Presentation is loading. Please wait.

Presentation is loading. Please wait.

MeDON meeting 09 mars 2012 1 IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.

Similar presentations


Presentation on theme: "MeDON meeting 09 mars 2012 1 IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware."— Presentation transcript:

1 MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware WP 4.2 site surveys WP 4.4 test of the proof of concept cable deployment and landing shore station

2 MeDON meeting 09 mars Observatory architecture designed for shallow water deployed by local & small nautical means able to be maintain with local means able to host new sensors (any type) easy to adapt to deep water or other layout

3 MeDON meeting 09 mars shelter (energy & telecom) Armored cable End termination Hybrid connector Removable module node JB Sensors Equipment camera frame (heavy)

4 MeDON meeting 09 mars

5 MeDON meeting 09 mars

6 MeDON meeting 09 mars Tests in pool and at sea

7 MeDON meeting 09 mars MeDON meeting 09 mars IFREMER Electronics & software

8 MeDON meeting 09 mars MeDON meeting 09 mars General electrical sketch Molène shelter

9 MeDON meeting 09 mars MeDON meeting 09 mars Molène shelter electrical sketch

10 MeDON meeting 09 mars General electrical sketch Node 10/22

11 MeDON meeting 09 mars Node electrical sketch 11/22

12 MeDON meeting 09 mars General electrical sketch Junction Box 12/22

13 MeDON meeting 09 mars Junction box electrical sketch 13/22

14 MeDON meeting 09 mars Overall software architecture MeDON meeting 09 mars

15 MeDON meeting 09 mars MeDON meeting 09 mars Software architecture

16 MeDON meeting 09 mars Open test bench MeDON meeting 09 mars

17 MeDON meeting 09 mars Hydrophone integration & tests (open test bench) MeDON meeting 09 mars

18 MeDON meeting 09 mars

19 MeDON meeting 09 mars WP 4.2 site surveys Regulation: Marine Natura 2000 site (special protection area) Environmental impact assessment waiting Navy permission (ok for other authorities)

20 MeDON meeting 09 mars

21 MeDON meeting 09 mars

22 MeDON meeting 09 mars

23 MeDON meeting 09 mars

24 MeDON meeting 09 mars

25 MeDON meeting 09 mars

26 MeDON meeting 09 mars Cable landing site

27 MeDON meeting 09 mars

28 MeDON meeting 09 mars

29 MeDON meeting 09 mars

30 MeDON meeting 09 mars


Download ppt "MeDON meeting 09 mars 2012 1 IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware."

Similar presentations


Ads by Google