1 P r o f e s s i o n a l Daniel L. Salvey PortfolioPortfolio PortfolioPortfolio

2 Target Store T-2371 Anchorage NE, Alaska Anchorage, AK Roles & Responsibilities Project Manager: Primary contact for Client and Contractor TeamsProject Manager: Primary contact for Client and Contractor Teams Collaborated with A/E partners to develop an Alaskan PrototypeCollaborated with A/E partners to develop an Alaskan Prototype Maintained client branding while providing for unique solutionsMaintained client branding while providing for unique solutions Weekly meetings for change managementWeekly meetings for change management Teamed with new (to Target) contractor team in Alaska to create solutions to all problems in an extremely timely manner, reducing costs and saving time, while also bringing the new contractor team up to speedTeamed with new (to Target) contractor team in Alaska to create solutions to all problems in an extremely timely manner, reducing costs and saving time, while also bringing the new contractor team up to speed Managed a team in all phases from Pre-Design through Project Close-outManaged a team in all phases from Pre-Design through Project Close-out

3 Target Store T-2371 Anchorage NE, Alaska Project Parameters New Construction: Concrete tilt- panel with form linerNew Construction: Concrete tilt- panel with form liner Exposed Timber Trellis and exterior roof supporting elementsExposed Timber Trellis and exterior roof supporting elements Seismic Category DSeismic Category D Expanded stockroom and larger sales floor planExpanded stockroom and larger sales floor plan Reduced construction time window due to weather constraintsReduced construction time window due to weather constraints Anchorage, AK

4 Target Store T-2371 Anchorage NE, Alaska Anchorage, AK Project Parameters Unique exterior designUnique exterior design Arctic insulation strategiesArctic insulation strategies Heated sidewalks and crosswalkHeated sidewalks and crosswalk Collaborated with new (to Target) Civil Engineer to develop the most desirable solutions while adhering to branding guidelinesCollaborated with new (to Target) Civil Engineer to develop the most desirable solutions while adhering to branding guidelines

5 Project Parameters Expanded stockroom, loading docks and larger sales floor planExpanded stockroom, loading docks and larger sales floor plan Additional mechanical space required for snow melt system in sidewalkAdditional mechanical space required for snow melt system in sidewalk Fifty five foot tower at corner of building, signage on four sides and unique lighting solutionsFifty five foot tower at corner of building, signage on four sides and unique lighting solutions Tower required extensive coordination due to jurisdictional requirements, fenestration design, structural seismic D considerations, and lightingTower required extensive coordination due to jurisdictional requirements, fenestration design, structural seismic D considerations, and lighting Collaborated with Form Liner Manufacturer to create custom plank patternCollaborated with Form Liner Manufacturer to create custom plank pattern Target Store T-2371 Anchorage NE, Alaska Anchorage, AK

6 Target Store T-2187 La Cantera Roles & Responsibilities Project Manager: Primary point of contact for Client, Consultant, and Contractor TeamsProject Manager: Primary point of contact for Client, Consultant, and Contractor Teams Negotiated and monitored Scope, Schedule & BudgetNegotiated and monitored Scope, Schedule & Budget Managed a team for all phases from Pre-Design through the start of Construction AdministrationManaged a team for all phases from Pre-Design through the start of Construction Administration Provided design input to bring reality to owner provided conceptual design drawings for the implementation of CDsProvided design input to bring reality to owner provided conceptual design drawings for the implementation of CDs San Antonio, TX

7 Target Store T-2187 La Cantera Project Parameters New Construction: Concrete tilt- panels with stone veneer and tiled shed roof canopiesNew Construction: Concrete tilt- panels with stone veneer and tiled shed roof canopies Texas site observation rules (more visits than typical)Texas site observation rules (more visits than typical) Worked through project issues with difficult jurisdiction to achieve permit by deadlineWorked through project issues with difficult jurisdiction to achieve permit by deadline Unique branding elements, including a circular stone veneered hole in blade wall, requiring approval from Target Design contactUnique branding elements, including a circular stone veneered hole in blade wall, requiring approval from Target Design contact San Antonio, TX

8 Target Store T-2228 Cleveland South, OH Roles & Responsibilities Project Manager: Primary point of contact for Client, Consultant, and Contractor TeamsProject Manager: Primary point of contact for Client, Consultant, and Contractor Teams Negotiated and monitored Scope, Schedule & BudgetNegotiated and monitored Scope, Schedule & Budget Managed a team for all phases from Pre-Design through the start of Construction AdministrationManaged a team for all phases from Pre-Design through the start of Construction Administration Provided design input to bring reality to owner provided conceptual design drawings for the implementation of CDsProvided design input to bring reality to owner provided conceptual design drawings for the implementation of CDs Project Parameters Unique Exterior DesignUnique Exterior Design Structural Brick, CMU, Stone Veneer, Steel, and Corrugated Metal ExteriorStructural Brick, CMU, Stone Veneer, Steel, and Corrugated Metal Exterior Inset CMU panels and structural brick shellInset CMU panels and structural brick shell Unique Signage Element and Lighting DesignUnique Signage Element and Lighting Design Collaborated with consultant team to provide solutions to unique sub- soil conditionsCollaborated with consultant team to provide solutions to unique sub- soil conditions Cleveland, OH

