Download presentation
Presentation is loading. Please wait.
Published byPhebe Morton Modified over 8 years ago
1
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: 2009-07-17 Authors:
2
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 2 Abstract This document has the WG11 presentation to the 802 EC for July Plenary -- Friday’s closing EC Meeting. Revision 2 was presented to the EC. Revision 3 captures the EC motion details.
3
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 3 IEEE 802.11 Closing EC Items Bruce Kraemer Chair, IEEE 802.11 Working Group Bkraemer@ieee.org Jon RosdahlAdrian Stephens IEEE 802.11 1 st Vice-ChairIEEE 802.11 2nd Vice-Chair jrosdahl@ieee.orgadrian.stephens@ieee.org
4
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 4 P802.11 Agenda Items P802.11w – Unconditional to RevCom P802.11n – Unconditional to RevCom P802.11z – Conditional to Sponsor Ballot P802.11p – Conditional to Sponsor Ballot P802.11v – Conditional to Sponsor Ballot P802.11u – Conditional to Sponsor Ballot Study Group Requests: –TVWS SG -- TV White Space Study Group –QoS Man SG -- QoS Management Study Group
5
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 5 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom
6
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 6 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Request the IEEE 802 Executive Committee to forward P802.11w D11.0 to RevCom. P802.11w had a 94% approval on the last Recirculation Sponsor Ballot. There are 6 disapprove voters representing 44 unsatisfied comments. –Working Group vote on the Motion Passed: 55 y, 0 n, 2 a Moved: Bruce Kraemer 2 nd : M. Lynch –14 Yes 0 No 0 Abstain
7
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 7 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Item 1 - Date the ballot closed: –IEEE P802.11w initial Sponsor ballot of D6.0 closed Sept 24, 2008 –4 th Sponsor Recirculation Ballot of D11.0 closed June 28, 2009 Item 2 - Vote tally:
8
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 8 IEEE P802.11w - Protected Management Frames Unconditional request to forward to RevCom Item 3 - Comments that support the remaining disapprove votes and WG responses: https://mentor.ieee.org/802.11/dcn/09/11-09-0795- 02-000w-p802-11w-report-to-the-ec.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0795- 02-000w-p802-11w-report-to-the-ec.ppt
9
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 9 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom
10
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 10 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Grant approval, to forward P802.11n Draft 11.0 to RevCom. P802.11n had a 91% approval on the last Recirculation Sponsor Ballot. There are 18 disapprove voters representing 80 unsatisfied comments. –Working Group vote on the Motion Passed: 53 y, 1 n, 6 a Moved: Bruce Kraemer 2 nd : James Gilb –14 Yes 0 No 0 Abstain
11
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 11 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Item 1 - Date the ballot closed: –IEEE P802.11n initial Sponsor ballot of D7.0 closed Jan. 10, 2009 –5 th Sponsor Recirculation Ballot of D11.0 closed July 3, 2009 Item 2 - Vote tally:
12
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 12 IEEE P802.11n – High Throughput Unconditional request to forward to RevCom Item 3 - Comments that support the remaining disapprove votes and WG responses : –https://mentor.ieee.org/802.11/dcn/09/11-09-0674-03- 000n-p802-11n-report-to-ec-for-approval-to-go-to- revcom.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0674-03- 000n-p802-11n-report-to-ec-for-approval-to-go-to- revcom.ppt
13
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 13 802.11z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot
14
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 14 802.11z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE 802.11z Working Group initial ballot on D3.0 closed 18 Dec 2008. –2 nd WG Recirculation Ballot on D5.0 closed 23 June 2009 Item 2 - Vote tally: Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstai n Approve Disappr ove %Appro ve 139 18 Dec 2008 Technical Letter Ballot for TGz draft 3.0 Initial25422589411815529 84 143 5 March 2009 First Recirculation Ballot for TGz draft 4.0 Recirculation25423091371617023 88 153 23 June 2009 Second Recirculation Ballot for TGz draft 5.0 Recirculation25423291341518315 92 153.1 17 July 2009 After ballot comment resolution 2542329135151898 96
15
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 15 802.11z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. –https://mentor.ieee.org/802.11/dcn/09/11-09-0879-02-000z- p802-11z-report-to-ec-on-conditional-approval-to-go-to- sponsor-ballot.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0879-02-000z- p802-11z-report-to-ec-on-conditional-approval-to-go-to- sponsor-ballot.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. Third recirculation 24-Jul-09 Interim Meeting 20-Sep-09 Clean recirculation25-Sep-09 Start of Sponsor Ballot19-Oct-09
16
