Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between tasks. Critical Path (CP) – the sequence of tasks (path) whose extending Would postpone the project deadline. CP is the longest path. Slack = time for which a task or path can be extended without Postponing the project deadline. * Project Evaluation and Review Technique
2
Estimating Task Time O = optimistic time P = pessimistic time R = realistic time
3
PERT Chart (Network Diagram)
4
Critical Tasks/Paths, Slack Slack
5
Skills Needed: Draw Gantt & PERT with MS Project Draw PERT manually based on requirements Calculate Task Time (“expected time”) Figure out Critical Path and slack (simpler questions)