Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date: 06.13.2013.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date: 06.13.2013."— Presentation transcript:

1 Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date: 06.13.2013

2 Federal Aviation Administration Agenda Patch 4 Testing Status / MEM-EWR Installs MEM / EWR Operational Trials Status/Results Patch 5 / Build 7 Status MEM Test NCP Extension: JW925-FDIO-1001 / T34501 2

3 Federal Aviation Administration Current DTAP Patch 4 Outlook 6/4:Factory Acceptance Testing Completed @ Thales 6/5:Patch 4 Installed at the WJHTC 6/6-14:Patch 4 Testing at the WJHTC 6/17:EWR Install 6/18-20:EWR Pre-SAT Testing 6/24:MEM Install (Includes UPS upgrade) 6/25-27:MEM Pre-SAT Testing along with proposed 6/27 MGT demo - 24x7 Checkpoint 3

4 Federal Aviation Administration MEM Trials Current Status Continued FDX Limited Ops (As of 6/13): -35 to 50 DCL ops ‘shakeout’ period (20 MD-11, 15 B777 ops minimums) -36 successful CAF DCL issued since April 17 start (28 MD-11, 8 B777) -34 CAF, 2 UM80 Initial DCLs Issued -5 UM79, 3 UM80 Revisions issued -Additional ops up to 6/23 planned MD-11 UM79 Revisions stopped after May 3 Op due to FDX FD observed en-route FMS Map ‘To Point’ Magenta Line re-draw (back to original route): -Boeing/Honeywell identified and can reproduce issue -Procedural Work around being presented to Flight Deck Working Group at Boeing/Long Beach -EWR/UPS MD-11 to try to duplicate issue -MEM 24x7 Trials Ops ‘Go’ Date pending FDX work around acceptance 4

5 Federal Aviation Administration EWR Trials Current Status Continued Limited Ops (As of 6/13): -6 successful CAF DCL issued since May 16 start (3 MD-11, 2 B777, 1 A340) -6 CAF DCLs Issued -2 UM79, 1 UM80 Revisions issued -Additional ops up to 6/14 planned -Limited Trials Ops can resume 6/21 -Additional ATC DTAP support expected after 6/21 or Refresher Training Domestic and International Participation: UPS BAW SAS -FDX (pending first Revenue operation) -DLH, DLH Cargo, Swiss Air (pending initial testing) 5

6 Federal Aviation Administration DTAP Patch 5 and Build 7 Status DTAP Patch 5 Requirements / Delivery Status: -EWR ATC Requirements (4 Total) -Thales cost/schedule proposal currently undergoing Gov evaluation -Dual Contact / Drop Down Remarks proposal for a summer delivery -Remaining Requirements delivery proposal moved to late Fall -Combine remaining reqs with pending Build 7 proposal/estimate Thales to Scope Build 7 Requirements for Scope, Schedule Cost: -FAA options to select specific functionality based on schedule/cost consideration -Build Contract Acceptance and Delivery to FAA currently TBD 6

7 Federal Aviation Administration MEM/EWR Test NCP Status MEM Test NCPs: JW925-HNL-1004 / T34840 ZME HADDS Connection (EXTENSION) NAS CCB Approved – 5/2/2013 JW925-FDIO-1001 / T34501 MEM DTAP FDIO/PCRCU Echo Port Connection NCP Issuance Date - 8/25/2012 EWR Test NCPs: JW925-HNL-1003 / T34752 ZNY HADDS Connection NAS CCB Approved – 5/2/2013 JW925-FDIO-1002 / T34753 EWR DTAP FDIO/PCRCU Echo Port Connection NAS CCB Approved – 5/2/2013 JW925-ATCT-1002 / T34759 EWR DTAP Equipment Space ESA Approved – 3/4/2013 7

8 Federal Aviation Administration Questions ? KUSA