ESE-BE Section Meeting 14 Jan 11 1.ESE-BE: health check 2.Relocation: plans, dreams and reality 3.MARS 4.Review of section.

Similar presentations


Presentation on theme: "ESE-BE Section Meeting 14 Jan 11 1.ESE-BE: health check 2.Relocation: plans, dreams and reality 3.MARS 4.Review of section."— Presentation transcript:

1 ESE-BE Section Meeting 14 Jan 11 1.ESE-BE: health check 2.Relocation: plans, dreams and reality 3.MARS 4.Review of section activities 5.Section walk 6.AOB

2 1. ESE-BE in 2008 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus V. Lahanas E. DosSantos P. Fontaine S. Baron M. Hansen M. Joos P. Petit R. Spiwoks P. Jurga W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal L. Amaral S. Dris D. Ricci S. Villa E. Dho (AGS) R. McLaren Nov 2008: 22+9

3 ESE-BE in 2009 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus Z. Gao E. DosSantos S. Baron M. Hansen M. Joos P. Petit R. Spiwoks W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal I. Papakonstantinou S. Papadopoulos S. Seif el Nasr H. Versmissen E. Dho (AGS) R. McLaren V. Bobillier W. Iwanski Nov 2008: 22+9 Nov 2009: 24+7

4 ESE-BE in 2010 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus Z. Gao E. DosSantos S. Baron M. Hansen M. Joos P. Petit R. Spiwoks S. Feger W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal I. Papakonstantinou S. Papadopoulos S. Seif el Nasr H. Versmissen P. Haigh E. Dho (AGS) R. McLaren V. Bobillier W. Iwanski Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010 departures : 6+3 Dec 2010 arrivals: 0+2 : 18+6

5 ESE-BE in 2011 Section Leader Pool and PowerBoards and SystemOpto F. Vasey C. Moine S. HaasJ. Troska M. Hansen A. Guy C. Richard B. Smaniotto R. Camus Z. Gao S. Baron M. Joos P. Petit R. Spiwoks P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal S. Papadopoulos S. Seif el Nasr P. Haigh Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010: 18+6 V. Bobillier W. Iwanski F. Vasey

6 ESE-BE in 2011 Section Leader Pool and PowerBoards and SystemOpto F. Vasey C. Moine S. HaasJ. Troska M. Hansen A. Guy C. Richard B. Smaniotto R. Camus Z. Gao S. Baron M. Joos P. Petit R. Spiwoks P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal S. Papadopoulos S. Seif el Nasr P. Haigh Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010: 18+6 IC contracts: 2 V. Bobillier W. Iwanski F. Vasey

7 PH-ESE-BE sections

8 PH-ESE-BE Contracts

9 PH-ESE-BE Regrouping

10 2. Relocation Now completed !!! Now completed !!! Many thanks for the M 3 of work Many thanks for the M 3 of work Many thanks for supporting the nuisance Many thanks for supporting the nuisance

11 Relocation: Pool -> Bldg 13-R

12 Relocation: Power -> Bldg 14-R

13 Renovation: More to come in S 13-S Complete replacement of sanitary installation Complete replacement of sanitary installation Complete replacement of chilled water supply Complete replacement of chilled water supply Entrance Hall renovation Entrance Hall renovation Renovation of Bldg 14 doorways (walls and ceiling) Renovation of Bldg 14 doorways (walls and ceiling)

14 Retrospectively Since 2007: Since 2007: Stabilized contract situation Stabilized contract situation Established common workplace with shared labs and workshops Established common workplace with shared labs and workshops Some consolidation still expected in 2011 Some consolidation still expected in 2011 Time has come to fully exploit this situation Time has come to fully exploit this situation Collaborate across teams and sections Collaborate across teams and sections Participate in seminars and working groups Participate in seminars and working groups

15 3. MARS Starts on 31st Jan Starts on 31st Jan Same process as last year Same process as last year Next year will be different Next year will be different

16 4. Activities and Projects in Section Pool and Power Boards and Systems Opto

17 5. Section walk & lunch

18 Itinerary

19 5. AOB … Thank you for the great work in 2010 Thank you for the great work in 2010