Presentation is loading. Please wait.

Presentation is loading. Please wait.

Alton Village School Boundary Review Interim Report 1.

Similar presentations


Presentation on theme: "Alton Village School Boundary Review Interim Report 1."— Presentation transcript:

1 Alton Village School Boundary Review Interim Report 1

2 New School Due to the growth in the Alton neighbourhood the Ministry of Education has approved a new ALTON VILLAGE School to be built north of Dundas Street. 2

3 Alton Village Community 3

4 Agenda Schools Affected Boundary Committee Committee Mandate & Process Boundary Criteria Interim Options Next Steps Questions 4

5 St. Elizabeth Seton 5 St. Christopher Schools Affected The opening of this new school will impact the current enrolment at St. Christopher and St. Elizabeth Seton Schools

6 School Boundary Review Committee (SBRC) 6 St. Elizabeth Seton Mary Blonde Courtney Rainville Margaret Lavallee – Alton Village Diana Rodin – Alton Village Halton Catholic District School Board Lorrie Naar – Superintendent of Education Giacomo Corbacio – Superintendent of Facilities Scott Bland – Administrator of Planning Services St. Christopher John Karcz Wendy Vallesi

7 SBRC Committee Two parent representatives from each school community The committee represents the interests of all involved parties – the students, families and staff Principals and other Board staff are not involved in this process The Committee is an Advisory Committee only 7

8 Committee Mandate & Process To develop new boundary options for St. Christopher, St. Elizabeth Seton and the new Alton Village Catholic Elementary Schools To assess boundary options based on the Halton Catholic District School Board criteria for school boundary adjustments 8

9 Committee Mandate & Process To provide interim options to the community for review and feedback To review community input & provide a final recommendation(s) to the Board 9

10 Criteria Optimizing schools within enrolment capacities Minimizing use of portable classrooms Minimize future boundary adjustments Optimize cost-effective school transportation Optimize school enrolment to ensure cost-effective program delivery Consideration of Catholic Parish boundaries to extent possible 10

11 Interim Options Current Boundaries Option 1 Option 2 Option 3 11

12 12

13 Current Boundary - Enrolment SCHOOL Building Capacity (FDK) Max # of Portables Capacity with Portables2011 Current 2011 Portables St. Christopher 483127536528 St. Elizabeth Seton 460127307069 TOTAL 943241483135817 13 Over CapacityBeyond Capacity SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher 67896961070911700107071067796638658864076377 St. Elizabeth Seton 75814790158511887219904209562396023969239602396723 TOTAL 143623148625156029157229161130163332162331162731160030160430 Below CapacityAt Capacity

14 14

15 Option 1 - Enrolment 15 Over CapacityBeyond Capacity At Capacity Below Capacity SCHOOL Building Capacity (FDK) Max # of Portables Capacity with Portables2011 Current 2011 Portables St. Christopher 483127536528 St. Elizabeth Seton 460127307069 Alton 6121288200 TOTAL 1555362365135817 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher 515250925062488148204620453447435-2433-2 St. Elizabeth Seton 5163530454045354541451835002485246314691 Alton 405-9447-7514-4549-25886532670369557024 4 Total 1436-414861560215723161131633516234162751600316043

16 16

17 Option 2 - Enrolment 17 Over Capacity Beyond Capacity At Capacity Below Capacity SCHOOL Building Capacity (FDK) Max # of Portables Capacity with Portables2011 Current 2011 Portables St. Christopher 483127536528 St. Elizabeth Seton 460127307069 Alton 6121288200 TOTAL 1555362365135817 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher 495148514790458449425-2416-2408-3 396-3394-3 St. Elizabeth Seton 53645545567556555746555553745243 50225083 Alton 405-9447-7514-4549-2588653267036954 7024 4 Total 1436-41486156011572216114163351623516274 1600316044

18 18

19 Option 3 - Enrolment 19 SCHOOL Building Capacity (FDK) Max # of Portables Capacity with Portables2011 Current 2011 Portables St. Christopher 483127536528 St. Elizabeth Seton 460127307069 Alton 6121288200 TOTAL 1555362365135817 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher 4690452438-2414-3406-3378-4362-5358-5353-5352-5 St. Elizabeth Seton 5625587660876097617760275916574654545504 Alton 405-9447-7514-4549-25886532670369547024 4 Total 1436-41486-21560115722161131633516234162751600316043 Below CapacityAt CapacityOver CapacityBeyond Capacity

20 20

21 Comparison of Options 21 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher515250925062488148204620453447435-2433-2 St. Elizabeth Seton5163530454045354541451835002485246314691 Alton405-9447-7514-4549-25886532670369557024 4 Total 1436-414861560215723161131633516234162751600316043 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher 495148514790458449425-2416-2408-3 396-3394-3 St. Elizabeth Seton 53645545567556555746555553745243 50225083 Alton 405-9447-7514-4549-2588653267036954 7024 4 Total 1436-41486156011572216114163351623516274 1600316044 Option 1 Option 2 SCHOOL 2012 Portable 2013 Portable 2014 Portable 2015 Portable 2016 Portable 2017 Portable 2018 Portable 2019 Portable 2020 Portable 2021 Portable St. Christopher4690452438-2414-3406-3378-4362-5358-5353-5352-5 St. Elizabeth Seton5625587660876097617760275916574654545504 Alton405-9447-7514-4549-25886532670369547024 4 Total 1436-41486-21560115722161131633516234162751600316043 Option 3

22 Feedback Requested Please take the time to provide us with your comments and your preferred Option Comments are required by January 20, 2012 The Committee will review all of your feedback 22

23 Next Steps Jan 20, 2012 - Community input is due Feb 7, 2012 – Committee Final Report presentation to the Board Feb 21, 2012 – Public Delegations to the Board and Board approval of new school boundaries 23

24 Questions 24

25 25 Thank you!


Download ppt "Alton Village School Boundary Review Interim Report 1."

Similar presentations


Ads by Google