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 16 802.11z Tunneled Direct Link Setup (TDLS) Conditional to Sponsor ballot Grant conditional approval, under Clause 13, to forward P802.11z to Sponsor Ballot. P802.11z currently has a 96% approval. There are 8 disapprove voters representing 8 unsatisfied comments. (3 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 52 y, 0 n, 3 a Moved: B. Kraemer 2 nd : David Law –12 Yes 0 No 0 Abstain
17
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 17 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot
18
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 18 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE P802.11p Working Group initial ballot on D4.0 closed 3 May 2008 –3 rd Recirculation ballot on D7.0 closed 13 Jun 2009 Item 2 - Vote tally: Ballo tID Ballot Close Date TitleBallotTypePool Retu rn %Ret urn Abst ain %Ab stain Appr ove Dis ap pro ve %Appr ove 125May 03 2008Recirculation Letter Ballot for IEEE 802.11p_D4.0 Initial23420587.63215.61363778.61 141Dec 05, 2008Recirculation Letter Ballot for IEEE 802.11p_D5.0 Recirculation23221090.53516.71492685.1 144Mar 31, 200Recirculation Letter Ballot for IEEE 802.11p_D6.0 Recirculation23221191.02913.71612088.95 151Jun 13, 2009Recirculation Letter Ballot for IEEE 802.11p_D7.0 Recirculation 232211912612.31582785.41
19
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 19 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. https://mentor.ieee.org/802.11/dcn/09/11-09-0871- 03-000p-tgp-request-for-conditional-sponsor- ballot-approval.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0871- 03-000p-tgp-request-for-conditional-sponsor- ballot-approval.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. –Fourth Recirculation28 Jul 2009 –Teleconferences scheduled for every Thursday starting 13 Aug, 2009 –Interim Meeting20 Sep 2009 –Clean Recirculation02 Oct 2009 –First Sponsor Ballot30 Oct 2009
20
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 20 P802.11p Wireless Access in Vehicle Environments (WAVE) Conditional to Sponsor ballot Grant conditional approval, under Clause 13 to forward P802.11p to Sponsor Ballot. P802.11p had a 85.41% approval on the last WG Recirculation Ballot. There are 27 disapprove voters representing 167 unsatisfied comments. (4 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 44 y, 0 n, 6 a Moved: Bruce Kraemer 2 nd : Tony Jeffree –14 Yes 0 No 0 Abstain
21
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 21 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot
22
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 22 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot Item 1 - Date the ballot closed: –IEEE 802.11v Working Group initial ballot on D4.0 closed 19 Dec 2008 –2 nd Working Group Recirculation Ballot on D6.0 closed 12 Jun 2009 Item 2 - Vote tally: Ballot ID Ballot Close Date TitleBallot TypePoolReturn%ReturnAbstain % Abstain Appro ve Disap prove %Approv e 14019 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Initial25422588.584017.781493680.54 1464 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation25422889.764117.981553282.88 15012 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 Recirculation25423090.553816.101722089.58 150.115Jul 09Second Recirculation Ballot for Draft 6.0 Post ballot results Recirculation25423090.553816.101741890.6
23
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 23 IEEE P802.11v – Wireless Network Management Conditional to Sponsor ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. https://mentor.ieee.org/802.11/dcn/09/11-09-0720-02-000v-tgv-sponsor- ballot-request-presentation.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0720-02-000v-tgv-sponsor- ballot-request-presentation.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. –Third recirculation 24-Jul-09 –3 Teleconferences scheduled: 14 Aug, 1 Sept and 15 Sept. 2009 –Interim Meeting20-Sep-09 –Clean recirculation 25-Sep-09 –First sponsor ballot19-Oct-09
24
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 24 IEEE P802.11v Wireless Management Conditional to Sponsor ballot Grant conditional approval, under Clause 13 to forward P802.11v to Sponsor Ballot. P802.11v had a 89.58% approval on the last WG Recirculation Ballot. There are 18 disapprove voters representing 40 unsatisfied comments. (4 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 58 y, 0 n, 2 a Moved: Bruce Kraemer 2 nd : David Law –14 Yes 0 No 0 Abstain
25
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 25 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot
26
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 26 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Item 1 - Date the ballot closed: –IEEE 802.11u Working Group initial ballot on D3.0 closed 12 July 2008 –4th Working Group Recirculation Ballot on D7.0 closed 19 Jun 2009 Item 2 - Vote tally: ID Ballot Close Date TitleBallotTypePoolReturn%Rtn Abstai n %AbsApprove Disa ppr ove %Approve 13212 July 2008 802.11u_D3.0Initial21318285.53519.21133476.9 13708 October 2008 802.11u_D4.01 st Recirculation 21318988.73719.61183477.6 14220 February 2009 802.11u_D5.02 nd Recirculation 21319189.73920.41252782.2 14824 April 2009 802.11u_D6.03 rd Recirculation 21319290.13518.21421590.4 15219 June 2009 802.11u_D7.04 th Recirculation 21319491.03317.01421988.2 152. 1 LB152 Post Ballot vote changes 21319491.03317.01461590.7
