WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.

Similar presentations


Presentation on theme: "WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO."— Presentation transcript:

1 WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO

2 CHAMPION HEIGHTS COMMERCIAL BUILDING Purpose: The goal of our project is to design a commercial building to meet the needs for the growing community of Boerne, TX. Scope: Design of 63,000sf concrete building Drainage and Detention study Onsite Parking Area, Drainage, Water, Sewer Improvements Offsite Streets, Drainage, Water, and Sanitary Extension Improvements. Construction Documents Eric Beals

3 SITE LOCATION Eric Beals

4 PROPOSED SITE LAYOUT Eric Beals

5 DESIGN SCHEDULE PRIMAVERA P6 DESIGN SCHEDULE Planning Monitoring Reporting Horacio Montejano

6 BUILDING SPECIFICATIONS 3 Floors 63,000 SF office building Glass, Stucco and brick exterior Ryan Krause

7 LOADS AND ANALYSIS Loads Considered: Dead Live Wind Code used: ASCE 7-10 Drawings done with: AutoCAD Civil 3D 2011 Google SketchUp Analysis done with: SAP2000 15 Rain Snow Seismic Ryan Krause

8 ENVIRONMENTAL Must Follow Texas Commission on Environmental Quality Guidelines Minimal Tree Removal No Indications of Hazardous Materials or any Area of Contamination Randy Rodriguez

9 GREEN DESIGN  Green Building Materials: 10% Fly Ash incorporated into foundation Use of Local Materials encouraged Contractors must provide construction waste management plan  Optional Roof Garden : Native Drought resistant Plants to absorb CO2  Energy Efficient Appliances: Low Flow Toilets Low Flow Faucets Waterless Urinals LED Lighting W/ Motion SENSORS Up to 30% in energy & water savings expected! Horacio Montejano

10 BORING LOG 1 2 2. SHALLOW LIMESTONE STRATA 1. HIGH PLASTICITY INDEX Horacio Montejano

11 FOUNDATION ANALYSIS 1 2 3 4 56 7 8 Divide foundation layout into 8 strips Analyze each strip for the shear & moment developed by the line of column loads Horacio Montejano

12 FOUNDATION ANALYSIS Determine:  Effective depth of Shear Prism for diagonal tension shear  Maximum Positive & Negative Moments (Interior & Exterior)  Steel reinforcement @ pu(max)=577.55 Kips; D=20” (+) Interior = 1269.97 k-ft (-) Interior = 186.05 k-ft (+) Exterior = 958.21 k-ft (-) Exterior = 109.75 k-ft Conventional Grade 60 Rebar Horacio Montejano

13 FOUNDATION DESIGN  Foundation Type Selected: BEAM & SLAB Foundation (Slab is suspended)!  WHY? Simple Economics: Less Steel + Less Concrete Savings! Rigid Design Reduction in Differential Settlement High F.S. Eases Construction Floor slab is entirely isolated from expansive soils Horacio Montejano

14 STRUCTURAL OVERVIEW Office Building 3-Stories: Concrete Structure Decking (One-Way Joist 2’ Module) Braced Frame (CMU Walls) Randy Rodriguez

15 CIVIL DESIGN Grading Existing conditions 8’ elevation change Proposed conditions 3’ Change in elevation (parking grade.5%) 3’ deep detention Eric Beals

16 CIVIL DESIGN Storm Detention 98,000 cubic feet 12” outlet 1’ freeboard Eric Beals

17 CIVIL DESIGN SW3P 662LF OF Silt Fence 3 Rock Filter Berms Eric Beals

18 UTILITY LAYOUT  Water  R.O.W. regulation  12-inch main extension boring under HWY 46.  Total Length 438 LF  3-inch water lateral  Service demand 14 edus  Sewer  8-inch 5.8% slope  Capacity 251 edus Cameron Miller

19 PAVEMENT DESIGN From Geotech Report and Analysis  S.N.-2.22  Concrete Asphalt Layer  2-inch  Base Layer  8-inches Cameron Miller

20 COST ESTIMATE Cameron Miller


Download ppt "WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO."