1 Final Team Project ITIS 3110 Lab 6

2 Final Team Project Schedule
End of Lab 6: Self-select teams 3-5 members Prefer 4 per team Team name selection Work on defining project Rough scope and schedule Turn in Team Name Form One per team Team Name Rough project idea Signatures Captain only: upload form to Moodle Moodle (everyone) Start of Lab 7 Turn in project proposal form One per team Project Name Final Project Definition Final Project Schedule Signatures Captain only: upload form to Moodle Moodle (everyone)

3 Project Basics Implement a small IT Infrastructure
Include at least 4 IT items from 2110/3110 lecture or labs Two may be from 2110 Two must be from 3110 Must have one new concept Something not done in a lab E.g. VNC if done in a sophisticated manner Must be security oriented Should be the equivalent of 3-4 labs of work Will be demonstrated at Lab 14

4 Project ideas Wireless over long distance (> ¼ mile)
Send a secure video transmission Use Kerberos and LDAP to implement another service other than one done in class Use Cisco 5505 security appliance Implement a Monitoring/IDS/IPS tool and demonstrate Implement an effective SNMP environment Do some active monitoring/management Anything non-trivial (discuss with instructor)

5 Project Grade 3110Project.htm 100 pts 60 pts 40 pts
Final Project Criteria Project report grade Everyone gets this grade 40 pts Peer evaluation 4 areas for 0-10pts

6 Attended Group Meetings Assumed Reasonable load
3110 Team Evaluations Team name: _____________________________ Sec L0__ Team # __ Your Name: ________________ Attended Group Meetings (0-10) Assumed Reasonable load Delivered on time Group Contribution Teammate: _________ Only one 10 may be given for each category. Give a 10 (if deserved) to the major Contributor in that category Attended Group Meetings Attended scheduled group meetings Gave previous notice if could not attend Assumed Reasonable Load All work does not need to be equal Delivered on Time Met commitments Gave early warning and reasons (not excuses) if not able Group Contribution Overall contribution Filled a valuable role for the team Good leader, documenter, tester, etc. Criteria 10 – Excellent (only one per category) 9 – Major contributions 8 – Consistent contributor 7 – Did the job 6 – Barely met assignment 5 – Missed major deadlines/tasks 4 – Major problems 3 – Barely there 2 – Got something in eventually 1 – Breathed 0 - Absolutely no contribution

7 Team Evaluations Confidential between submitter and me
Optional comments For ratings of 6 or lower: Explanation of why Not: Fred was always late for meetings Fred never did anything Good: The group had 3 meetings planned: 11/22, 11/30, and 12/4. Fred missed the 11/22 and 12/4 meeting without informing the group Fred's main task was to test the xyz module with test cases 1 through 15. The group did not get the data by the target date.

8 Teamwork Choose a captain Exchange
Telephone #s IDs Some method to reliably communicate Select several commonly available works times Develop a schedule Modify as needed Establish communication protocol How/when to contact Consider a Collaboration tool Wiki? Google collaboration tools?

9 Deliverables End of Lab 6 This will be time checked!
One project team name form (printed) – 1 per team Use proper form with: Team name Rough project idea Identify elements to be implemented Security implemented This can change for the proposal due on next lab Signatures Everyone in Moodle Must match the above Team Name The above done properly will get Lab 6 first credit (10 pts) Team Captains Upload a copy of form with names typed in to Moodle Bonus point for completing properly If there is a major problem I see I will discuss with captain This will be time checked!

10 Deliverables Beginning of Lab 7 Team captains
Complete project proposal – 1 per team Use proper form Project Name Add to the proposal form Complete proposal and schedule Clearly identify elements to be included in project Identify security to be implemented Signatures Project name in Moodle (all) 10 pts for completing the from correctly filled and correct name in Moodle Team captains Upload proposal to Moodle The latest completed proposal Team names typed in bonus point for captain I will review during lab and discuss as appropriate with team captain

11 Overview Team name due today Team proposal due next lab
Signatures on form and team name in Moodle High level description of project This may change for the project proposal Team proposal due next lab Signatures on form and project name in Moodle Detailed description of project Deliverables 4 old elements and the new element Checkpoint dates Project should consist of: Four integrated IT items learned in lab/class Two may be from 2110 One new element not covered by a lab Security aspect Captains: Upload a copy of the two forms to Moodle

12 Last Notes: Anyone not present at this lab
Will not get credit for the first 10 point part (no signature) It will be their responsibility to contact your group to catch up It will be their responsibility to get their signature on the next form (Project Proposal) Teams and members will be listed on the Project Web Page. No sheet protectors for 3 ring binders

13 Start Gather as teams Identify who is not on a team Assimilate!


Download ppt "Final Team Project ITIS 3110 Lab 6."

Similar presentations


Ads by Google