Download presentation
Presentation is loading. Please wait.
Published byReagan Roseberry Modified over 10 years ago
1
14-Jan-11francois.vasey@cern.ch0 ESE-BE Section Meeting 14 Jan 11 1.ESE-BE: health check 2.Relocation: plans, dreams and reality 3.MARS 4.Review of section activities 5.Section walk 6.AOB
2
14-Jan-11francois.vasey@cern.ch1 1. ESE-BE in 2008 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus V. Lahanas E. DosSantos P. Fontaine S. Baron M. Hansen M. Joos P. Petit R. Spiwoks P. Jurga W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal L. Amaral S. Dris D. Ricci S. Villa E. Dho (AGS) R. McLaren Nov 2008: 22+9
3
14-Jan-11francois.vasey@cern.ch2 ESE-BE in 2009 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus Z. Gao E. DosSantos S. Baron M. Hansen M. Joos P. Petit R. Spiwoks W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal I. Papakonstantinou S. Papadopoulos S. Seif el Nasr H. Versmissen E. Dho (AGS) R. McLaren V. Bobillier W. Iwanski Nov 2008: 22+9 Nov 2009: 24+7
4
14-Jan-11francois.vasey@cern.ch3 ESE-BE in 2010 Section Leader Pool and PowerBoards and SystemsOptoManagement F. Vasey C. Moine P. HarwoodS. HaasS. ReynaudJ. Troska F. Vasey A. Guy C. Richard B. Smaniotto R. Camus Z. Gao E. DosSantos S. Baron M. Hansen M. Joos P. Petit R. Spiwoks S. Feger W. Bialas P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal I. Papakonstantinou S. Papadopoulos S. Seif el Nasr H. Versmissen P. Haigh E. Dho (AGS) R. McLaren V. Bobillier W. Iwanski Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010 departures : 6+3 Dec 2010 arrivals: 0+2 : 18+6
5
14-Jan-11francois.vasey@cern.ch4 ESE-BE in 2011 Section Leader Pool and PowerBoards and SystemOpto F. Vasey C. Moine S. HaasJ. Troska M. Hansen A. Guy C. Richard B. Smaniotto R. Camus Z. Gao S. Baron M. Joos P. Petit R. Spiwoks P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal S. Papadopoulos S. Seif el Nasr P. Haigh Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010: 18+6 V. Bobillier W. Iwanski F. Vasey
6
14-Jan-11francois.vasey@cern.ch5 ESE-BE in 2011 Section Leader Pool and PowerBoards and SystemOpto F. Vasey C. Moine S. HaasJ. Troska M. Hansen A. Guy C. Richard B. Smaniotto R. Camus Z. Gao S. Baron M. Joos P. Petit R. Spiwoks P. Vichoudis S. Detraz C. Sigaud C. Soos P. Stejskal S. Papadopoulos S. Seif el Nasr P. Haigh Nov 2008: 22+9 Nov 2009: 24+7 Dec 2010: 18+6 IC contracts: 2 V. Bobillier W. Iwanski F. Vasey
7
14-Jan-11francois.vasey@cern.ch6 PH-ESE-BE sections
8
14-Jan-11francois.vasey@cern.ch7 PH-ESE-BE Contracts 2007 2011
9
14-Jan-11francois.vasey@cern.ch8 PH-ESE-BE Regrouping 2007 2011
10
14-Jan-11francois.vasey@cern.ch9 2. Relocation Now completed !!! Now completed !!! Many thanks for the M 3 of work Many thanks for the M 3 of work Many thanks for supporting the nuisance Many thanks for supporting the nuisance
11
14-Jan-11francois.vasey@cern.ch10 Relocation: Pool -> Bldg 13-R
12
14-Jan-11francois.vasey@cern.ch11 Relocation: Power -> Bldg 14-R
13
14-Jan-11francois.vasey@cern.ch12 Renovation: More to come in 2011 13-S 13-S Complete replacement of sanitary installation Complete replacement of sanitary installation Complete replacement of chilled water supply Complete replacement of chilled water supply 14-13-11 Entrance Hall renovation 14-13-11 Entrance Hall renovation Renovation of Bldg 14 doorways (walls and ceiling) Renovation of Bldg 14 doorways (walls and ceiling)
14
14-Jan-11francois.vasey@cern.ch13 Retrospectively Since 2007: Since 2007: Stabilized contract situation Stabilized contract situation Established common workplace with shared labs and workshops Established common workplace with shared labs and workshops Some consolidation still expected in 2011 Some consolidation still expected in 2011 Time has come to fully exploit this situation Time has come to fully exploit this situation Collaborate across teams and sections Collaborate across teams and sections Participate in seminars and working groups Participate in seminars and working groups
15
14-Jan-11francois.vasey@cern.ch14 3. MARS Starts on 31st Jan Starts on 31st Jan Same process as last year Same process as last year Next year will be different Next year will be different
16
14-Jan-11francois.vasey@cern.ch15 4. Activities and Projects in Section Pool and Power Boards and Systems Opto
17
14-Jan-11francois.vasey@cern.ch16 5. Section walk & lunch
18
14-Jan-11francois.vasey@cern.ch17 Itinerary
19
14-Jan-11francois.vasey@cern.ch18 5. AOB … Thank you for the great work in 2010 Thank you for the great work in 2010
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.