Presentation is loading. Please wait.

Presentation is loading. Please wait.

CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006.

Similar presentations


Presentation on theme: "CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006."— Presentation transcript:

1 CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006

2 CDI - Statistics September 2006 65 Participants 636 Ship owners 2642 ships on the database 1497 ships active 1533 inspections per year 5367 accesses per year (AR 3.5) 73 Accredited Inspectors

3

4 1 st April 2007 SIR 6 th Edition And ISIS-Web7

5 SIR 6th Edition - Crew Matrix - Verification of crew knowledge & proficiency - 3 month validity for gas free ships - Focus on ‘’physical’’ inspection - Original Protocol, Amendment page, Revision - Guidance notes become living document - Testing for compliance rather than the --existence of now mandated procedures - ER Machinery, lifeboat equipment – random 5

6 ISIS-Web7 - print,.pdf, MS Excel, XML - MSDS - EQUASIS Ship File - Casualty information - Ship owner comments page for the ship - Totally web-based - Reports in Progress, Active Reports – All Go - Ship name (IMO) and User default parameter

7 CDI Chemical Distribution Institute End of Slide Show www.cdi.org.uk

8 CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006 Part 2

9 80 Inspection requests in process today 517 Inspection Requests processed. 95 Cancellations (18%) - change of orders - oil major inspections - ship delayed, inspector released - too short notice - failure to reach agreement 15 complaints 8% increase in negative answers 9% reduction in inspections MRSCDI 2006 August 18th

10

11

12 5.1Inspection Fees Inspection fees are not fixed or suggested by CDI-mid. In compliance with EU Competition Law and US Anti- Trust Law, fees are to be agreed between the requesting party and the individual inspector. Under the procedures of Accreditation, ship inspectors are not permitted to collude on inspection fees.

13 5.5Rejection of Appointed Inspector In the event that the requesting party and appointed inspector are unable to reach agreement, and based on a declared ‘’motivated reason’’ the requesting party may request a second alternative inspector. The requesting party must then choose between first and second appointments.

14 CDI Chemical Distribution Institute End of Slide Show - again www.cdi.org.uk


Download ppt "CDI Chemical Distribution Institute INTERTANKO Vetting Seminar London, 2 nd October 2006."

Similar presentations


Ads by Google