1-12-2015 Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.

Similar presentations


Presentation on theme: "1-12-2015 Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise."— Presentation transcript:

1 1-12-2015 Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise 1

2 Content  Organization  Current power system status  On-going Gas Turbine projects 2

3 Department of Hydropower Implementation Hydropower Generation Enterprise Myanma Electric Power Enterprise Yangon Electricity Supply Corporation Ministry of Electric Power (MOEP) STRATEGIC PLANNING, ORGANISING, LEADING & CONTROLLING Department of Electric Power Planning Mandalay Electricity Supply Corporation CONSTRUCTION FOR HYDRO & COAL POWER PLANTS GENERATION TRANSMISSION Electricity Supply Enterprise DISRIBUTION Mandalay Region ALL EXCEPT Yangon Region Current organization & responsibilities 3

4 Power System Structure 4

5 Power Market Structure 5

6 Department of Hydropower Implementation Electric Power Generation Enterprise Department of Electric Power Transmission & System Control Yangon Electricity Supply Corporation Ministry of Electric Power (MOEP) STRATEGIC PLANNING, ORGANISING, LEADING & CONTROLLING Department of Electric Power Planning Mandalay Electricity Supply Corporation CONSTRUCTION FOR HYDRO & COAL POWER PLANTS GENERATION TRANSMISSION Electricity Supply Enterprise DISRIBUTION Mandalay Region ALL EXCEPT Yangon Region Planned organization for April, 2016 6

7 19.11.2015 Existing Power System 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 Demand forecasting result in MW based on two scenarios (2014) 15

16 Planned generation – Option:1 (Gt & CCPP – Dec to Mar) ResourcePlant No of Machines Natural Gas Input Output InstalledPlannedMmscfdMw YatanarPublic199126258 YatanarIPP454356211 ZawtikaPublic742750 ZawtikaIPP262452.5170 InlandPublic31512 ShweIPP19918955241 Total299270321.5942 16

17 Planned generation – Option:1 (Gt & CCPP – Mar to Jun) ResourcePlant No of Machines Natural Gas Input Output InstalledPlannedMmscfdMw YatanarPublic199126258 YatanarIPP454356211 ZawtikaPublic71712 ZawtikaIPP302867.5280 InlandPublic31512 ShweIPP32730595414 Total431387356.51187 17

18 1Project Name Thilawa Gas Turbine Power Plant Project 2Location Thilawa Special Economic Zone, Thanlyin Township, Yangon Region 3Developer /AssistanceJICA Loan 4Installed Capacity50 MW (25 MW x 2 No ) 5 Estimated Commercial Operation Date Mid December 2016 18

19 1Project NameMyingyan Combined Cycle Power Plant 2LocationMyingyan, Mandalay Region 3Developer /AssistanceV Power 4Installed Capacity133 MW 5 Estimated Commercial Operation Date Mar 2016 19

20 1Project NameKyaukphyu Combined Cycle Power Plant 2LocationKyaukphyu Region, Rakhine State 3Developer /AssistanceV Power 4Installed Capacity49.92 MW 5 Estimated Commercial Operation Date April, 2016 20

21 1Project NameMyingyan Combined Cycle Power Plant 2LocationMyingyan, Mandalay Region 3Developer /AssistanceSemb Corp 4Installed Capacity GT( 71.5 MW×2 Nos.), STG (82 MW×1 No.) = 225 MW 5 Estimated Commercial Operation Date 2018 21

22 1Project NameThahton Combined Cycle Power Plant 2LocationThahton Gas Turbine, Mon State 3Developer /AssistanceWorld Bank 4Installed Capacity 119 MW 5 Estimated Commercial Operation Date 2018 22

23 1Project NameShwetaung Combined Cycle Power Plant 2LocationShwetaung, Bago Region 3Developer /AssistanceUnder Evaluation 4Installed CapacityTo be contracted between 64 ~ 74 MW 5 Estimated Commercial Operation Date N/A Alternative Plan Area (1.5 Acre) 11/66 kV Transformer and Switch Bay Existing Gas Yard 23

24 1Project NameThakata Combined Cycle Power Plant Project 2LocationThakata Gas Turbine, Yangon Region 3Developer /AssistanceUREC 4Installed CapacityGT( 75 MW), STG (31 MW) =106 MW 5 Estimated Commercial Operation Date Dec, 2016 24

25 Thank you for kind attention Power System Department, MEPE 25