Download presentation
Presentation is loading. Please wait.
Published byTrevon Hum Modified over 10 years ago
1
ToiletDriver room Water Pump Generator Site Guard Room Main Office Workshop Meeting Room Storage Place Main Office New Office (6 office containers) New Storage (2 sea containers) ELECT/ANBP Compound in Bamyan General view Ablution Block Sewage Tank
2
Office Containers Stair Office Containers at ELECT/ANBP Compound in Bamyan General view
6
Outdoor part of Split Air Conditioners, 1200 BTU
7
Office Containers, First floor plan General view 8, Double glasses PVC windows, 1000x800 mm 3 Split Air Conditioners, 1200 BTU 3, PVC Doors, 2000x1000 mm 8, Double glasses PVC windows, 1100x800 mm 3 Split Air Conditioners, 12000 BTU 6096 mm 4876 mm 2438 mm Internal Dimensions: Length – 5758 mm; Wight – 4704 mm Internal Dimensions: Length – 3758 mm; Wight – 2352 mm
8
Office Containers, Second floor plan General view 3 Split Air Conditioners, 1200 BTU 3, PVC Doors, 2000x1000 mm 8, Double glasses PVC windows, 1100x800 mm 3 Split Air Conditioners, 12000 BTU 6096 mm 4876 mm 2438 mm Internal Dimensions: Length – 5758 mm; Wight – 4704 mm Internal Dimensions: Length – 3758 mm; Wight – 2352 mm
9
Ablution Block, floor plan 2438 mm 6096 mm 3 Ceramic Sinks, Standard Size with Tap 5 Ceramic Toilets Shower, Standard Size 4 Double Glasses Windows, 500x 300 mm
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.