Email update from Gerry I will sail with Eric instead of Stefan Physicals will be in Ollie Berka's hands by the end of this week Manual has been uploaded.

Similar presentations


Presentation on theme: "Email update from Gerry I will sail with Eric instead of Stefan Physicals will be in Ollie Berka's hands by the end of this week Manual has been uploaded."— Presentation transcript:

1 Email update from Gerry I will sail with Eric instead of Stefan Physicals will be in Ollie Berka's hands by the end of this week Manual has been uploaded We want to test a different way to grab on to the T2P by lowering the ERS and then locking with the ERS in place instead of locking and then going for the grab. We may want to have the small version of the overshot that Tom has so we can do some quick testing onboard before operations begin. If this work we may reduce the risk of overextending the ERS to the point where it will not retrieve the T2P (similar to what happened in the last try at Sugarland). I can give you more details later on. LDEO personnel planning on arriving in Curacao on May 26th; we have not purchased tickets but I do not see any problems on making this; we will buy tickets either at the end of this week or early next week.

2 26 April 2012 MDHDS Mtg 1.Equipment Delivery a.What will be/has been delivered when b.Detailed contents for all containers sent to TAMU 2.TAMU Shipping Plan a.Complete manifest of all boxes shipped to Curacao (Gerry) – send to Tessa to post online

3 UT Delivered MDHDS Tether assembly T2P Two complete tools Mobile pressure chamber Misc. Tools, spare parts, etc. Safety equipment (hard hats, gloves, etc.)

4 3. JR Field Test DateEvent 15-Apr-12 All components delivered to TAMU crate ready for shipping to JR Field Test 26-May-12 Latest date for all to arrive in Curacao 28-May-12 Depart Curacao 2-Jun-12 Arrive Bermuda 6-Jun-12 Donnie departs Bermuda 4-8-Jun-12 MDHDS JR Field Test 3.JR Field Test a.Tom: Status of testing plan for JR deployment b.Status of medical paperwork (Bob) c.Sample requests (whole core/shipboard plan) d.Who gets on/off when and where? e.What equipment is being hand-carried

5 UT Hand-Carry Spare T2P parts still being made Cables New 5kpsi sensors Laptops Manuals Deployment sheets

6 4.Manual Report by each contractor a.Gerry: Review ERS Operations Manual Addendum and send Chris any edits

7 5. Remaining tasks Task #ActionDueOwnerAddition al StatusNotes 5.00Deliverables15-Apr-12All 5.01Parts List for MDHDS (outer barrel) 29-Feb-12Tom PIn Progressinclude images, weight, dimensions, and descriptions 5.05Deployment Manual for MDHDS (outer barrel) 29-Feb-12Tom PIn Progressinclude images, descriptions, and part number 5.08MFTM Manual/Parts List29-Feb-12Eric MIn Progresspartially uploaded need to add software 5.10Give Donnie B and Peter P feedback on T2P and Inner Barrel deployment manuals 30-Mar-12Peter PAllIn Progress 5.12Macro for realtime analysis25-May-12Amy G.Added Since Last Meeting 5.13Send results from past deployments to Amy Germaine 26-Apr-12Peter PAdded Since Last Meeting 7.00CloseoutTBDPeter F

8 6. Calendar of upcoming events DateEvent 15-Apr-12 All components delivered to TAMU crate ready for shipping to JR Field Test 10-May-12 Phone Meeting 26-May-12 All arrive in Curacao 28-May-12 Depart Curacao 2-Jun-12 Arrive Bermuda 4-8-Jun-12 MDHDS JR Field Test 1-Jul-12 Closeout