4 TYPICAL CLASSROOM ELEVATION

5 Miller Driscoll Building Committee Construction Update Thursday March 3, 2016 5:00 PM - 7:00 PM Presented by: Turner Construction, CMA 5 Additions & Alterations Miller-Driscoll School

6 Current Monthly Activity – Continued Concrete Foundations – Completed Demolition at Miller Connection – Started Mass Site Cuts & Fills – 50% Complete with Foundations – Underground Utilities in Pre-K wing Complete – Administration relocated storage area in Miller Lower Level 6

7 7 Additions & Alterations Miller-Driscoll School Construction at Miller ConnectorConstruction at Driscoll Connector

8 8 Additions & Alterations Miller-Driscoll School New Mechanical Room Foundations New Addition Foundations

9 Additions & Alterations Miller-Driscoll School March - Monthly Activity – Complete Foundations – Start Steel Erection – Pour Slab in Pre-K – Relocate Access Road into Site South of Current Access – Install Water, Gas, Electrical and IT conduits from Wolfpit – Start demolition and layout in Lower Level Miller Storage area 9

10 10 Miller Lower Level – Storage Area Additions & Alterations Miller-Driscoll School

11 Storm-water Erosion Control – Complaint to Mr. Mike Conklin, Environmental Affairs about erosion control from the 2-24-16 Rainstorm – 1.57” of Rain; – Erosion Control Breech in six locations on site. – Wilton Environmental Affairs Noted a Violation formally – Repairs and additional silt fence, hay bales and check dams were installed when the area dried out – Mr. Conklin has reviewed repairs and has requested a few precautionary measures and will continue to be monitoring the site on a regular basis 11

12 12 Additions & Alterations Miller-Driscoll School Erosion Control Looking NorthSediment leaving the site

13 13 Additions & Alterations Miller-Driscoll School Erosion Control Breech NE

14 14 Additions & Alterations Miller-Driscoll School Repaired Silt FenceRepaired Silt Fence/Silt Sock

15 15 Additions & Alterations Miller-Driscoll School Secondary Lines of Silt Fence installedStone Check Dams

16 Critical Schedule Planning – Roof & Exterior Shell Installation starts in April 2016 – Planning with Administration for Summer Renovation – Moving Companies – Received Budget – Re-evaluate the Project Schedule Overall 16 Additions & Alterations Miller-Driscoll School

17 17 Additions & Alterations Miller-Driscoll School

18 Public Out Reach – Parent Committee Mtg 3-15-16 @ 5:00pm – Steel Beam – Students Handprints 18

19 Additions & Alterations Miller-Driscoll School Steel Beam Signage 19