9 Target Store T-2312 Springfield West, PA Roles & Responsibilities Primary point of contact for Client, Consultants, and ContractorPrimary point of contact for Client, Consultants, and Contractor Negotiated and monitored Scope, Schedule & BudgetNegotiated and monitored Scope, Schedule & Budget Managed a team for all phases from Pre-Design through the start of Construction AdministrationManaged a team for all phases from Pre-Design through the start of Construction Administration Coordinated and Supervised Design Development, Construction Document and Bid Document ProductionCoordinated and Supervised Design Development, Construction Document and Bid Document Production Project Parameters Unique Multi-level Mall Attached Target StoreUnique Multi-level Mall Attached Target Store Smart Beam floor systemSmart Beam floor system Reduced floor to floor heights from prototype solutionsReduced floor to floor heights from prototype solutions Due to the unique nature of the design for this project, a larger consultant team was used, including personnel from Targets in-house Architecture and Engineering teams, resulting in greater coordination and intrapersonal complexitiesDue to the unique nature of the design for this project, a larger consultant team was used, including personnel from Targets in-house Architecture and Engineering teams, resulting in greater coordination and intrapersonal complexities Springfield Township, PA Pre-Construction Photo

10 Target Store T-2312 Springfield West, PA Springfield Township, PA

11 Project Parameters CMU, structural brick, and EIFS exteriorCMU, structural brick, and EIFS exterior Type 2B, attached to strip mallType 2B, attached to strip mall Corner Tower elementCorner Tower element Proximate to City Offices, presenting sensitive design issuesProximate to City Offices, presenting sensitive design issues Safeway Store #1751 Molalla, Oregon Roles and Responsibilities Collaborated to create design elevations using scans of Design Architect preliminary elevations and PhotoshopCollaborated to create design elevations using scans of Design Architect preliminary elevations and Photoshop Job Captain with Complete authority over CDsJob Captain with Complete authority over CDs Provided in-office and on site CA servicesProvided in-office and on site CA services

12 Project Parameters Brick Veneer, Stucco, and CMUBrick Veneer, Stucco, and CMU Unified design concepts coordinated with project developmentUnified design concepts coordinated with project development Unique corner entryUnique corner entry Roseville, CA Safeway Store #1890 Highland Crossing

13 Roles & Responsibilities Created presentation boards in PhotoshopCreated presentation boards in Photoshop Provided colored elevations using AutoCAD and PhotoshopProvided colored elevations using AutoCAD and Photoshop Scanned and imported hand sketches provided by Design ArchitectScanned and imported hand sketches provided by Design Architect Coordinated and Produced Contract Documents for constructionCoordinated and Produced Contract Documents for construction Provided Construction Administration ServicesProvided Construction Administration Services Project Parameters Structural Brick, CMU, and stucco exteriorStructural Brick, CMU, and stucco exterior Patterned sidewalk and ornate cornice for upscale aestheticPatterned sidewalk and ornate cornice for upscale aesthetic Design aesthetic coordinated to match developmentDesign aesthetic coordinated to match development Safeway Store #1890 Highland Crossing Roseville, CA

14 Roles & Responsibilities Complete authority over contract documentsComplete authority over contract documents Consultant coordinationConsultant coordination CA ServicesCA Services Project Parameters CMU, structural brick, and EIFS exteriorCMU, structural brick, and EIFS exterior Type 2B, attached to strip mallType 2B, attached to strip mall EIFS logo due to signage limitationEIFS logo due to signage limitation Tile roofing at canopyTile roofing at canopy Safeway Store #1713 West Linn West Linn, OR

15 Roles & Responsibilities Created presentation boards in PhotoshopCreated presentation boards in Photoshop Provided colored elevations using AutoCAD and PhotoshopProvided colored elevations using AutoCAD and Photoshop Scanned and imported hand sketches provided by Design ArchitectScanned and imported hand sketches provided by Design Architect Provided 3-D site using AutoCAD Architectural Desktop 3.3Provided 3-D site using AutoCAD Architectural Desktop 3.3 Safeway Store # The Promenade Sacramento, CA

16 Roles & Responsibilities Collaborated to create presentation boards using AutoCAD and PhotoshopCollaborated to create presentation boards using AutoCAD and Photoshop Produced full set of Contract Documents for bidProduced full set of Contract Documents for bid Provided VE Services to reduce the cost of original designProvided VE Services to reduce the cost of original design Provided in-office construction administration servicesProvided in-office construction administration services Safeway Store # Piilani Village Kihei, Maui, HI Project Parameters Unique Hawaiian style motifUnique Hawaiian style motif Balance Safeway Prototype Design Guidelines with developer and jurisdiction driven design conceptsBalance Safeway Prototype Design Guidelines with developer and jurisdiction driven design concepts

17 Roles & Responsibilities Created presentation boards using AutoCAD and hand rendering techniquesCreated presentation boards using AutoCAD and hand rendering techniques Produced multi-disciplinary Contract Documents for planning, bidding, permit, and constructionProduced multi-disciplinary Contract Documents for planning, bidding, permit, and construction Provided assistance for in-office construction administration servicesProvided assistance for in-office construction administration services Ashland Retirement Residence Ashland, OR

18 Cedar Falls Conference & Retreat Center Camp Cedar Falls, Angelus Oaks, CA Roles & Responsibilities Created presentation boards using AutoCAD and hand rendering techniquesCreated presentation boards using AutoCAD and hand rendering techniques

19 Freelance Project: Lockard Residence Custom Home Addition - CDs & SketchUp Model Roles & Responsibilities Provided Design and Construction Documents for addition to existing 2-story cottage (future garage conversion)Provided Design and Construction Documents for addition to existing 2-story cottage (future garage conversion) Produced full set of Preliminary Contract Documents for bid using AutoCADProduced full set of Preliminary Contract Documents for bid using AutoCAD Provided Sketchup model for owner evaluation and presentation to the Gorge Review BoardProvided Sketchup model for owner evaluation and presentation to the Gorge Review Board Washougal, WA

20 Thank you for viewing my Professional Portfolio Have a great day! dan.salvey@verizon.net h.503.925.1353 | m.503.970.7822 http://mysite.ncnetwork.net/resyzsau/