Fall 2003 1 CS-EE 480Team Pit Roach University of Portland School of Engineering 11-18-03 November Program Review Team Pit Roach B 2 Logic to L-Edit Translator.

Similar presentations


Presentation on theme: "Fall 2003 1 CS-EE 480Team Pit Roach University of Portland School of Engineering 11-18-03 November Program Review Team Pit Roach B 2 Logic to L-Edit Translator."— Presentation transcript:

1 Fall 2003 1 CS-EE 480Team Pit Roach University of Portland School of Engineering 11-18-03 November Program Review Team Pit Roach B 2 Logic to L-Edit Translator (BLT) Team Zach Heath John Chezem Daman Oberoi Advisors Dr. Peter Osterberg Dr. Aziz Inan Industry Representative Mr. Dave Dunning, Intel

2 Fall 2003 2 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Overview Refresher Accomplishments Milestones December/January Plans Current Project Concerns Conclusion

3 Fall 2003 3 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Refresher BLT B 2 Logic to L-Edit Translator Rev 1.0 Functional Specifications Completed Rev 1.0 Project Plan Completed on Schedule Web page up and running Functional Block Diagram

4 Fall 2003 4 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Accomplishments Completed Initial Testing –24 Hour BLT.tpr file checked and validated –12 Random Circuits Debugged, Translated, Tested, and Validated. Project Plan 1.0 Approval Gained Errors in BLT Syntax Found and Corrected

5 Fall 2003 5 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Milestones

6 Fall 2003 6 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Plans for December Design Checklist and Release –Design release meeting with Ind. Rep Go Home to Celebrate Christmas and New Years

7 Fall 2003 7 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering January Plans Program Review #4 Website Maintenance Theory of Operations Document 0.9

8 Fall 2003 8 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Current Project Concerns Faulty CMOS chips

9 Fall 2003 9 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Conclusion Accomplishments December/January Plans Current Project Concerns

10 Fall 2003 10 CS-EE 480Team Pit Roach 11-18-03 University of Portland School of Engineering Questions? Check out our website at: (You’ll love our fish!) http://lewis.up.edu/egr/SRDesign04/pitroach/


Download ppt "Fall 2003 1 CS-EE 480Team Pit Roach University of Portland School of Engineering 11-18-03 November Program Review Team Pit Roach B 2 Logic to L-Edit Translator."