Presentation is loading. Please wait.

Presentation is loading. Please wait.

Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007.

Similar presentations


Presentation on theme: "Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007."— Presentation transcript:

1 Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007

2 11/11/2007James E. MacIsaac, P.E.2

3 11/11/2007James E. MacIsaac, P.E.3

4 11/11/2007James E. MacIsaac, P.E.4

5 11/11/2007James E. MacIsaac, P.E.5

6 What Was the R&T Package?  RTID (Regional Roads Package) Initially an $18 billion capital program to improve highways of statewide significance Reduced by half to allow a “Balanced” Roads and Transit Package  Sound Transit ST2 Package Started out as a Phase 2 program of 80 transit projects desired by participating agencies Emerged as mostly a 50-mile extension of Sound Transit’s Light Rail System 11/11/20076James E. MacIsaac, P.E.

7 11/11/2007 Central Link LRT Promise at $2.3 B Delivery at $4.2 B 18 miles with 12 Stations 24 miles with 21 Stations 2016? ?? ST1/ST2 LRT Plan 70 miles with 34 Stations Total - $21 Billion 7James E. MacIsaac, P.E. Completion by 2006 “Initial Segment” by 2010

8 All-or-Nothing Ballot  Forced by State Legislature seeking combined support  Total Package Tax: +1.0% Sales Tax plus 0.8% MVET  20% of state sales tax would go to transit  Tax Sunset Years RTID – Would Sunset in 2037 ST1 & ST2 – Hopeful reduction after 2057 bond payoff (but no law commitment) 11/11/20078James E. MacIsaac, P.E.

9 Campaign Approach  It Costs too much …  And it Does so Little! 11/11/2007James E. MacIsaac, P.E.9

10 R&T Package Cost Cap Cost 2006$ ST1 Extend N.A. ST2 $11 b RTID $7 b Totals $18 b 11/11/2007James E. MacIsaac, P.E.10 Full Cost YOE$ N.A. $23.6 b $14.5 b $38.1 b 2008-2027 (20-year Capital Development Period) Post 2027 Bond Interest $9.3 b $47.4 b

11 $157 Billion R&T Tax Proposal*  RTID (Roads) – $8.0 b $16 b  ST1 Extension – $14.8 b $64 b  Sound Transit – $11.7 b $77 b  Total Tax Authorization $34.5 b $157 Billion Total Tax Collections: 2008-27 2008-57 (10%) 11/11/200711James E. MacIsaac, P.E. * Source: Sound Transit estimates thru 2040, extended to 2057. Why thru 2057 for ST2? Because Sales Tax Revenues will be used to secure the ST2 Bonds with payoff extending thru 2057. ST uses legal means to extend tax collections.

12 Post-Elect Advise to Supporters  "Release one price tag and don't mention another number, ever. So many cost figures were discussed, the public was never certain which was correct. The mentality became, ‘if the experts don't know the true cost, how would we?’ “ … Seattle Times 11/11/2007James E. MacIsaac, P.E.12

13 Regional Transit Ridership Average Weekday: 2030 w/o ST2* Total Person Trips 13,200,000 Total Transit Trips** 482,000 Transit Mode Share*** 3.7% Transit “Boardings” 661,000 Transfer Rate 1.37 * Includes ST1 With Central Link from Airport to UW Stadium. ** Source: ST Making Connections, Appendix C, June 2007 With ST2 Change 13,200,000 556,000 +74,000 4.2% +0.5% 818,000 +157,000 1.47 2.12 Within Sound Transit Service Area 11/11/200713James E. MacIsaac, P.E. *** 2006 Mode Share – 2.9%; Transfer Rate – 1.29.

14 ST2 Effect on Regional Travel  ST1 and ST2 reflect a Light Rail Transit Overlay of transit services to downtown Seattle  But downtown Seattle represents only 10% of Region’s jobs  The ST2 effect on the Balance of the Region is negligible  Following are proportions of tri-county trips generated by three subsectors and the share of those trips served by transit:* Percent of Transit Mode Shares Region Subsector Total Trips 1998 Base 2030 w/ST1&2 Seattle CBD 5%- 27% 44% Balance of Seattle 20-18% 4.5% 6.5% Balance of Region 75-77% 0.5% 0.7% Total Region 100% 2.7% 3.7% *Source: PSRC 2006 MTP Update. 11/11/200714James E. MacIsaac, P.E.

15 Our Campaign Approach  “It Costs too much, and does so little”  $157 BILLION Dollars  H e e r r e e’ s Doug 11/11/200715James E. MacIsaac, P.E.

16 11/11/2007James E. MacIsaac, P.E.16


Download ppt "Prepared for Presentation to the American Dream Coalition By Emory Bundy, Jim MacIsaac and Doug Simpson November 11, 2007 Defeated on Nov 7, 2007."

Similar presentations


Ads by Google