27
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 27 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Item 3 - Comments that support the remaining disapprove votes and WG responses. –https://mentor.ieee.org/802.11/dcn/09/11-09-0715-06-000u-tgu-report-to-ec.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0715-06-000u-tgu-report-to-ec.ppt Item 4 - Schedule for recirculation ballot and resolution meeting. –Third recirculation 26-Jul-09 –Teleconferences scheduled for Wed and Fri starting 19-Aug-09 –Interim Meeting20-Sep-09 –Clean recirculation 28-Sep-09 –First sponsor ballot21-Oct-09
28
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 28 IEEE P802.11u Internetworking with External Networks Conditional to Sponsor Ballot Grant conditional approval, under Clause 13, to forward P802.11u to Sponsor Ballot. P802.11u currently has a 91% approval. There are 15 disapprove voters representing 121 unsatisfied comments. (3 of the disapprove voters have no unsatisfied comments) –Working Group 11 vote on the Motion Passed: 49 y - 0 n – 1 a Moved: B. Kraemer 2 nd : J. Gilb 14 Yes 0 No 0 Abstain
29
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 29 802.11 WG Requests for Study Groups TVWS SG – TV White Space Study Group QoS MAN SG – QoS Management Study Group
30
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 30 Motion to create TVWS SG – TV White Space Study Group Moved: Because of its suitability as a primary candidate for a TVWS technology, and in the expectation that the FCC and Ofcom will clarify their requirements for the database in the interim, the 802.11WG should begin a Study Group to develop PAR and 5 Criteria documents for approval by the EC at the Atlanta Plenary in November 2009. –WNG Results: Rich Kennedy 2 nd : Harry Worstell – 39y - 0n - 15a –WG11 results: TK Tan on behalf of WNG, 2 nd : P. Ecclesine - 77y, 0n, 8a –Ref: https://mentor.ieee.org/802.11/dcn/09/11-09-0749-03-0wng-802-11-in-the-tvws.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0749-03-0wng-802-11-in-the-tvws.ppt Moved: B. Kraemer 2 nd : M. Lynch –14 Yes 0 No 0 Abstain
31
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 31 July 2009 McCann et al. (RIM)Slide 31 Summary QoS Man SG – QoS Management Study Group With the Action Management frames defined in TGk and subsequent amendments, there is an increasing amount of Action Management traffic, which could lead to contention issues with Voice and Video QoS streams. The proposed SG will create a PAR and 5 criteria to address QoS issues with Management frames. The WNG presentation was given in document 11-09/817r1.
32
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 32 July 2009 McCann et al. (RIM)Slide 32 Motion to Create QoS Man SG – QoS Management Study Group Request approval by IEEE 802 LMSC to form an 802.11 Study Group to Address QoS for Management Frames [as described in doc 11-09/0817r1] with the intent of creating a PAR and five criteria.11-09/0817r1 –WNG Results: By: Michael Montemurro; 2 nd : Cam-Winget – 34y -3n -14a –WG11 results: by TK Tan; 2 nd Richard Kennedy - 39y -2n -20a Moved: B. Kraemer 2 nd : T. Jeffree 13 Yes 0 No 0 Abstain
33
doc.: IEEE 802.11-09/0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 33 References WG Reports: TGw: https://mentor.ieee.org/802.11/dcn/09/11-09-0795-02-000w-p802-11w- report-to-the-ec.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0795-02-000w-p802-11w- report-to-the-ec.ppt TGn: https://mentor.ieee.org/802.11/dcn/09/11-09-0674-03-000n-p802-11n-report- to-ec-for-approval-to-go-to-revcom.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0674-03-000n-p802-11n-report- to-ec-for-approval-to-go-to-revcom.ppt TGz: https://mentor.ieee.org/802.11/dcn/09/11-09-0879-02-000z-p802-11z-report- to-ec-on-conditional-approval-to-go-to-sponsor-ballot.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0879-02-000z-p802-11z-report- to-ec-on-conditional-approval-to-go-to-sponsor-ballot.ppt TGp: https://mentor.ieee.org/802.11/dcn/09/11-09-0871-03-000p-tgp-request-for- conditional-sponsor-ballot-approval.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0871-03-000p-tgp-request-for- conditional-sponsor-ballot-approval.ppt TGv: https://mentor.ieee.org/802.11/dcn/09/11-09-0720-02-000v-tgv-sponsor- ballot-request-presentation.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0720-02-000v-tgv-sponsor- ballot-request-presentation.ppt TGu: https://mentor.ieee.org/802.11/dcn/09/11-09-0715-06-000u-tgu-report-to-ec.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0715-06-000u-tgu-report-to-ec.ppt Study Group Links: QoS Man SG: https://mentor.ieee.org/802.11/dcn/09/11-09-0817-01-0wng-qos-support-in- managment-frames.ppt https://mentor.ieee.org/802.11/dcn/09/11-09-0817-01-0wng-qos-support-in- managment-frames.ppt TVWS SG: https://mentor.ieee.org/802.11/dcn/09/11-09-0749-03-0wng-802-11-in-the- tvws.ppthttps://mentor.ieee.org/802.11/dcn/09/11-09-0749-03-0wng-802-11-in-the- tvws.ppt
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.