1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.

Similar presentations


Presentation on theme: "1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee."— Presentation transcript:

1 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee Review November 9-10, 2009

2 2 BROOKHAVEN SCIENCE ASSOCIATES Outline Introduction Technical Progress Cost Overview –Budgeted value, –Contract value, –Approved changes to date –Estimate of Potential Changes –EAC Schedule Status Issues & Risks Look Ahead Conclusions

3 3 BROOKHAVEN SCIENCE ASSOCIATES Introduction Construction Inspection Team (CIT) - Responsible to: Inspect work of the contractor to verify conformance of installed work with contract plans and specifications. Coordinate work of BNL support groups with contractor to assure that all required permits are in place prior to commencement of work. Assure that contractors perform work in accordance with applicable work controls requirements. Coordinate with the NSLS-II CSEs to assure that work progresses in accordance with the contract ESH requirements. Review contractor payment requests to verify completed quantities. Confirm testing proceeds with contract plans and specifications. Timely Response to Contractor(s) Requests Follow-up on Compliance Notices to Ensure Matter Satisfactorily Resolved.

4 4 BROOKHAVEN SCIENCE ASSOCIATES Overview Scope (WBS 1.05.03.02) Construction of the Ring Building, Service Buildings Installation of Utility Mains to Ring Building, including – Primary Electric – Connection to Central Chilled Water & Compressed Air Mains – Installation of Water Loop On Site Infrastructure Improvements – Roads, Parking, Storm & Sanitary Systems Cost Contract amount = $172.6M Initial Baseline = $167M (CD- 3) Pre-bid estimate = $194M (Sept 08)

5 5 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Project Site at January ’09

6 6 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Project Site at October ‘09

7 7 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Concrete Phasing Plan

8 8 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress –Baseline Critical Path – Construction Activities thru’ November ‘09

9 9 BROOKHAVEN SCIENCE ASSOCIATES Project Site at October ‘09 Technical Progress Ratchet Wall #25B (Col Ln. 3) Ratchet Wall 27A (Col Ln. 3) Ratchet Wall #22A (Col Ln. 103 ) Ratchet Wall #21A (Col Ln. 103 )

10 10 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Project Site at October ‘09 Vehicle Tunnel Column Footing B-78

11 11 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Project Site at October ‘09 Curbs & Sidewalk in Progress

12 12 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Underground Utilities Domestic Water Main Installation Electrical Ductbank Installation

13 13 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Some Challenges Faced Geo-Thermal Experiment Water Main Relocation for New Steam Line

14 14 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress

15 15 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress Ring Building Project: CF Inspection Responsibility Matrix DIVISION 2 - SITE WORK SPEC. SECTION TORCON S/CBNLBNL VENDORBNL PROCEDURE SITE EXCAVATION AND ROUGH GRADING INSPECTION02210 LT-CF-05-001 COMPACTION DENSITY TEST02210 MT GROUPLT-CF-05-002 MOISTURE DENSITY TEST02221 MT GROUPLT-CF-05-002 TOP SOIL FINISHED GRADING INSPECTION02260 LT-CF-05-001 EXFILTRATION TEST ON STORM DRAINAGE SYSTEM02463VOLLERS LT-CF-05-001 TESTING OF HIGH PRESSURE STEAM SYSTEM02490SIMS LT-CF-05-001 DENSITY TESTS ON PAVING SUB GRADE02513VOLLERS LT-CF-05-001 TEST COMPLETED WATER MAINS FOR LEAKAGE02665VOLLERS LT-CF-05-001 INSPECT U/G CHILLED WATER SYSTEM BEFORE BACKFILLING02676SIMS LT-CF-05-001 PRESSURE TESTING OF EXTERIOR COMPRESSED AIR SYSTEM02678SIMS LT-CF-05-001 LEAKAGE TEST OF SANITARY SEWERS02732VOLLERS LT-CF-05-001

16 16 BROOKHAVEN SCIENCE ASSOCIATES Technical Progress 9/9/09 Meeting with. Testing Agency to Review Concrete Sampling & Testing procedures 4000 psi

17 17 BROOKHAVEN SCIENCE ASSOCIATES Schedule Status Concrete Cylinder Break Test Results

18 18 BROOKHAVEN SCIENCE ASSOCIATES Schedule Status Overall Project Status –16% complete (per cost basis) –Concrete Work on Schedule, recovered rain impacts in June & September –Underground Utility Work lagging due to Coordination Effort (required to resolve interferences See Drawing) –Fabrication of Structural Steel slightly behind early finish projections, but ahead of baseline.

19 19 BROOKHAVEN SCIENCE ASSOCIATES Schedule Status Underground Utility Plan C – 600 Substantial Utility Installation Extensive coordination

20 20 BROOKHAVEN SCIENCE ASSOCIATES Schedule Status Intermediate Project Milestones thru’ March 2010

21 21 BROOKHAVEN SCIENCE ASSOCIATES Schedule Status Mandatory Project Milestone Report

22 22 BROOKHAVEN SCIENCE ASSOCIATES Issues & Risks Potential Problems Winter Concrete Work –Winter Mix Design, Placement & Protection Plan Utility Installation in Inner Courtyard –Resolve Interferences (all resolved to date) –Coordination / Staging of Trades for Utility Work Potential for Construction Outpacing Design by ASD & XFD Groups –Could necessitate revision to installed work Coordination between LOB & Ring Building Contractors

23 23 BROOKHAVEN SCIENCE ASSOCIATES Look Ahead Place Storage Ring Tunnel Floor Slab at Utility & Vehicle Tunnels –Allows backfill & continuity of Ring Storage Tunnel construction Construction of Underground Electric ductbanks Installation of Steam Main to Project Site Construct Selected Roadways & Parking Areas –Control site drainage, –Facilitates better soil erosion control

24 24 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Continue to encourage pace of construction At a safe rate Continue diligence of Inspections Advance Construction Operations with an eye to Minimizing Risks and Mitigating delays