Presentation is loading. Please wait.

Presentation is loading. Please wait.

Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering.

Similar presentations


Presentation on theme: "Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering."— Presentation transcript:

1

2 Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering breakdowns, repairs, events and other occurences, expandable to user specifications Analysis of labour time and spare parts for all occurences, optional overview according to requirement and usage Booking terminal for shop, measures, warehouse and inventory management Failure recording and fault analysis, error code system Manual and automatic error message system with central management and qualification Quality management for process-relevant plants and recording of environmental parameters MS Office© interface for output of data in Excel© or Word© Facility and location management, user-specific property and order types and much more…

3 Displaying properties in the “structural view”

4 Displaying properties in the “list view”

5 Displaying properties in the “symbol view”

6 Viewing the properties with the “Graphic Navigator”

7 Maintenance with automatic appointment- and event-driven triggering and printout  Assign maintenance per Drag & Drop

8 Human resources planning  Overview of all unplanned tasks  Overview of all allocated measures  Tasks can be distributed over several days and people

9 Human resources planning – Weekly tasks  Overview of all tasks assigned to a Person

10 Human resources planning – printout of weekly tasks  Plan of weekly tasks incl. bar codes for simplified reporting

11 Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Overview of all open measures

12 Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Distribution and development of personnel costs by task groups and types, absolute or in percentages

13 Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Distribution and development of down times by task groups and types, machine groups and cost centres, absolute or in percentages

14 Up-to-date codes at all times – determine the interval, AWa2000 always displays all important issues up-to-date:  Top ten list of properties: the highest personnel costs, the most down times, the most tasks, by task groups, types and total

15 Covering breakdowns, repairs, events and other occurences, expandable to user specifications

16 Analysis of labour time and spare parts for all occurences, optional overview according to requirement and usage  Cost centre analysis  Labour time overview  Spare part analysis  Task and event analysis

17 Shop booking terminal Touchscreen operation

18 Warehouse management booking terminal Touchscreen operation

19 Inventory management booking terminal Touchscreen operation

20 Measures booking terminal Touchscreen operation

21 Stock list with eCl@ss classification

22 Failure recording and fault analysis, error code system  Properties groups statistic

23 Failure recording and fault analysis, error code system  Statistik Objekte

24 Failure recording and fault analysis, error code system  Error codes MTBF, MTTR, RZ, etc.

25 Failure recording and fault analysis, error code system  Time spent due to errors

26 Distribution of errors by properties, sorted by ranking

27 Top Ten analysis by frequencey per error code

28 SMM Error reporting module: manual and automatic error message system with central management and qualification

29 Quality management for process-relevant plants and recording of environmental parameters  Monitoring process-relevant occurances on properties  Automatic triggering of QA orders when intervening in a process  Recording release of processes or automatic triggering of follow-up orders in the case of reworking  Recording codes of the environmental relevance of properties  Overview of all environment-relevant properties

30 Exporting data: MS Office© interface for output of data in Excel© or Word©

31 Importing data: transferring user-defined structures from Excel©

32 Facility and location management, user-specific property and order types  Organise your properties by region, branch and plants

33 Facility and location management, user-specific property and order types  Structure your properties by location and property group

34 Facility and location management, user-specific property and order types (Facility Management)  Manage properties and premises units

35  Defining visualisation user-interfaces with corresponding switch options SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)

36 SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  Disaplaying readings in diagrams

37 SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  User interface with switch options

38 SPS+ data link of the SPS control to the computer network and AWa2000 (Maintenance measures by meter reading and error messages)  Alarm overview for monitoring controls and connections

39 Document interfaces Integrating user-specific documents as a shortcut or copy Documents on:  Properties (plants, machines, equipment)  Inspections / Maintenance  Failures / Repairs  Events  Addresses (suppliers, manufacturers, etc.)  Spare parts

40 Maintenance plan with status and time due for of all appointments in the system

41 Inspection plan of a property structure with all open measures and direct editing options

42 Event report of all measures occuring in a unit of time (shift, day, week, month, any)

43 Personnel report of all measures processed in a unit of time (shift, day, week, month, any)

44 Overview of all planned, actual and unanticipated costs (budget comparison)

45 Mobile data logging PDAs with Windows Mobile 2003 Distributed logging: Reports Human resources Material resources Failures / Errors

46 List output in various formats using the Report Generator  HTML  PDF  Bitmap  JPEG  RTF  XML  TIFF

47 Human resource planning instrument Assign tasks per Drag & Drop Overview of weekly tasks

48 Occupational safety and the environment  Hazardous substances  Risk analyses  Risk evaluation  Operating instructions

49 Occupational safety and the environment  Support by identification guides

50 Occupational safety and the environment  Create and manage operating instructions

51 Occupational safety and the environment  Create and manage risk evaluations

52 An overview of references


Download ppt "Free-range views of the properties based on various criteria Maintenance with automatic appointment- and event-driven triggering and printout Covering."

Similar presentations


Ads by Google