13 17 952 $21.1M $9.2M $387K $11.5M.

Similar presentations


Presentation on theme: "13 17 952 $21.1M $9.2M $387K $11.5M."— Presentation transcript:

1

2

3

4

5

6

7

8 13 17

9 952

10 $21.1M $9.2M $387K $11.5M

11

12

13

14

15

16 BLYTHEWOOD PROJECTS WideningStatus Blythewood Rd Widening (Syrup Mill Road to I-77)Not Started Blythewood Road Widening and ImprovementsNot Started Hardscrabble Rd Widening (Farrow to Kelly Mill)ROW Phase Intersection Hardscrabble Rd. and Kelly Mill Rd./Rimer Pond Rd.ROW Phase Special Kelly Mill Rd.Not Started Bikeway Blythewood Rd Bikeways (Winnsboro to Main)Not Started Resurfacing (2015-2016)Status Roundtree Road Construction Complete Cedar Lake Road Construction Phase Craigwood Drive Construction Phase Esther Circle Construction Phase Foxwood Knoll Construction Phase Kelly Court Construction Phase Locklier Road Construction Phase Penelope Lane Construction Phase Ralph Court Construction Phase Runneymede Court Construction Phase Runneymede Drive Construction Phase Watts Lane Construction Phase Whiteoak Ridge Road Construction Phase

17 BLYTHEWOOD PROJECTS Dirt RoadStatus Overlook DriveConstruction Complete Annie Entzminger CourtConstruction Complete Dunes PointConstruction Complete Peafowl RoadConstruction Complete Elton Walker RdDesign Phase Entzminger RdDesign Phase Lacaya RdDesign Phase Lorick RdDesign Phase Minger RdDesign Phase Net Dean RdDesign Phase New Hope DrDesign Phase Paul RdDesign Phase S Hask JacobsDesign Phase Sassafras RdDesign Phase Shadow Mist LnDesign Phase Twin Ponds RdDesign Phase Wages RdDesign Phase Adams Pond RdPlanning Phase Davis Smith RdPlanning Phase George Robertson RdPlanning Phase Graddick RdPlanning Phase High Valley TrailPlanning Phase ME CunninghamPlanning Phase N Hask Jacobs RdPlanning Phase Russ Brown RdPlanning Phase Wilcox RdPlanning Phase Wild Goose RdPlanning Phase Wilson CirPlanning Phase

18 Blythewood Road Widening (Syrup Mill Road to I-77)

19 Blythewood Road Widening and Improvements

20 Hardscrabble Road Widening (Farrow Road to Kelly Mill Road) Legend Proposed Improvement 3 Lane Widening

21

22

23 Penny Tax benefits for Blythewood

24 A bit about myself: Originally from Cheltenham in England (100m west of London) Grew up next to Spirax Sarco where my Dad worked, Decided I wanted to work there too and stayed 44 years, Spirax Sarco Inc relocated here from Allentown PA in ’98, My family and I relocated to Columbia in ’99 to assist with the start-up of the new plant, retired in ‘08, We liked Blythewood and moved to Ashley Oaks in ’04, Elected to Secretary of the Ashley Oaks HOA in ’12, Served on Planning Commission ‘13-’15, Elected to Town Council November 2015.

25 Penny Tax benefits for Blythewood The Richland County Transportation Department manages all items of the Transportation Penny Program approved by voters in November 2012. This program is broken up into three major categories and is funded by a special sales and use tax for not more than 22 years or until a total of $1.07 billion in sales tax revenue is collected, whichever occurs first. The three major categories include: Improvements to highways, roads (paved and unpaved), streets, intersections, and bridges including related drainage system improvements ($656,020,644) Continued operation of mass transit services provided by Central Midlands Regional Transit Authority including implementation of near, mid and long-term service improvements ($300,991,000) Improvements to pedestrian sidewalks, bike paths, intersections and greenways ($80,888,356) The Richland County Transportation Department

26 Penny Tax benefits for Blythewood Public Safety Potential for Economic Development Right of Way Obtained Design Work Completed Dedicated Funds Traffic Volume and Congestion Truck Traffic Pavement Quality Index Environmental Impact Alternative Transportation Solutions Consistency with Local Land Use Plans and Neighborhood Improvement Plans Sequencing / Practicality Connectivity Prioritization Factors:

27 Penny Tax benefits for Blythewood

28 Proposal accepted by Richland County (Town resolution 2014.005): Widen & improve Blythewood Road from I-77 to Syrup Mill; ◦ Widen and improve Blythewood Road from Syrup Mill to Fulmer Road, ◦ Widen and improve Blythewood Road: I-77 to Wilson, ◦ Improvements to McNulty, ◦ New Creech Connector to Wilson, ◦ Traffic Circle at Cobblestone Park, ◦ Traffic Circle at Blythewood/Creech intersection. ◦ (Widening of Hard Scrabble Road)

