

6 DoDAF-DM2 WG Status Most of November WGs (three meetings) spent on revising the DoDAF model names and one- liners –Background: DoDAF models are specified in 5 ways: Name One-liner Short description Long description Mapping to DM2 data elements, aka monster matrix –Currently these are: Internally Inconsistent Overlapping Use undefined terms Do not follow a standard naming and description convention –As first step, the DoDAF-DM2 WG has been working on quick fixes to the Name and one- liners Many members believe some of the SvcVs are redundant and are recommending deletion of several. The next step, detailed analysis and cleanup of the Short and Long descriptions will involve significant effort and time –The WG recommends some quick fixes to the names and one-liners for 2.03 and will present these at the January FAC

7 DoDAF-DM2 WG CSAR Request FAC and FAC technical reps review CSAR for: –Technical agreement with WG recommendations for 2.03 made to date (see next slide) –Agreement with WG course of action and prioritization for AI/CRs in progress for 2.03 (see next 9 slides) –Any other AI/CRs that should be prioritized for 2.03 but that arent

8 2.03 WG Recommended Solutions

9 2.03 WG Recommended In- Progress AIs (p1 of 9)

10 2.03 WG Recommended In- Progress AIs (p2 of 9)

11 2.03 WG Recommended In- Progress AIs (p3 of 9)

12 2.03 WG Recommended In- Progress AIs (p4 of 9)

13 2.03 WG Recommended In- Progress AIs (p5 of 9)

14 2.03 WG Recommended In- Progress AIs (p6 of 9)

15 2.03 WG Recommended In- Progress AIs (p7 of 9)

16 2.03 WG Recommended In- Progress AIs (p8 of 9)

17 2.03 WG Recommended In- Progress AIs (p9 of 9)