Progress and Status. 6.25.2013 COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED 7.17.2013 ORCHESTRA LIFT IS OPERATIONAL STAGE.

Similar presentations


Presentation on theme: "Progress and Status. 6.25.2013 COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED 7.17.2013 ORCHESTRA LIFT IS OPERATIONAL STAGE."— Presentation transcript:

1 Progress and Status

2

3 COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE FLOOR INSTALLATION IN PROGRESS COILING FIRE DOOR AT BACK OF STAGE INSTALLED

4 DRYWALL COMPLETE TAPE, BED AND FLOAT COMPLETE FIRST COAT OF PAINT INSTALLED KNEE WALL ROUGH IN COMPLETE WOOD PANELS AT PROSCENIUM WALL COMPLETE TAPE, BED AND PAINT ONGOING AT KNEE WALLS

5 WALL HAVE BEEN PAINTED WOOD PANELS AT EAST AND WEST WALL COMPLETE CURRENTLY INSTALLING PERFORATED WALL PANELS KNEE WALL TAPE, BED AND PAINT ONGOING EUROSPAN ACOUSTICAL PANEL TRACK INSTALLED

6 6/25/13 DRYWALL COMPLETE TAPE, BED AND PAINT COMPLETE REVEALS AT THE WALL PANELS ONGOING FIXTURE INSTALLATION ONGOING WOOD PANEL INSTALLATION ONGOING

7 DRYWALL COMPLETE TAPE & BED RADIUS WALL COMPLETE PRIME PAINT AT BALCONY LEVEL GLASS RAIL VERTICAL POSTS INSTALLED LEVEL 5 FLOAT AND PRIMER COMPLETE WOOD PANEL INSTALLATION AT THEATER LEVEL ONGOING CEILINGS COMPLETE AT STAIR A & B TERRAZZO ONGOING AT STAIR B

8 TERRAZZO COMPLETE LIGHT FIXTURES INSTALLED WALL COVERINGS INSTALLED CONCRETE LAVS INSTALLED

9 FACE BRICK AND CAST STONE COMPLETE AT ELEVATOR TOWER FACE BRICK AND CAST STONE COMPLETE AT THE PAVILION PLASTER SOFFIT AT THE EAST ARCADE COMPLETE PLANTERS AT EAST ENTRY INSTALLED MONUMENT STAIRS INSTALLED AT EAST ENTRY MOON STREET SUB GRADE COMPLETE WEST SIDE. CURB, GUTTER AND BUS LANE INSTALLED ON WEST SIDE OF MOON]

10 ENTRY PLASTER NEARLY COMPLETE MOON STREET GRADE WORK 90% COMPLETE CONTECH DETENTION UNIT ONGOING CONTECH DETENTION UNIT NEARLY COMPLETE INSTALLATION OF REVISED SUB GRADE ON EAST SIDE OF MOON ONGOING

11 PAVERS COMPLETE AT NORTH ARCADE PLASTER AT THE MANSARD ROOF COMPLETE ALUMINUM TRELLIS COMPLETE LIGHT POLES INSTALLED AND OPERATING TREE INSTALLATION ONGOING

12 PAVER INSTALLATION ONGOING RIBBON CURB FOR PAVERS COMPLETE SOUND DOOR INSTALLATION ONGOING TREE INSTALLATION ONGOING


Download ppt "Progress and Status. 6.25.2013 COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED 7.17.2013 ORCHESTRA LIFT IS OPERATIONAL STAGE."