1 Bancroft Elementary School School Building Committee Meeting February 24, 2010

2 Geotechnical Testing Locations HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET

3 McArdle Gannon Associates prepared the preliminary geotechnical studies. 17 Borings & 15 Test Pits Geotechnical analysis concluded no impact to any option. Existing topsoil and subsoil are unsuitable for structural support. Soils between 2 - 5 feet are to be excavated and replaced with structural fill. Preliminary foundation recommendation is for shallow spread footings with a slab-on-grade. (No structural piles required) Stabilized groundwater between 2’-6” and 3’-8” observed through monitoring wells. Geotechnical Report Summary

4 Geo-Environmental Report Summary ADS Environmental Engineering prepared the Environmental Site Assessment Historic research, substrate samples, and analytical laboratory testing suggest no significant release of hazardous materials or release of oil. Analytic tests for metals and petroleum hydrocarbons were below reportable concentrations. Further investigation at location of removed below grade oil tank, above grade oil storage tank and tank enclosure will be required during Schematic Design phase.

5 Traffic Report Summary Existing Bancroft Road Access HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET

6 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Scenario 1 2-Way Driveway: Bancroft Road

7 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Scenario 2 2-way Driveway: Bancroft Road Driveway: Holt Road

8 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Scenario 3 2-way Driveway: Bancroft Road Driveway: West Knoll Road

9 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Scenario 4 Entrance: Bancroft Road Exit: West Knoll Road

10 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Scenario 5 Entrance: Bancroft Road Exit: Holt Road

11 Traffic Report Summary Investigate installation of sidewalks on Holt Rd between Bancroft and Stinson Investigate installation of sidewalks on Stinson Rd Investigate installation of sidewalks on Bancroft Rd to the west of the school driveway Restrict parking near Holt/Stinson intersection Trim vegetation on Bancroft Rd across from the school driveway Trim vegetation adjacent to Holt Rd at Stinson Rd Provide adequate on-site parking to accommodate demand Adjust traffic flow at West Knoll Rd and S. Main St with intersection signage (if W. Knoll used for access) Relocate utility pole at Holt Rd/Stinson Rd intersection (if Holt used for access)

12 West Knoll Road Access WEST KNOLL ROAD

13 West Knoll Road

14

15 1C 1D 2C3 Options 1A

16 Existing Site

17 Holt Road Access Point HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Pre K Media Center Cafe Gym Main Entry Existing Building Wetlands Building & Parking Set Back - Typical West Knoll Road Access Point Bancroft Road Access Point Building & Parking Set Back - Typical Wetlands Potential Storm Water Detention Area Wetland: to be surveyed Wetland: to be surveyed Tot Lot Reservoir

18 HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Reservoir Gym Media Center Cafe Pre K Main Entry Potential Storm Water Detention Area West Knoll Road Access Point Bancroft Road Access Point Building & Parking Set Back - Typical Wetlands Existing Building Wetlands Building & Parking Set Back - Typical Holt Road Access Point Wetland: to be surveyed Wetland: to be surveyed Tot Lot

19 Holt Road Access Point HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Reservoir Cafe Media Center Pre K Gym Main Entry Potential Storm Water Detention Area Existing Building Wetlands Building & Parking Set Back - Typical West Knoll Road Access Point Bancroft Road Access Point Building & Parking Set Back - Typical Wetlands Wetland: to be surveyed Wetland: to be surveyed Tot Lot

20 West Knoll Road Access Point Bancroft Road Access Point Building & Parking Set Back - Typical Wetlands HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Reservoir Cafe Media Center Gym Existing Building Holt Road Access Point Pre K Main Entry Potential Storm Water Detention Area Wetlands Building & Parking Set Back - Typical Tot Lot Potential Storm Water Detention Area Potential Storm Water Detention Area

21 Holt Road Access Point HOLT ROAD BANCROFT ROAD WEST KNOLL ROAD SOUTH MAIN STREET Reservoir Gym Media Center Café Pre K Main Entry Potential Storm Water Detention Area Wetlands Building & Parking Set Back - Typical West Knoll Road Access Point Bancroft Road Access Point Building & Parking Set Back - Typical Wetlands Tot Lot

22 Proposed Site and Design Alternatives

23

24 1B1C 1D 2A2B2C3 1A Options

25 MSBA Guidelines

26 District Capacity

27

28

29 Existing Bancroft School Building Heights