Presentation is loading. Please wait.

Presentation is loading. Please wait.

Refrigerator Decommissioning: Next Steps for Measure Update March 18th, 2014 1.

Similar presentations


Presentation on theme: "Refrigerator Decommissioning: Next Steps for Measure Update March 18th, 2014 1."— Presentation transcript:

1 Refrigerator Decommissioning: Next Steps for Measure Update March 18th, 2014 1

2 Measure Update Research Priorities Staff, with subcommittee feedback, is researching if secondary market effects can be estimated using existing data. Staff to assess compliance with guidelines as a UES measure. Staff, with subcommittee feedback, will update measure parameters as necessary using latest research. 2

3 Proposed Timeline (Communicated to Subcommittee): March 14th - Subcommittee reconvenes to understand existing sources of data. Recommend path forward (Staff makes all necessary revisions to the measure) Mid April - Subcommittee meets to review results of staff work. (Further subcommittee meetings on an as-needed basis. The subcommittee may also meet between March and April if required or if there is no need to wait further. May RTF meeting: Presentation to the RTF; aim to get an RTF decision. June RTF meeting (If Required): Second presentation to the RTF if necessary. 3

4 New Refrigerator Decommissioning Studies Considered: 4 ReportStateEvaluatorYear PacificPower: See Ya Later, Refrigerator Evaluation Report IdahoCadmus2011-12 PacificPower: See Ya Later, Refrigerator Evaluation Report WashingtonCadmus2011-12 ARPs are RAD: How to Incorporate Environmental Benefits from Appliance Recycling Programs into Cost-Effectiveness Calculations California IEPEC Paper (Cadmus) 2013 Appliance Recycling Program Process Evaluation and Market Characterization CaliforniaSCE & PGE2013 Appliance Recycling Program Retailer Trial Final Report CaliforniaInnovologie2013 PSE Refrigerator DecommissioningWashingtonKEMA2013

5 March 14 th Subcommittee Meeting Update and Next Steps Subcommittee agrees with staff proposed process to update the measure. The next subcommittee meeting will primarily focus on determining the “brother-in-law” factor. Staff to prepare a proposal for this factor in advance of the meeting. Other measure parameters will be updated using similar methodology, latest regional datasets. 5


Download ppt "Refrigerator Decommissioning: Next Steps for Measure Update March 18th, 2014 1."

Similar presentations


Ads by Google