Mandatory steps to be performed by the admin before efiling a petition  New Project / Generation Station should be added before filing TT / GT type applications.

Similar presentations


Presentation on theme: "Mandatory steps to be performed by the admin before efiling a petition  New Project / Generation Station should be added before filing TT / GT type applications."— Presentation transcript:

1

2 Mandatory steps to be performed by the admin before efiling a petition  New Project / Generation Station should be added before filing TT / GT type applications.  New Assets / Units should be added before filing TT / GT type applications.  Respondent mapping should be done before filing petition.

3

4 Login to the system using the credentials provided

5 Adding new project/generation stations Click to open Project / Generation Station.

6 Click to add new Project / Generation Station. Click to delete record.

7 On clicking on add project Select Region. Select type. After filling the fields click on save button.

8 Delete a project from the list Click on Delete

9

10 Adding New Asset/Unit

11 Click on Add Asset/Units Click to add new Asset / Unit. Click to delete Asset.

12 Fill in the details asked Click on save button once the details are filled in.

13

14

15 Click to map respondents Click to delete mapped respondents.

16 Click to select respondent to be mapped. Click on save button once all the required respondents are mapped

17

18 Click to open UTR list.

19 Click to add new UTR.

20 Click on save button after filling the details.

21 Click to print the receipt of UTR added.

22

23 Click on E-File(new)

24 After reading the instructions click on proceed.

25 Fill in all the general information

26 Add Respondent details related to this petition Click on the add respondent link and then select the respondents that needs to be added for the particular petition.

27 To add court details Click to edit court details. Click to add new court details. Click to delete court details.

28 Add new court details

29 Related Petition Click to add new Related Petition.

30 Adding related petitions Click on search after filling the petition type, number, year

31 To save the related petitions

32 Identical Petition Click to add new Identical Petition.

33 Searching identical petition

34 Saving the identical petition Click save button to add the identical petition.

35 Adding Prayer Click to add new Prayer. Click to edit Prayer. Click to delete prayer.

36 Click save to add a prayer

37 Adding Attachments Click to add new document. Click to open document. Click to delete document.

38 FEES

39 Click to add units.

40

41

42 Added Units. Click to delete unit.

43 Checklist

44 Summary Click on file petition to submit the petition

45


Download ppt "Mandatory steps to be performed by the admin before efiling a petition  New Project / Generation Station should be added before filing TT / GT type applications."