Presentation is loading. Please wait.

Presentation is loading. Please wait.

Alex Raver Mike Zeeck Deric Wallace Joe Roach Lumiere Place - St. Louis  Floating floor casino  Under budget  Mixed use building Alex Raver.

Similar presentations


Presentation on theme: "Alex Raver Mike Zeeck Deric Wallace Joe Roach Lumiere Place - St. Louis  Floating floor casino  Under budget  Mixed use building Alex Raver."— Presentation transcript:

1

2 Alex Raver Mike Zeeck Deric Wallace Joe Roach

3 Lumiere Place - St. Louis  Floating floor casino  Under budget  Mixed use building Alex Raver

4 Aqua Building - Chicago  5% underbudget  3 weeks ahead of schedule  Fasttrack Mike Zeeck

5 City Center West  8 story complex  Urban business enviroment  Fastrack Joe Roach

6 Newport Beach Enviromental Center – Newport Beach  Leed  Triple net zero  Re-used siding for exterior  North South Orientation  No A/C  Photovoltaic Panels Deric Wallace

7 Project Engineer (Joe Roach) Vice-President (Deric Wallace) President (Alex Raver) Project Superintendant (Mike Zeeck) Project Team Architect Owner Subcontractors

8  GE healthcare addition  Microsoft Data Center  Johnson Controls Campus- Glendale  Dell office building  Whitehouse  Pentagon rebuild  Statue of liberty renovation  Woo Estates

9 We are a dedicated team that believes in only delivering the highest quality product. We take an opportunity at all times to learn new techniques, adapt to the changing times, and expand our capabilities as a company. We strive to raise the standard for green construction across the country.

10  Nebraska School Activities Association Office Building located at 500 Charleston Street Lincoln, Nebraska.  The structure is a two story office building.  Face brick and decorative masonry units with a large glass atrium for the entrance.  The interior of the office building will include office space, media rooms, conference rooms, kitchen along with other uses in a typical office building.  The roofing system to this project will be a minimal pitched single ply roofing system.  Work also includes all site work necessary, new fire sprinkler system, new electrical service and landscaping.

11  Provide the highest quality product  Complete the project on schedule  Complete the project under budget  Project milestones completed on time  No accidents or injuries on time  Ensure client satisfaction at completion  Initiate sustainable practices to reduce waste

12  Roles of key participants  Correspondence Routing  Inspections and inspection process  Meeting Process  Testing  Payment  Safety  Risk Management  Closeout Procedures  VE  Warranty

13  Material Selection  Construction Method Evaluation  Construction waste management plan  System efficiency evaluation  Sustainability

14  Site specific plan for each project  Weekly tool box talks  EMR.53  On site safety coordinator  Calisthenics each morning

15  Fast  Efficient  Safe  Client collaboration  Advanced BIM use  Cost saving plan  We deliver on what we promise

16


Download ppt "Alex Raver Mike Zeeck Deric Wallace Joe Roach Lumiere Place - St. Louis  Floating floor casino  Under budget  Mixed use building Alex Raver."

Similar presentations


Ads by Google