Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.

Similar presentations


Presentation on theme: "Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review."— Presentation transcript:

1 Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review

2 House Wharf Road after 1906 earthquake

3 House 1939 with stairs to lookout

4 Plan of lot as purchased in 1955 (note: stairs leading up hillside)

5 2005

6 House Old quarters building with wing wall additions from 1964

7 Front view of main house and lab

8 Salt water concrete holding tank added in 1964

9 mm Feeds to tank – water cannot be dumped back into bay

10 Back door to house

11 Back entrance to cellar

12 East face where 1964 stairs were removed

13 Fence and concrete buttress wall at rear of main house

14 Front steps

15 Deterioration at front step post

16 First Floor Plan

17 Stove in kitchen

18 Kitchen

19 Second floor plan

20 Front office area Second floor

21 Second floor

22

23

24 Back office area Second floor

25 Attic space

26 Biology Lab floor plan

27 Exterior of west face of lab (old Coast Guard Boat House)

28 Exterior of lab building

29 Entrance to lab

30 Lab interior

31 Typical storage

32 Wet table

33

34

35 Storage shed floor plan

36 Workshop

37 Dock at low tide

38 View to Kent Island

39 Questions & Answers


Download ppt "Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review."

Similar presentations


Ads by Google