FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version.

Similar presentations


Presentation on theme: "FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version."— Presentation transcript:

1 FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version o Item Status: All comments on VDD Version 2.02 done and finalized o POC: Dave McDaniel 2) Configuration Management Plan for DM 2 o Opened: April 2010 o Process step: Get FAC approval for forwarding to ASRG o Item Status: All comments have been resolved Major re-writes in response to USAF comments on FAC and WG roles, interactions, processes, and procedures Draft revision for review 28 Feb 2011 o POC: Dave McDaniel 1

2 DoDAF-DM2 WG Status: Operations Update 358 members Went to mass distribution service for weekly agenda and readahead notices DoDAF linked-in discussion blog setup 1 st meeting of the month is now an intensive 3 hr face-to- face meeting A quarterly all-day intensive meeting is planned in conjunction with DoDAF Plenary, DARS Users Group, and Vendors Day Collaboration site better aligned with DoDAF main site

3 DoDAF-DM2 WG Status: Activity summary Four meetings in January Principal topics: –Selection of Change Requests to include in 2.03 –DoDAF model name and one-sentence cleanups: Use terms defined in DoDAF Data Dictionary Use consistent conventions and grammar Many current SvcVs felt to be duplicates of SVs and combined with SVs so Service – System interactions can be shown Service views revised for service-specific information SV project views (SV-8 and SV-9) combined into PVs

4 DoDAF-DM2 WG Status: Change Request Status This month Last month Defer to 2.04 result of 2.03 prioritization at 7 Jan WG Rejected added based on FAC CM Plan comment A few new ones (Unassigned) Progress on 2.03

5 DoDAF-DM2 WG Status: Component Conflicts Requiring FAC Resolution None Some conflicts may emerge from one liners but they are still in draft

6 DoDAF-DM2 WG Status: January Attendees Bailey, JamesCECOM LCMC Other Baron, TomASGAcademyNSA Billings, JuanitaSystems Technology Forum (STF)DISA, NAVYDISA Bocast, AlexDeloitte Consulting LLPDoD MHSUSD (P&R) Bovee, Benton "Ben"US Department of the Army Army CIO/G-6 Brooks, RexJPLOASIS and NCOICResearch Caddel, JaneThe Centech Group Industry Caron, GuySilver Bullet Solutions, Inc.DCIO A&I DirectorateDCIO A&I Christy, ChrisQinetiQ North AmericaSIAT, MARCORSYSCOMIndustry Cleary, AaronQinetiQ North AmericaMARCORSYSCOM PG-12 Intel ArchitectMarine Corps Dalpini, ThomasBoeingDoDDCIO A&I Dandashi, FatmaMitreAir Force SAF/A6 CIOSAF/CIO A6 Dove, GordonTRICARE USD (P&R) Dryer, DavidVisenseJFCOM Ellis, DaveSandiaOASISDISA Folk, TomMITRE / AF Space Command SAF/CIO A6 Gabriel, PatriciaSAIC Industry Gupton, Kevin Applied Research Labs, The University of Texas at Austin USJFCOM J7JFCOM Jones, Jeffrey General Dynamics Information Technology Joint Staff J-8/JRO-CBRND/CSAJCS J6 Kennedy, KevinSRA International, Inc. Marine Corps Kindrick, JamesNew VectorsBTADCMO Lamartin, DavidTMGNSWC-DDASN (RDA) Laskey, KenMITREOASISResearch Lee, SheltonDoD CIO/LMCO DCIO A&I

7 DoDAF-DM2 WG Status: January Attendees Levine, Leonard F.DISA GES-E DISA McCaskill, LawrenceWBBDON CIO McConkie, EileenNSWSDD McDaniel, DavidSilver Bullet Solutions, Inc.DCIO A&I DirectorateDCIO A&I Mellblom, CarsonPragmatica InnovationsLockheed-Martin Pierce, WalterVisenseJFCOM & NECMJFCOM Randolph, Robert GDIT / Joint Requirements Office - CBRN Defense STRATCOM Ritter, ColbyCACI Other Ruggiero, JerryTechnology Management GroupU.S. NavyASN (RDA) Sandridge, BrianSiemens Government ServicesJFCOM Schaefer, GregorySilver Bullet Solutions, Inc.DCIO A&I DirectorateDCIO A&I Snyder, ForrestArmy G6/CIO Army CIO/G-6 Sparks, LoriTMGNSWC-DDASN (RDA) Stenerson, BobVector Planning & Services, Inc. (VPSI) DISA Stucki, LeonFuture Tech Systems, Inc Vendor Terebesi, Paul AHQMC CD&I Marine Corps Thomas, Jaymie Marine Corps Systems Command Varveris, LouIBM Vendor White, ChrisCasewise Vendor Wilson, AllenSRA Wright, ScottNorthrop Grumman Aerospace Systems Integrated Defense Enterprise Architecture Industry Yohman, JohnnyVisenseJFCOM J89/J84 / NCECMJFCOM