AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.

Similar presentations


Presentation on theme: "AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office."— Presentation transcript:

1 AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : http://rsvp.bnl.gov C-AD AGS Project: Office http://server.c-ad.bnl.gov/esfd/RSVP/RSVP_AGS_WBS.htm Agenda –Guidance and Upcoming reviews (Pile) –Update on AGS/BOOSTER WBS 1.4.1 cost scrubbing & short term spending plan (Brown) –Update on beam development plan (Ahrens) –Status of resource loaded schedules and short term spending plan for Switchyard (Pendzick)

2 AGS RSVP Weekly Meeting P. Pile 2 December 2004 Preliminary Guidance – our plan (subject to change – we have not yet received guidance from Willis/Kotcher as result of 4-5 Nov AGS Review – no change since 18 Nov meeting) Continue cost scrubbing and schedule development Highest priority to AGS/BOOSTER WBS 1.4.1 –Cost scrubbing, what can we postpone until operations phase? etc… –Schedule – in particular a plan to get the AGS/BOOSTER in shape for high intensity beam development --- by beginning of 3 rd year of construction? –Beam development plan that fits within constant effort RHIC budget scenario with 2 beams – i.e. figure on 80 hrs/week and 15 weeks/year Case 1: Beam development during entire 5 year construction period Case 2: Beam development beginning 3 rd year of construction The construction plan should be developed consistent with no beam development in first two years of the project (Case 2 above) –D-line decommissioned –C-Line available beginning of 3 rd year for tests –there’s a risk (small) that we may have to revert back to the original plan (Case 1).

3 AGS RSVP Weekly Meeting P. Pile 2 December 2004 MilestoneDateStatus, Comments Discussion of Baseline Expectations, Timeline with Experiments September 13Held MECO Magnet ReviewSun-Tue, Oct 10-12Held AGS ReviewThu-Fri, Nov 4-5Held Internal discussion of resource-loaded schedules (RLS) for all projects Thu, Dec 9Includes PO, NSF PM, ALD + experiments. One full day. Simulations & Backgrounds ReviewTue-Thu, Jan 11-13Set, reviewers assembled, held at NYU Initial review of RLS for all projectsTue-Thu, Jan 18-20Reviewed by LOG. Dates TBF. Reviews of other sub-projectsWeeks of Jan 24 – Feb 21Series of LOG-based reviews of RSVP sub-systems Draft versions of PMP, PEP, Conceptual Design Report completed Mon, Feb 14 Operations ReviewWeek of Mar 7 Project startup pre-reviewWeek of Mar 15Comprehensive preparatory review of full project, proposal Project startup reviewWeek of Apr 18Final project startup review, iteration of above. NSF review. Finalize documentation for May submission to NSF Week of Apr 25 Product submitted to NSF/NSBMon, May 2 next significant events AGS/Booster cost and schedule ~complete Case1 and Case2 beam development plans ~complete DRAFT Resource Loaded Schedule available Experiment WBS’s work-in- progress Roadmap to Resource Loaded Schedule understood, some cost scrubbing K0PI0 and MECO Experiment Simulations Review

4 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004 Goals and expectations of the meeting: – This meeting is intended to provide the opportunity for an open, frank discussion of the projects' status and outlook – Status report of what is in place with regard to project planning for the three projects – The current confidence of the Project Managers in the estimates they have so far. – Project Managers' plans for how any missing or incomplete items will be tackled over the coming months. Agenda: (Orange Room, Physics, attendance by invitation) – 2 hours each: KOPIO (M. Marx), MECO (M. Hebert) and AGS (P. Pile) Detailed Guidance: http://server.c-ad.bnl.gov/esfd/RSVP/guidance.pdf

5 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

6 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

7 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Cost and Schedule Review, 9 Dec 2004

8 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

9 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

10 AGS RSVP Weekly Meeting P. Pile 2 December 2004 RSVP Simulation and Background Review Committee –Ed Blucher, University of Chicago –Martin Cooper, Los Alamos –Cy Hoffman, Los Alamos –Patty McBride, Fermilab –Jack Ritchie (Chair), University of Texas, Austin –Mike Shupe, University of Arizona –Bob Tschirhart, Fermilab –Koji Yoshimura, Osaka University Charge and Agenda: http://server.c-ad.bnl.gov/esfd/RSVP/RSVP_Simulations_ChargeAgenda_.pdf RSVP Detector Capabilities, Simulations and Backgrounds Review (11-13 Jan 2005 at NYU)

11 AGS RSVP Weekly Meeting P. Pile 2 December 2004 Next Meeting 16 Dec 2004 Agenda –TBD