0 T2S Manual of Operational Procedures (MOP)
Current Status and Way forward Item 6.2, T2S Advisory Group meeting Frankfurt am Main, 18th and19th November 2013 T2S Programme Office European Central Bank

1 Table of contents 1 Manual of Operational Procedures (MOP) 2
Operations Managers Group (OMG) 2.1 Work organisation 2.2 Delivery of the MOP 2.3 Current work status 3 Issues related to MOP of relevance for AG 3.1 Role of the AG in approval of the MOP 3.2 Crisis Management – Decision-making process

2 Manual of Operational Procedures (MOP)
Purpose and scope Purpose and nature of the Manual of Operational Procedures (MOP) The MOP describes the day-to-day T2S operational procedures for T2S Actors (CSDs, CBs (incl. ECB), DCPs, the 4CB and the T2S Coordination function) The description of the T2S Service processes and procedures is based on the best practices described in the Information Technology Infrastructure Library (ITIL® V3) The MOP shall be of a lean nature, only pointing out important activities within client context The MOP itself is not legally binding but is based on legally binding documents (Framework Agreement, Currency Participation Agreement, T2S Scope Defining Set of Documents). It is assumed that T2S Actors (excluding ICPs), comply in good faith with the processes and procedures set out in the MOP. Scope and Structure of the T2S MOP It shall cover the operational procedures aimed for T2S Actors (excluding ICPs), namely: activities to ensure the smooth and reliable processing of T2S under normal circumstances, and activities aiming to restore proper functioning of the T2S Service by mitigating the effect of incidents. The primary objective is to document operational procedures for live operations. However, the MOP also serves as a reference for testing and migration activities.

3 Operations Managers Group (OMG) Work organisation
Forum: Members being managers responsible for operations in CSDs, NCBs, 4CB/T2S as well as T2S PO Observers representing the DCPs Meetings: Physical meetings on a quarterly basis In case of need, ad-hoc teleconferences Tasks: Development (T2S project phase) and maintenance (T2S operational phase) of the T2S MOP Proposal for relevant KPIs after the bedding-down period Reviewing the T2S Service performance against the SLA Coordinating the ex-post analysis of operational incidents OMG Drafting Group Forum: Smaller group composed of operational experts nominated by CSDs and NCBs participating in the OMG, as well as 4CB/T2S PO representatives Meetings: Physical meetings on a monthly basis In case of need, ad-hoc teleconferences Tasks: Drafting of the T2S MOP

4 Operations Managers Group (OMG) Delivery of the MOP
Delivery of the Manual of Operational Procedures Release 1 - April 2014 – after OMG approval, those modules which are relevant for the User Testing preparation (6 months prior to the start of User Testing) Release 2 - September 2014 – after OMG approval, including all modules, for subsequent approval by the Governing Council Operational Procedures in Normal & Abnormal Situations - Phase II Incident Management Service Level Crisis Change, Release & Deployment Service Continuity Problem Fundamentals & Abnormal Situations - Phase 1 Request Fulfilment Access Management MOP Release – 1 Deliverables 1 2 3 4 5 6 7 8 9 10 5.1 MOP Release – 2 Deliverables Operational Procedures in Normal & Abnormal Situations – updates Information Security Management Operational Risk Service Validation and Testing Business Relationship Management (Client Relationship Management) Financial Management (Invoice Management) 5.2 11 12 13 14 15

5 Operations Managers Group (OMG) Current work status
Overall status: Work is progressing according to the revised OMG work plan (more time required than originally envisaged for finalisation of the modules) In order to streamline discussions within the OMG Drafting Group, a written procedure has been introduced to collect feedback on the modules Split into release 1 and 2 ensure that, in the light of intensive work, those MOP modules which are relevant for User Testing are delivered in April 2014 Delivery of the Manual of Operational Procedures Release 1 Scope of the release 1 modules is defined OMG reviewed 8 modules, considering 4 of those as stable, and agreed with the identified open Action Points Remaining 3 draft modules are under OMG Drafting Group consideration Release 2 Scope of the release 2 modules under discussion

6 Issues related to MOP of relevance for AG Role of the AG in approval of the MOP
After preparation of the T2S Manual of Operational Procedures by the OMG: the MOP will be submitted to the T2S Board the CSD Steering Group (CSG) and Non-euro Currency Steering Group (NECSG) will be consulted the Advisory Group (AG) can be invited to give advice, in case the T2S Board or the CSG see a need for it e.g. on aspects that have implications on DCPs or crisis management

7 Module Coverage (High Level)
Issues related to MOP of relevance for AG Crisis Management – Decision-making process Background Decision-making process during a Crisis situation was identified as the most crucial open Action Point The OMG Drafting Group considered various principles and asked for OMG guidance on the below aspects: Should the Crisis Managers’ telco consist of all Contracting CSDs and CBs? (CSDs proposed to limit the participation in order to allow for an efficient decision making) In case no consensus can be reached during the Crisis Managers’ telco, who takes the final decision? (the Eurosystem is of the view that the ECB Crisis Manager as chair of the telco) OMG resolution (5th meeting on 29 October 2013) CSDs and the Eurosystem will formulate their proposals on the matter Way forward Based on these proposals, the Eurosystem will prepare a note for consideration at the Steering Level in December 2013 To provide operational guidance to all participating T2S Actors on the communication & handling of a crisis situation Purpose of MOP Module High level Crisis Management process flow Details on Crisis Management Telco and their participants Crisis Simulation and Reporting Crisis communication channels and Interfaces and dependencies to other processes Module Coverage (High Level)