1 Joint localisation approach for projects Skif 2ES5 & Olymp EP20
TRANSPORT |  Joint localisation approach for projects Skif 2ES5 & Olymp EP20 Moscow – Jan Harder

2 Overall strategic approach:
Localisation of all stages of the life cycle Product Development 50/50 Alstom/TMH JV TRTrans Sourcing TMH sourcing team Alstom central team Alstom CIS team Manufacturing 50/50 JV Alstom/TMH RailComp Maintenance TCC Alstom is searching for a synergy effect from cooperation with local partners

3 Strategic focus and outlook: Products to be localized
Projects in realization Olymp EP20 Passenger Locomotive for RZD Skif 2ES5 Freight Locomotive for RZD KZ8A Freight Locomotive for KTZ KZ4AT Passenger Locomotive for KTZ 2ES5 EP20 Potential localisation projects: KZ8 Other locomotives EMU / DMU Tramways Metro cars Signalling solutions KZ4AT ED10 Local but centralised sourcing for similar projects to get volume effect

4 Localization of Traction components
EP 20 Olymp 2ES5 Skif

5 Production Start Schedule
Joint approach of Alstom and TMH for localization of traction components RAILCOMP – 50/50 JV of TMH and Alstom for production of traction components E-Block E-Block Low Voltage Traction motor Production Start Schedule Component EP20 2ES5 E Block Auxiliary converter HV LV High Voltage Agate

6 Status of localization
RAILCOMP – local sourcing Non-localized Pumps 2,76% GMV 3,04% Heats 0,63% Pipings 0,51% Capacitors 7,52% Resistors 1,94% Transformers 0,66% Coolings 1,62% First localized component: Looming (Cable harnessing) Localized in Russia Looms 6,84% Frames (HV) 0,85% Frame (LV) 0,05% Frames (CVS) 0,94% Frames (MB) 5,90% Coppers bars 3,88% Main transformer 49,57% Not yet localized MB auxiliary parts 8,74% HV auxiliary parts 1,28% CVS auxiliary parts 2,01% LV auxiliary parts 1,26%

7 Localization and development strategy
RAILCOMP – Ramp up & development planning Step 3: Serial production meeting the required localization level and preparing production for growth serving other projects beyond locomotives Step 2: Ramp up of the components production with growing localization up to 40% Step 1: Creation of RailComp and administrative process, production facility First product FAI Personnel grow up to 200 persons in 2020

8 Site on the compound of TMH Novocherkassk plant
Railcomp - Novotcherkassk production site Site on the compound of TMH Novocherkassk plant Total area: ~5.000 m2 (incl. offices / lockers) In 2018 more than m2 production area will be required Investment into new lean manufacturing site in total more than 10’0 Mio. EUR In total in RailComp approx. 200 FTEs will be locally contributing to the locomotive projects