Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: 866-541-6330 #7064930
2
Status 2 Telecon Operational Status Interface Documents, Meetings, Deliveries CTM Delivery to LM (8/10/12 ) Development Real-time checkout of SWIA on ETU Science Data Collection Timing offset by 2 seconds (deferred) Real-time checkout of SWEA on ETU Developed displays for SWEA Loaded EEPROM with LUT and RTS LUT load testing Science Data collection Collection Timing Real-time checkout of STATIC on ETU Developed displays for SWEA HV Ramps Slow HSK specification and development Loaded EEPROM with LUT and RTS LUT load testing Science Data collection (for EMC: Mass Hist and Rates packets only) Collection Timing Changed Actuator Polling (to suppress noise in SEP detector) Testing SSR Flash Recording/playback of Science Data (in progress) Next Up STATIC Science Data Packet verification SSR Flash Recording/Playback Operational code load leveling *** on ETU *** (DVF does NOT make enough messages) Maximum telemetry rate operations ISSUES Instrument teams are ignoring rules about command and telemetry rates Instrument teams are ignoring the LUTs and loading their memories directly Instruments Are Overloading the CPU with messages, Unlike Instrument Simulator
3
Status 3 Telecon SPRs and SCRs
4
Status 4 Telecon Charts CHARTS
5
Status 5 Telecon Op SLOC
6
Status 6 Telecon Module Status Chart
7
Status 7 Telecon Metrics Chart
8
Status 8 Telecon Margin Chart EEPROM size has been recalculated for April-May-June
9
Status 9 Telecon Margin Chart
10
Status 10 Telecon Defect Chart