29 Blythewood Road (I-77 to Syrup Mill Road) Legend Proposed Improvement 3 Lane Widening 5 Lane Widening

30 Legend Proposed Improvement 3 Lane Widening Blythewood Road Part 2 (Syrup Mill Road to Fulmer Road) Blythewood Road (I-77 to Syrup Mill Road)

31 Penny Tax benefits for Blythewood McNulty Creech Syrup Mill-Fulmer I77 – Syrup Mill I77 - Main Circle Location of road improvements in Blythewood

32 Penny Tax benefits for Blythewood Map Data 2014 Google Legend Proposed Improvement 5 Lane Widening Hardscrabble Road (Farrow Road to Lake Carolina Boulevard)

33 Penny Tax benefits for Blythewood

34

35

36

37 NOTE: All amounts in this document are shown in thousands of dollars and represent the year the work is planned to begin ProjectRankDistrict Phase of Work CY 2015CY 2016CY 2017CY 2018CY 2019 Total CTIP Cost Cost to Complete Hardscrabble Road Widening (Farrow Rd to Lake Carolina Blvd) 1 17, 8, 9 PE ROW CONST $11,700$9,080 $29,860 TOTAL$11,700$9,080 $29,860 Clemson Road Widening (Old Clemson Rd to Sparkleberry Crossing) 29, 10 PE $600 ROW $2,400 CONST $9,700 TOTAL$600$2,400$9,700$12,700 Leesburg Road Widening (Fairmont Road to Lower Richland) 2 311 PE ROW CONST $4,000 TOTAL$4,000 North Main Street Widening (Anthony Ave to Fuller Ave) 3 44 PE $1,500 ROW$3,000 CONST $5,500$10,000 $25,500 TOTAL$10,000 $30,000 Bluff Road Widening (I-77 to Rosewood Dr) 510 PE $800 ROW $9,100 CONST $14,959 TOTAL$800$9,100$14,959$24,859 Shop Road Widening (I-77 to George Rogers Blvd) 610 PE $1,000 ROW $16,400 CONST $18,957 TOTAL$1,000$16,400$18,957$36,357 Atlas Road Widening (Bluff Rd to Garners Ferry Rd) 710, 11 PE $1,000 ROW $7,000 CONST $17,811 TOTAL $1,000$7,000$17,811$25,811 Table 2(a)Roadway Widening Projects

38 Penny Tax benefits for Blythewood NOTE: All amounts in this document are shown in thousands of dollars and represent the year the work is planned to begin ProjectRankDistrict Phase of Work CY 2015CY 2016CY 2017CY 2018CY 2019 Total CTIP Cost Cost to Complete Pineview Road Widening (Bluff Rd to Garner's Ferry) 810, 11 PE $1,100 ROW $10,500 CONST $20,935 TOTAL$1,100$10,500$20,935$32,535 Blythewood Road Widening (Syrup Mill Road to I-77) 92, 7 PE $300 ROW $4,100 CONST $6,119 TOTAL$300$4,100$6,119$10,519 Broad River Road Widening (Royal Tower Rd to Peak Interchange) 101 PE $1,500 ROW $7,500 CONST $27,243 TOTAL$1,500$7,500$9,000$27,243 Spears Creek Church Road Widening (Two Notch Rd to Percival Rd) 119, 10 PE $1,600 ROW $7,400 CONST$28,982 TOTAL$1,600 $36,382 Lower Richland Boulevard Widening (Rabbit Run Rd to Garner's Ferry Rd) 1211 PE $200 ROW $2,300 CONST $4,173 TOTAL$200 $6,473 Polo Road Widening (Mallet Hill Rd to Two Notch Rd) 138, 9, 10 PE$500 ROW $1,300 CONST $9,274 TOTAL $500 $10,574 Table 2(a)Roadway Widening Projects(Continued) KEY: PE - Preliminary Engineering (Design); ROW - Right of Way; CONST - Construction; DB - Design Build

39 Penny Tax benefits for Blythewood

40 Quick Summary followed by Q and A: Blythewood slated for $29m Penny tax benefit First stage: Blythewood Road to Syrup Mill. Design start CY 2016; construction start approx. CY2018 Second Stage: Town Center and out to Fulmer, design start approx. CY2019 We will need to negotiate Cobblestone Circle in Stage 1 Follow progress at www.richlandpenny.com

41 Penny Tax benefits for Blythewood

42 Thank you for listening! Time for a question or two?

43