Download presentation
Presentation is loading. Please wait.
Published byAmbrose Floyd Modified over 8 years ago
1
445 BALTIC STREET RETROFIT MODEL: WET FLOODPROOFING
2
BUILDING SUMMARY LandlordFifth Avenue Committee ZoneR6 Evacuation Zone2 Residential Units5 Stories4 BasementYes Structure TypeBrick Elevator?Walk Up Year Built1900 Year Altered1997 SubsidyLIHTC Subsidy Start Year1998
3
KEY LONG-TERM RESILIENCE CHALLENGES 1.Basement flooding 2.Flooding from attached building 3.Equipment is located below BFE 4.Basement is accessed through an exterior hatch 5.Others?
4
PROPOSED SOLUTION WET FLOODPROOFING
5
WET FLOODPROOFING DETAILS
6
WET FLOODPROOFING IMPLEMENTATION PLAN
7
WET FLOODPROOFING REGULATORY BARRIERS
8
WET FLOODPROOFING OTHER CHALLENGES
9
MOST COST-EFFECTIVE SOLUTION (NOTE: If you find a solution that will be more cost effective in the long run that wet floodproofing, please use the following supporting slides to illustrate the idea and its challenges.)
10
COST-EFFECTIVE SOLUTION DETAILS
11
COST-EFFECTIVE SOLUTION IMPLEMENTATION PLAN
12
COST-EFFECTIVE SOLUTION REGULATORY BARRIERS
13
COST-EFFECTIVE SOLUTION OTHER CHALLENGES
14
BEST SOLUTION (NOTE: If you find a solution that team agrees is better for this building than what you’ve already addressed, please use the following supporting slides to illustrate the idea and its challenges.)
15
BEST SOLUTION DETAILS
16
BEST SOLUTION IMPLEMENTATION PLAN
17
BEST SOLUTION REGULATORY BARRIERS
18
BEST SOLUTION OTHER CHALLENGES
19
Are any or all of these solutions models for retrofitting other, similar buildings? DISCUSSION QUESTIONS
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.