Presentation is loading. Please wait.

Presentation is loading. Please wait.

The MASH funding timeline 20022012201320141999200720092010 School liaison initiatives; Faculty of Science funding Department maths drop-in; Institutional.

Similar presentations


Presentation on theme: "The MASH funding timeline 20022012201320141999200720092010 School liaison initiatives; Faculty of Science funding Department maths drop-in; Institutional."— Presentation transcript:

1 The MASH funding timeline 20022012201320141999200720092010 School liaison initiatives; Faculty of Science funding Department maths drop-in; Institutional funding MASH; sigma (HEFCE) funding MASH; continued institutional funding HESTEM funding initiatives Enhanced staffing requests Full, permanent staffing agreed

2 The MASH staffing timeline 200720082009201020112012201320142015 Directorpilot0.1 0.2 Centre Co- ordinator 0.6 T.T. = 0.4 fte 0.6 T.T. 0.79 Develop ment officer 0.5 Fixed term 0.5 Fixed term 0.6 Fixed term 0.8 Stats advisory tutor Hourly paid 0.5 Outreach tutor 0.6 Operating budget: £7K per annum T.T. = term time only Paid student positions Peer tutors (funded by Dept Math Sci) Website maintenance & development Summer interns

3 Students’ Union Academic departments Professional services Identify & develop key collaborations

4 Identify & develop your USP Mathematics Accessibility Pre- and post- entry Mathematics support for vocational qualification entry students

5 Take opportunities Exploit talent Maintain coherence Vision Determination Patience Develop institution-wide engagement Be knowledgeable


Download ppt "The MASH funding timeline 20022012201320141999200720092010 School liaison initiatives; Faculty of Science funding Department maths drop-in; Institutional."

Similar presentations


Ads by Google